MH London AZMD13005WT Medallion Wood Hawke Installation Guide

June 17, 2024
MH LONDON

MH London AZMD13005WT Medallion Wood Hawke

Product Information

Specifications:

  • Model: AZMD13005WT
  • Time Display: 10:00
  • Estimated Installation Time: Varies
  • Number of People Required: 1 or more

Product Usage Instructions

Ok, let’s get started!

  • Put on mood music!
  • To prevent damage to product, use the clean side of package carton or rug as working surface.
  • In the event of missing or damaged parts, delivery problems etc., please reach out to our team.
  • We will be happy to fix the problem!

Care Guide:
Clean regularly with a soft and dry cloth. Avoid abrasive cleaners to protect the finish. Wipe up spills immediately.

Product Parts

  • A Medallion x1
  • (B) – Screw x2
  • (C) – Wall Plug x2

Installation Instructions

Step 1:
Measure the distance between the two sawtooths using a measuring tool.

Step 2:
Place the measuring tool against the wall and make two marks where you want to mount the medallion.

Step 3:
Drill holes at the points you just marked.

Step 4:
Using a hammer, insert the wall plugs (C) inside the holes.

Step 5:
Fix the screws (B) into the wall plugs (C). Use a screwdriver to ensure they are secure.

Step 6:
Place the sawtooths over the screws. Your medallion is now installed and secure!

Voila! Your medallion is now installed and secure!

FAQ

Q: What should I do if I encounter missing or damaged parts?
A: In case of missing or damaged parts, delivery problems, etc.,please reach out to our team for assistance. We are here to help resolve any issues.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals