Honeywell TG509 Versaguard Large Universal Clear Thermostat Guard Installation Guide

June 2, 2024
Honeywell

Honeywell TG509 Versaguard Large Universal Clear Thermostat Guard

Honeywell TG509 Versaguard Large Universal Clear Thermostat
Guard

INSTALLATION

  1. Mount guard base over existing thermostat or use optional guard wall plate (see Fig. 1 and Fig. 2).
  2. Mount guard cover and lock guard.
  3. Apply nameplate (select models) to guard cover.
    Fig. 1. Mount guard and thermostat to wall
    Installation
    Fig. 2. Mount guard wall plate with guard base and thermostat on junction box.
    Installation

CUSTOMER SUPPORT

Automation and Control Solutions

® U.S. Registered Trademark
© 2007 Honeywell International Inc.
69-2082EFS—03 M.S. Rev. 10-07
Printed in USA on recycled paper containing at least 10% post consumer paper fibers.

Honeywell International Inc
1985 Douglas Drive North
Golden Valley, MN 55422
customer.honeywell.com
Logo

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Honeywell User Manuals

Related Manuals