Schneider Electric EVA1MM Pro AC Embedded 4G Modem for EVlink Instruction Manual

May 15, 2024
Schneider Electric

Schneider Electric EVA1MM Pro AC Embedded 4G Modem for EVlink

OTHER MODELS

  • EVA1MS

  • EVA1MM

Customer Care Center

Modem Installation

| | https://www.youtube.com/watch?v=XZlwfECY5pE
Modem Configuration With eSetup

|

| https://www.youtube.com/watch?v=xo0-q_HU-h8&t=97s

PLEASE NOTE

  • This device must be installed and serviced by a qualified electrician.
  • All applicable local, regional and national safety standards and regulations must be complied with during the installation and use of this device.
  • The manufacturer disclaims all liability in the event of non-compliance with the instructions on this sheet.
  • The modem can only be used if GSM network coverage is provided by the operator.

DANGER

HAZARD OF ELECTRIC SHOCK, EXPLOSION OR ARC FLASH

  • Turn off all power supplying the charging station before working on the charging station.
  • Use a voltage tester of appropriate rating.
    Failure to follow these instructions will result in death or serious injury.

NOTICE

RISK OF RADIO INTERFERENCE

  • In operation, the modem may emit electromagnetic signals that can interfere with different embedded systems.
  • Do not use the modem in areas where the use of mobile communications is limited or prohibited.
    Failure to follow these instructions can result in equipment damage.

Content

NOTICE

HAZARD OF ELECTROSTATIC DISCHARGE OR POWER SURGE

  • Do not touch the electronic boards.
  • Use anti-static protection when making connection operations inside the charging station.
    Failure to follow these instructions can result in equipment damage.

Required for Installation

PLEASE NOTE

  • The modems EVA1MS and EVA1MM are compatible with charging station software version 1.2.1 or higher (use eSetup to find the software version of your charging station).
  • For a charging station with an earlier software version, update the software by using eSetup.


eSetup app – Google store

eSetup app – Apple store

Micro SIM card

For EVA1MM only

SIM Card Installation

Daisy Chain

  • The installation of a 4G modem in one charging station allows communication with up to 10 charging stations.
  • For the commissioning of a charging stations cluster, see chapter 6.

To make a daisy chain connection of the charging stations , consult the instruction sheet NNZ1940301.

|
---|---

Modem EVA1MS Installation

Remove Front Cover

To remove the front cover of the Evlink Pro AC charging station, consult the instruction sheet NNZ1940301.

|
---|---

Modem Installation

NOTICE

HAZARD OF MODEM DAMAGE
Take all necessary precautions when handling and installing the modem in the connector on the motherboard.
Failure to follow these instructions can result in equipment damage.

Main Antenna Installation

Antenna Installation

Routing the Antenna Wires

Connecting Antennas to the Modem

NOTICE

HAZARD OF MODEM DAMAGE
Take all necessary precautions to connect the antenna connector to the modem.
Failure to follow these instructions can result in equipment damage.

Reinstall Front Cover

NOTICE

HAZARD OF EQUIPMENT DAMAGE
Be careful not to pinch electrical wires when installing front cover.
Failure to follow these instructions can result in equipment damage.

To reinstall the front cover of the Evlink Pro AC charging station, consult the instruction sheet NNZ1940301.

|
---|---

Modem EVA1MM Installation

Remove Front Cover

To remove the front cover of the Evlink Pro AC charging station, consult the instruction sheet NNZ1940301.

|
---|---

Preparation

Modem Installation

NOTICE

HAZAR D OF MODEM DAMAGE
Take all necessary precautions when handling and installing the modem in the connector on the motherboard.
Failure to follow these instructions can result in equipment damage.

Antenna Installation

EVA1RWKS1

EVA1RFKS1
EVA1RFKS2

The notch for the installation of the antenna must be positioned at the top of the side plate. Refer to the instruction sheet JYT24397 or JYT24398 to invert the side plate if the notch is positioned at the bottom.

|
---|---
|
---|---


EVlink Pro AC Installation

To install Evlink Pro AC charging station in the metal enclosure, consult the instruction sheet JYT24397, JYT24398 or JYT24399.

Antenna Wire Routing

Connecting the Antenna to the Modem

NOTICE

HAZARD OF MODEM DAMAGE
Take all necessary precautions to connect the antenna connector to the modem.
Failure to follow these instructions can result in equipment damage.

Reinstall Front Cover

NOTICE

HAZARD OF EQUIPMENT DAMAGE
Be careful not to pinch electrical wires when installing front cover.
Failure to follow these instructions can result in equipment damage.

To reinstall the front cover of the Evlink Pro AC charging station, consult the instruction sheet NNZ1940301.

|
---|---

Commissioning

DANGER

HAZARD OF ELECTRIC SHOCK, EXPLOSION OR ARC FLASH

  • Apply appropriate personal protective equipment (PPE) and follow safe electrical work practices. See NFPA 70E, CSA Z462, NOM-029-STPS or local equivalent.
  • Take all measures necessary to avoid the risk of electrocution when the external power supply voltage is greater than 30 Va.
  • Put back all devices, doors, and covers before turning on power to this equipment.
  • Beware of potential hazards, and carefully inspect the work area for tools and objects that may have been left inside the equipment. Failure to follow these instructions will result in death or serious injury.

Modem Configuration With eSetup

Google store

Apple store

  1. Download eSetup
  2. Connect via Bluetooth®
    • Bluetooth connection with eSetup is possible for 2 hours after the first time the charging station is powered on.
    • After these 2 hours, use an activation badge to reactivate the Bluetooth communication for 10 minutes :
    • In factory settings, any badge is considered as an activation badge
    • After an initial configuration, only an administrator badge configured via eSetup can activate Bluetooth communication.
    • Bluetooth communication remains active for 10 minutes after closing a configuration session via eSetup.
    • At the first connection, you will be asked to create a password to secure the next connection to the charging station.
    • At the next connections this password will be necessary. The number of attempts to enter the password is limited to 3.
  3. Configure the modem

Commissioning of a charging stations cluster

Before starting configuration, it is recommended to switch off all charging stations of the cluster.
There should not be other devices than EVlink Pro AC in the cluster.

  1. Power on the charging station with embedded modem only.
  2. Connect this charging station with eSetup.
  3. Start connectivity configuration by activating the embedded modem (1).
  4. Set DHCP OFF and activate DHCP server (2), don’t restart the charging station at this stage.
  5. Configure the supervision (3).
  6. Restart the charging station

  1. Power on the next charging station of the cluster without embedded modem.
  2. Connect this charging station with eSetup.
  3. Check that DHCP is ON.
  4. Configure the supervision (3).
  5. Restart the charging station.
  6. Repeat operations 7, 8, 9, 10 and 11 on remaining charging stations of the cluster.
  7. Check the cluster configuration with eSetup from the charging station with embedded modem.

(1) You need an APN name. For PAP, CHAP or PAP-CHAP authentication, a username and password are required. This information are provided by your SIM card supplier.
(2) You may need to update your network settings.
(3) You need an URL address, charging station identifier and (optional) password provided by your charging station management system.

Radio Frequency Compliance Statements

EU Declaration of Conformity

Hereby, Schneider Electric Industries SAS, declares that the modems EVA1MS and EVA1MM used in EVlink Pro AC offer are in compliance with the essential requirements and other relevant provisions of RE Directive 2014/53/EU.
The EU EV22090601 declaration of conformity can be downloaded on www.se.com/docs.
Frequency bands in which the radio equipment operates:

  • 2G operating frequencies:
  • GSM 900 (Tx 880-915MHz max 33.2dBm EIRP, Rx 925-960MHz)
  • GSM 1800 (Tx 1710-1785MHz max 29.6dBm EIRP, Rx 1805-1880MHz)
  • 3G operating frequencies:
  • WCDMA Band I (Tx 1920-1980MHz max 23.4dBm, Rx 2110-2170MHz)
  • WCDMA Band III (Tx 1710-1785MHz max 23.4dBm, Rx 1805-1880MHz)
  • WCDMA Band VIII (Tx 880-915MHz max 23.4dBm, Rx 925-960MHz)
  • 4G operating frequencies:
  • LTE FDD Band 1 (Tx 1920-1980MHz max 24.0dBm, Rx 2110-2170MHz)
  • LTE FDD Band 3 (Tx 1710-1785MHz max 24.0dBm, Rx 1805-1880MHz)
  • LTE FDD Band 7 (Tx 2500-2570MHz max 24.0dBm, Rx 2620-2690MHz)
  • LTE FDD Band 8 (Tx 880-915MHz max 24.0dBm, Rx 925-960MHz)
  • LTE FDD Band 20 (Tx 832-862MHz max 24.0dBm, Rx 791-821MHz)
  • LTE FDD Band 28A (Tx 703-733MHz max 24.0dBm, Rx 758-788MHz)
  • LTE TDD Band 38 (Tx 2570-2620MHz max 24.0dBm, Rx 2570-2620MHz)
  • LTE TDD Band 40 (Tx 2300-2400MHz max 24.0dBm, Rx 2300-2400MHz)

United Kingdom

Declaration of Conformity
Hereby, Schneider Electric Industries SAS, declares that the modems EVA1MS and EVA1MM used in EVlink Pro AC offer are in compliance with the essential requirements and other relevant provisions of Radio Equipment Regulations SI 2017 No. 1206.
The UK EV22090601-UK declaration of conformity can be downloaded on www.se.com/uk/docs. Frequency bands in which the radio equipment operates:

  • 2G operating frequencies:
  • GSM 900 (Tx 880-915MHz max 33.2dBm EIRP, Rx 925-960MHz)
  • GSM 1800 (Tx 1710-1785MHz max 29.6dBm EIRP, Rx 1805-1880MHz)
  • 3G operating frequencies:
  • WCDMA Band I (Tx 1920-1980MHz max 23.4dBm, Rx 2110-2170MHz)
  • WCDMA Band III (Tx 1710-1785MHz max 23.4dBm, Rx 1805-1880MHz)
  • WCDMA Band VIII (Tx 880-915MHz max 23.4dBm, Rx 925-960MHz)
  • 4G operating frequencies:
  • LTE FDD Band 1 (Tx 1920-1980MHz max 24.0dBm, Rx 2110-2170MHz)
  • LTE FDD Band 3 (Tx 1710-1785MHz max 24.0dBm, Rx 1805-1880MHz)
  • LTE FDD Band 7 (Tx 2500-2570MHz max 24.0dBm, Rx 2620-2690MHz)
  • LTE FDD Band 8 (Tx 880-915MHz max 24.0dBm, Rx 925-960MHz)
  • LTE FDD Band 20 (Tx 832-862MHz max 24.0dBm, Rx 791-821MHz)
  • LTE FDD Band 28A (Tx 703-733MHz max 24.0dBm, Rx 758-788MHz)
  • LTE TDD Band 38 (Tx 2570-2620MHz max 24.0dBm, Rx 2570-2620MHz)
  • LTE TDD Band 40 (Tx 2300-2400MHz max 24.0dBm, Rx 2300-2400MHz)

Recycling Packaging

The packaging materials from this equipment can be recycled. Please help protect the environment by recycling them in appropriate containers.
The Bluetooth® word mark and logos are registered trademarks owned by Bluetooth SIG, Inc. and any use of such marks by Schneider Electric is under license. Other trademarks and trade names are those of their respective owners.

CUSTOMER SUPPORT

Schneider Electric Industries SAS 35, rue Joseph Monier CS 30323
F – 92506 Rueil Malmaison Cedex www.se.com
Schneider Electric Limited

Stafford Park 5
Telford, TF3 3BL
United Kingdom
www.se.com/uk

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Schneider Electric User Manuals

Related Manuals