RHINO FLOORING Commercial Sheet Vinyl Wall Installation Guide

June 17, 2024
RHINO FLOORING

RHINO FLOORING Commercial Sheet Vinyl Wall

Installation Guide

Product Specifications:

  • Product Type: Commercial Sheet Vinyl – Wall
  • Installation: Horizontal and Vertical
  • Recommended Number of People for Installation: More than 2
  • Overlap Requirement: Minimum 5cm
  • Tools Needed: Spatula, Utility Knife, Ruler, Hand Roller
  • Cleaning Method: Methylated Spirits and Clean Cloth
  • Post-Installation Wait Time: 48 to 72 hours
  • Protection: Protective Film recommended

PREPARATION

Conditions Required:

  • Store the sheets for at least 25 hours before installation at the construction site.
  • Maintain the room temperature of minimum 15°C prior and throughout the installation.
  • Moisture content of the substrate (wall) should be less than 5%.
  • Store the rolls upright.
  • Before installation, make sure the substrate (Wall) is dry, sound, clean and flat.
  • There should be no exposure to moisture.
  • Cut the wall coverings into required sizes before installation.
  • Do not step on the product with shoes on.
  • Make sure the substrate (wall) is flat and hard and if necessary, restore the flatness of the wall.

DIRECTION OF INSTALLATION

  • Medistep Wall can be installed both horizontally and vertically.
  • Sheets should be installed in reverse direction.
  • Make sure that more than 2 people are involved in installation.

INSTALLATION

  • Cut the sheet into a size 5-10cm larger than the wall size
  • Use an acrylic adhesive emulsion. Follow the adhesive manufacturer’s instructions.
  • Apply the adhesive thoroughly on the wall using a toothed spatula – a spatula with small size tooth is recommended.
  • Make sure to follow open time instructions – open time may vary accordingly to the environment.
  • After the adhesive open time, install the first sheet on the wall.
  • As soon as the wall covering is in position, use a spatula to remove air pocket to the edge of the sheet.
  • When installing the second sheet, make sure to overlap the sheet on the first one by minimum 5cm.
  • With a utility knife and a ruler, cut the overlapping sheets to make the seam tightly fit edge to edge.
  • Remove the adhesive and other residues and roll with a hand roller to flatten the ridges.
  • When applying coving, cut the wall covering to the right size.

POST INTALLATION

  • After installation, inspect the wall to ensure that there is no adhesive residues remaining.
  • Use methylated spirits and a clean cloth if necessary.
  • Wait 48 to 72 hours after installation before carrying out any work on the wall covering.
  • Use a protective film if necessary and avoid sticking any type of adhesive tape directly on to the wall covering.

Frequently Asked Questions (FAQ):

Q: Can the product be installed by a single person?

A: It is recommended to have more than 2 people involved in the installation process for better results.

Q: How long should I wait after installation before working on the wall

covering?

A: Wait 48 to 72 hours after installation before carrying out any additional work on the wall covering.

Q: What should I use to clean adhesive residues post-installation?

A: Use methylated spirits and a clean cloth to remove any adhesive residues.

WEB rhinoflooringrange.com.au

EMAIL sales@rhinoflooringrange.com.au

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

RHINO FLOORING User Manuals

Related Manuals