PORTOS Double Pleated Mosquito Net Installation Guide

May 15, 2024
PORTOS

INSTALLATION MANUAL
OF A DOUBLE PLEATED
MOSQUITO NET
IN THE RECESS
PORTOS Double Pleated Mosquito Net

Double Pleated Mosquito Net

Prior to any mosquito net installation works, read the following installation manual.
All and any changes or modifications to the structure of the mosquito net are permissible only after prior consultation with the manufacturer. The mosquito net must always be installed on even surfaces.
The mosquito net shall be installed only by competent personnel, properly trained in OHS rules and applicable construction laws.
Directly prior to installation, the mosquito net shall be unpacked and checked for completeness of all parts necessary for its installation.

Tools necessary for the installation of the mosquito net:

  • Drill-driver
  • Drilling machine with a set of drill bits
  • Allen wrench 4mm
  • PencilPORTOS Double Pleated Mosquito Net - Drill-driver

The kit supplied by PORTOS excludes any screws or screw anchors. At the stage of installation, particular attention shall be paid to the cords of the pleated mosquito net. The cords must be of equal length, must be arranged parallelly and must never be twisted together. This is crucial for correct mosquito net installation works.

INSTALLATION IN THE RECESS

PORTOS Double Pleated Mosquito Net - INSTALLATION IN THE
RECESS

  1. Using the 4.2 drill bit, drill the mounting holes in the upper rail of the mosquito net. The holes shall be drilled at every 50 cm and there shall be at least 3 holes in each profile.PORTOS Double Pleated Mosquito Net - PLEATED MOSQUITO NET

  2. Fit the upper slat of the mosquito net in the upper recess of the door opening, mark and drill holes for the screw anchors.PORTOS Double Pleated Mosquito Net - opening

  3. Connect the two bottom slats using the cord lock (1). The bottom slats shall be attached to the surface underneath by using the adhesive tape at the slat bottom.PORTOS Double Pleated Mosquito Net - bottom

  4. Drill the mounting holes in the lateral profile of the mosquito net through the profile and the magnet (1), using the 3.5 drill bit.
    The holes shall be drilled at every 50 cm and there shall be at least 3 holes in each profile. The bottom part of the profile shall be ended with the end cap (2).PORTOS Double Pleated Mosquito Net - MOSQUITO

  5. First, insert the lateral profile ended with the end cap in the bottom slat (1) by sliding the end cap into the slat, next slide the profile towards the mounting frame at the recess side, make sure that the upper part of the lateral profile gets fitted into the upper profile (2).
    On the wall, mark position of the holes (3), remove the lateral profile. Next, drill holes for the screw anchors (4). Screw the lateral profile, ended with the end cap, to the wall (5).PORTOS Double Pleated Mosquito Net - drill
holes

  6. Start the installation of the mosquito net package from inserting the bottom part of the profile into the protruding mandrel of the bottom end cap on the lateral profile. Holding the package, remove the protection (paper tape) before unfolding the mosquito net.PORTOS Double Pleated Mosquito Net - lateral

  7. Stretch the bottom cords of the mosquito net. Make sure they do not get entangled, twisted or bundled. Put cord ends (1) in the cord lock of the bottom rail (2). Stretch the upper cord (3) so that the bottom cord gets properly tensioned and blocked (4). Properly place the upper cords. Pay particular attention and make sure that they are not entangled, twisted or bundled. As shown in figure 5, slide the element of the cord lock (6) through the milled hole in the upper rail in such a manner…PORTOS Double Pleated Mosquito Net - PLEATED MOSQUITO NET

  8. that the lock end (1) is exactly in the middle of the upper rail. Fix the lock by tightening the socket head screws (2).PORTOS Double Pleated Mosquito Net - tightening

  9. Insert the second lock (2) in the same milled hole (1) in the upper rail, slide the lock in the direction opposite to the first lock (3), this way, you will stretch the mosquito net cords. Fix the lock by tightening the socket head screws (4).
    PORTOS Double Pleated Mosquito Net - screws

  10. Check if the mosquito net works properly. If high resistance is felt during the sliding motion, decrease the tensioning of the cords, as presented in point 9. The second package of the mosquito net shall be installed on the opposite side following the same instructions as given for the first package, i.e. following the steps explained in points 4-9.

WARNING – FOLLOWING THESE INSTRUCTIONS IS IMPORTANT FOR THE SAFETY OF PERSONS.
KEEP THESE INSTRUCTIONS

PORTOS TR7
ul. Ztota 71
62-800 Kalisz
tel 62 768 40 11
E-mail:[email protected]
www.portosrolety.pl

Documents / Resources

| PORTOS Double Pleated Mosquito Net [pdf] Installation Guide
Double Pleated Mosquito Net, Pleated Mosquito Net, Mosquito Net, Net
---|---

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

PORTOS User Manuals

Related Manuals