CyberPower Double MPPI Racket Narrow Plhcase Grid Tied Inverter User Guide

May 15, 2024
CyberPower

CyberPower-LOGO

CyberPower Double MPPI Racket Narrow Plhcase Grid Tied Inverter

PACKAGE CONTENTS

CyberPower-Double-MPPI-Racket-Narrow-Plhcase-Grid-Tied-Inverter-
\(1\)

DIMENSIONS

CyberPower-Double-MPPI-Racket-Narrow-Plhcase-Grid-Tied-Inverter-
\(2\)

INSTALLATION

  1. The walls must be fireproof and non-flammable materials, otherwise there is a fire risk.
  2. Before drilling holes, check whether there are electric power pipes or other pipes buried in the walls to avoid risks.

Note: The following steps are only illustrated by the type A bracket .CyberPower-Double-MPPI-Racket-Narrow-Plhcase-Grid-Tied-Inverter-
\(3\)

INSTALLATION LOCATION

CyberPower-Double-MPPI-Racket-Narrow-Plhcase-Grid-Tied-Inverter-
\(4\)

GROUNDING

Ensure that inverter and all cables to be installed are completely powered oft during whole installation and connection. Otherwise, fatal injury can occur due to the high voltage caused by AC and DC cables.CyberPower-Double-MPPI-
Racket-Narrow-Plhcase-Grid-Tied-Inverter- \(5\)

AC CONNECTION

Before connecting the AC terminal, ensure that both the AC terminal and the DC terminal are powered OFF and the DC switch is OFF. Otherwise, there is a risk of high voltage shock.

Note: There are four types of AC terminals. Please refer to the object in the delivery. Type A is in usual.
Whether you use type A, B, C or D, tighten the waterproof nut to avoid loosening. Take type A as an example in the following steps.CyberPower-
Double-MPPI-Racket-Narrow-Plhcase-Grid-Tied-Inverter-
\(6\)

The wiring process of type B, type C, type D are shown as below.
Note: Whether you use type A, B, C or D, tighten the waterproof nut to avoid loosening.CyberPower-Double-MPPI-Racket-Narrow-Plhcase-Grid-Tied-
Inverter- \(6\)

PV CONNECTION

  1. Photovoltaic arrays exposed to sunlight will generate dangerous voltages!
  2. Before connecting the DC terminal, ensure that both the AC terminal and the DC terminal are powered OFF and the DC switch is OFF. Otherwise there is a risk of high voltage shock.

CyberPower-Double-MPPI-Racket-Narrow-Plhcase-Grid-Tied-Inverter-
\(8\)

Note: DC cable should be dedicated PV cable (suggest using 4~6mm PV1 -Fcable).

INSPECTION

  1. The inverter is firmly installed.
  2. There is enough heat dissipation space, and no external objects or parts left on the inverter.
  3. It is convenient for operation and maintenance.
  4. The wiring of the system is correct and firm.
  5. Check whether the DC and AC connections are correct with a multimeter and whether there is a short circuit, break, or wrong connection.
  6. Check whether the waterproof nuts of each part are tightened.
  7. The vacant port has been sealed.
  8. All safety labels and warning labels on the inverter are complete and complete without occlusion or alteration.

STARTUP / SHUTDOWN INVERTER

CyberPower-Double-MPPI-Racket-Narrow-Plhcase-Grid-Tied-Inverter-
\(9\)

After the inverter is powered off, the remaining electricity and heat may still cause electrical shock and body burns. If need to disconnect the inverter cables, please wait at least 5 minutes before touching these parts of inverter.

As the technology is constantly updated and improved, the illustrations in this document are for reference only.
Contents including illustrations in this document are subject to change without notice.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals