MH London AZMD13005WT Medallion Wood Hawke Installation Guide
- June 17, 2024
- MH LONDON
Table of Contents
MH London AZMD13005WT Medallion Wood Hawke
Product Information
Specifications:
- Model: AZMD13005WT
- Time Display: 10:00
- Estimated Installation Time: Varies
- Number of People Required: 1 or more
Product Usage Instructions
Ok, let’s get started!
- Put on mood music!
- To prevent damage to product, use the clean side of package carton or rug as working surface.
- In the event of missing or damaged parts, delivery problems etc., please reach out to our team.
- We will be happy to fix the problem!
Care Guide:
Clean regularly with a soft and dry cloth. Avoid abrasive cleaners to
protect the finish. Wipe up spills immediately.
Product Parts
- A Medallion x1
- (B) – Screw x2
- (C) – Wall Plug x2
Installation Instructions
Step 1:
Measure the distance between the two sawtooths using a measuring tool.
Step 2:
Place the measuring tool against the wall and make two marks where you want to
mount the medallion.
Step 3:
Drill holes at the points you just marked.
Step 4:
Using a hammer, insert the wall plugs (C) inside the holes.
Step 5:
Fix the screws (B) into the wall plugs (C). Use a screwdriver to ensure they
are secure.
Step 6:
Place the sawtooths over the screws. Your medallion is now installed and
secure!
Voila! Your medallion is now installed and secure!
FAQ
Q: What should I do if I encounter missing or damaged parts?
A: In case of missing or damaged parts, delivery problems, etc.,please
reach out to our team for assistance. We are here to help resolve any issues.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>