ideal Evojet 2100kW Condensing Pressure Jet Boilers User Manual
- June 17, 2024
- IDEAL
Table of Contents
- ideal Evojet 2100kW Condensing Pressure Jet Boilers
- Product Information
- Usage Instructions
- FAQ
- OVERVIEW
- Features and specification
- DIMENSIONS AND CLEARANCES
- BOILER ASSEMBLY
- TECHNICAL SPECIFICATIONS
- SUGGESTED ENGINEERING SPECIFICATION
- WARRANTY
- CONTACT
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
ideal Evojet 2100kW Condensing Pressure Jet Boilers
Product Information
Specifications
- Model: EVOJET 2100kW
- Type: Pressure jet Floor standing
- Fuel Type: Dual fuel
- Part L: Compliant
- Output: 2100kW
- Boiler Dimensions: 1945mm (H) x 1800mm (W) x 4020mm (D)
- Weight: 4750 KG
- Efficiency: Full load – 98.2%, Part load – 108.7%, Seasonal – 96.0%
- Min Gas Pressure (Nat Gas): 20mbar
Usage Instructions
Dimensions and Clearances
Minimum Clearances:
- Front: Burner Length + 600mm (for access/maintenance), Boiler Length (for cleaning)
- Rear: 1000mm (Min)
- Sides: 1500mm (Min)
- Top: 1000mm (Min)
Boiler Assembly
Exploded View Key:
- Diffuser
- Hook
FAQ
-
Q: What is the efficiency of the EVOJET 2100kW boiler?
A: The efficiency of the boiler is Full load – 98.2%, Part load – 108.7%, and Seasonal – 96.0%. -
Q: What is the minimum gas pressure required for Natural Gas applications?
A: The minimum gas pressure required for Natural Gas applications is 20mbar.
OVERVIEW
Features and specification
The Evojet condensing range of pressure jet boilers is available in 14 models with outputs from 150-3000kW. Floor-standing boilers for applications in either single or multiple configurations.
- Up to 109.3% part load efficiency
- Designed to operate up to 40°C ΔT providing minimum flow rates are achieved
- Dedicated low temp return
- Stainless steel heat exchanger
- Triple flue passes for high operating efficiencies
- Multiple burner options are available (see page 3 for details)
- Modulation via 0-10 volt BMS, or RWF controller
DIMENSIONS AND CLEARANCES
BOILER ASSEMBLY
KEY
- Diffuser
- Hook
- Door
- Plait
- Washer
- Fumes chamber
- Washer
- Probe holder pocket
- Spring
- Protection
- Spring
- Cover
- Plait
- –
- Flange seal
- Burner flange
- Washer
- Glass
- Ring
- Test point
- Flue brush
- Mattress
- Mattress
- Plait
- Panelling assembly
- Flange seal
- Washer
- Washer
- Front panel
- Sifon
- Condensation outlet pipe
- Panelling assembly
- Panelling assembly
- Panelling assembly
- Plait
TECHNICAL SPECIFICATIONS
GENERAL
Burner and Gas Train selections for Natural Gas applications are based on
standard design requirements (as stated in IGE/UP/2) of 20mbar gas pressure
available at the appliance under max flow conditions. If this pressure is not
available, or the available gas pressure is higher, or for alternative fuel
types – please consult your sales contact for alternative matching.
Certain burner types will require a higher MINIMUM GAS PRESSURE and an
additional gas booster kit will be necessary. Confirm with your sales contact.
HYDRAULICS
BURNER (Low NOx)
FLUE/AIR INLET
ELECTRICAL (PRIMETECH CONTROL PANEL)
CONTROL/BOILER/BURNER OPERATION
BURNER MATCHING OPTIONS
Modulating and Low NOx options are available; please contact us for full details. Oil burners would be subject to confirmation that the fuel supply was a suitable type/grade. * Burner matching for LPG operation by special request.
SUGGESTED ENGINEERING SPECIFICATION
The Suggested Engineering Specification is wording designed for specifiers to copy and paste into their specifications to ensure the inclusion of Ideal Heating commercial boilers.
OVERVIEW
The boiler must be a fully automatically controlled, floor-standing condensing
boiler with a triple flue pass stainless steel heat exchanger. While they are
designed primarily for central heating purposes, in conjunction with a
suitable storage cylinder they can also be used to produce domestic hot water
on an indirect fully pumped sealed water system. All parts that come into
contact with the combustion gases are made from titanium-stabilised stainless
steel to ensure maximum resistance to the corrosive action of acid
condensation. The boiler must incorporate two return water connections to
facilitate multiple applications e.g. CH & DHW and enable the optimum
operating efficiency to be achieved. The boilers must be designed to operate
with Natural Gas, LPG or Oil (delete as required) using pressure-jet or
premixed burners. The burner specification will enable the choice of 2-stage,
Modulating, Low NOx, and Ultra Low NOx operation.
CONTROLS
The boiler control options must be selected at the time of purchase:
- Two Stage Burner
- Modulating Burner
- BMS 0-10V
- Oil & Dual Fuel
The boiler must include control features enabling set point adjustment, heating circuit control of one constant temperature, one variable temperature and one DHW circuit and safety lock out parameters including fault diagnosis for both boiler and external components such as sensors or pumps. Boiler capabilities must include, with the use of external components, frost protection, weather or room compensation and system pump control.
FLUE
The condensing boilers must be suitable for use with an open-flued application
in B23 configuration. The B23P configuration can only be used with a premix
gas burner.
HYDRAULIC
The condensing boiler must be suitable for connection to a fully pumped sealed
water system. All hydraulic connections including flow return and condensate
drain must be located on the bottom or rear of the boiler. The boiler must
have a maximum operating pressure of 6 bar and be suitable for heating and
indirect hot water systems.
DIMENSIONS
The condensing boiler must fit within maximum permitted floor space of 0.97m²
(150 and 210kW models)/1.23m² (270 and 350kW models)/1.47m² (450 and 900kW
models)/2.03m² (800 and 1000kW models)/2.40m² (1250kW model)/2.67m² (1450kW
model)/6.34m² (1750kW model)/7.04m² (2100kW model)/8.19m² (2700kW)
model/9.00m² (3000kW model).
MOUNTING / POSITIONING
The condensing boilers will be floor-standing.
EFFICIENCY
The condensing boilers are capable of high seasonal efficiencies with a
minimum requirement of 95.8% (Part L Vol.2 2022) and low NOx emissions between
43 – 65mg/kWh (47 – 70mg/Nm³) depending on the boiler model, using Low NOx
Natural Gas burner.
APPROVALS
The manufacturer must be ISO 9001 accredited
SPECIFICATION
The boiler must be capable of the below flow rates:
BOILER MODEL | MIN FLOW (L/H) |
---|---|
150 | 1,700 |
210 | 2,400 |
270 | 3,100 |
350 | 4,000 |
450 | 5,100 |
600 | 6,800 |
800 | 9,100 |
1000 | 11,400 |
1250 | 14,200 |
1450 | 16,500 |
1750 | 20,400 |
2100 | 24,500 |
2600 | 30,400 |
3000 | 35,000 |
WARRANTY
The boiler must be available with a 2-year warranty. Please note that the above information is correct at the time of publication. Ideal Heating pursues a policy of continuous improvement in the design and performance of its products and reserves the right to vary specifications without notice.
CONTACT
- idealheating.com | 01482 492251 | commercial@idealheating.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>