MH London AZMD13005WT Medallion Wood Hawke Installation Guide
- June 17, 2024
- MH LONDON
Table of Contents
MH London AZMD13005WT Medallion Wood Hawke
Product Information
Specifications:
- Model: AZMD13005WT
- Time Display: 10:00
- Estimated Installation Time: Varies
- Number of People Required: 1 or more
Product Usage Instructions
Ok, let’s get started!
- Put on mood music!
- To prevent damage to product, use the clean side of package carton or rug as working surface.
- In the event of missing or damaged parts, delivery problems etc., please reach out to our team.
- We will be happy to fix the problem!
Care Guide:
Clean regularly with a soft and dry cloth. Avoid abrasive cleaners to
protect the finish. Wipe up spills immediately.
Product Parts
- A Medallion x1
- (B) – Screw x2
- (C) – Wall Plug x2
Installation Instructions
Step 1:
Measure the distance between the two sawtooths using a measuring tool.
Step 2:
Place the measuring tool against the wall and make two marks where you want to
mount the medallion.
Step 3:
Drill holes at the points you just marked.
Step 4:
Using a hammer, insert the wall plugs (C) inside the holes.
Step 5:
Fix the screws (B) into the wall plugs (C). Use a screwdriver to ensure they
are secure.
Step 6:
Place the sawtooths over the screws. Your medallion is now installed and
secure!
Voila! Your medallion is now installed and secure!
FAQ
Q: What should I do if I encounter missing or damaged parts?
A: In case of missing or damaged parts, delivery problems, etc.,please
reach out to our team for assistance. We are here to help resolve any issues.