NPYSVSSS 16 Inch Dual Function Thermostatic Shower System Installation Guide
- May 15, 2024
- NPYSVSSS
Table of Contents
Installation Manual
16″ Dual Function Thermostatic Shower System
16 Inch Dual Function Thermostatic Shower System
Please do not hesitate to contact us with your questions, cocerns and/or
problems,we’re here to help.
Customer Support: NPYSVSSS@126.com
Installation Steps of Valve Body
Step 1: Determine the position of the valve. Then drill, hammer in the anchors, fasten the valve body to the wall.
Step 2: Connect eachtakcover, then connect the water source to confirm that there is no leakage.
Step 3: Adjust the embedded body to the horizontal line,and fix the embedded body on the wall with a cross screwdriver to lock the 4 self-tapping screws. Seal the pipe line with cement filler.
Step 4: Balance the panel on the main body,Put on the knobs and accessories.
Complete installation view
Something you may need to know
Installation Steps of Hand Shower
-
Wrap supply elbow threadwith Teflontape and attach cover plate to it.
-
Screw the shower holderclockwise onto thehand shower outlet.
-
Place rubber washers in both ends of the hose.Connect the shower hose to the supply elbow andshower head. Note the ends ofshower hose to beconnected correctly.
Installation Steps of Shower head
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>