NPYSVSSS B0CKHVM7DS 4 Way Shower Diverter Thermostatic Valve Instruction Manual
- May 15, 2024
- NPYSVSSS
Table of Contents
NPYSVSSS B0CKHVM7DS 4 Way Shower Diverter Thermostatic Valve
List of accessories
Install hand wheel
Display of structure
Installation Step
- Use the sucker to remove the lid
- Place the cylinder into the panel
- Tighten with screws
- Place the lid in the cylinder
Conversion between G1/2″ and NPT1/2″
Diversified connection port options
Adjustable installation
-
The installation height can be adjusted.
After the ceramic tile is pasted, the protective sleeve exposed to the surface of the ceramic tile can be removed -
Install the panel in the light hole position to fit onto the tile surface.
Depth And Dimensions Of The Main Buried Wall
- Arrange the pipe and embedded hole positions in advance with reference to the above dimensional drawing.
- The connection of hot and cold water pipes must be installed as required by the diagram.
- Before embedding the main body, please clean the sediment in the pipe to avoid blockage and affect normal use.
- After installation, open the water source and test for 24 hours under pressure to see if there is leakage.
Please do not hesitate to contact us with your questions, concerns, and/or problems, we’re here to help. Customer Support: NPYSVSSS@126.com.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>