GLOBAL INDUSTRIAL 27952 4 Tier Wood Locker Instruction Manual

June 17, 2024
GLOBAL INDUSTRIAL

GLOBAL INDUSTRIAL 27952 4 Tier Wood Locker

GLOBAL INDUSTRIAL 27952 4 Tier Wood Locker

Maintenance Tips

*To clean remove or stains, use a piece of flannel dampened with a water and alcohol solution. Avoid direct sunlight.

HARDWARE LIST

The hardware drawings are full-scale, so their dimensions are the same as the actual hardware.
Hardware List

KIT TO AVOID TIPPING (Quantity per module)

Hardware List

NOTE: OPTIONAL BUILT-IN LOCKS AVAILABLE UPON REQUEST IN THE PURCHASE. SEE RELATED ITEMS BELOW.

P| MODEL 01 – KIT BUILT-IN LOCKERS (Lift up hasp locker Kit)

| 04
---|---|---
Q| MODEL 02 – KIT BUILT-IN LOCKERS (Electronic locker Kit)

| 04

Mounting and installation instruction

Mounting cabinets to the wall

  1. Make sure that the area where the cabinets and their bases will be installed is plumb and level.
  2. Check the ventilation spacing between the back of the cabinets and ensure that the side panels have been properly installed. Align the cabinets to secure them to the wall. The side panels must fully touch the wall.
  3. Fold the metal plate and install it on top of the cabinets as shown below.
    Mounting and installation instruction

KIT TO AVOID TIPPING

Mounting and installation instruction

Back-to-back cabinet installation

  1.  Make sure that the area where the cabinets and their bases will be installed is plumb and level.
  2.  Check the ventilation spacing between the back of the cabinets and ensure that the side panels have been properly installed. Align the cabinets to secure them back-to-back. The side panels must fully touch each other.
  3. Install the metal plates on top of the cabinets as shown below.
    Back-to-back cabinet installation

KIT TO AVOID TIPPING

ID Description # Of Pieces Dimension (mm)
01 Left side 01 1828x350x15
02 Right side 01 1828x350x15
03 Shelf 05 274x350x18
04 Back 01 1826x300x6
05 Door 04 444x293x18

Back-to-back cabinet installation

Back-to-back cabinet installation

Side panel installation (add-on sold separately)

  1. Make sure that the area where the cabinets and their bases will be installed is plumb and level.
  2. Position the side panels so that they’re aligned with the front of the cabinet body (not the door) Check-01. The spacing created between the end of the panel and the back of the cabinet is for ventilation Check-02.
  3. After they are positioned, use the hardware that comes with the side panel to join them through the existing holes inside the cabinet wall as shown below

Side panel installation

Corporate assembly

Join cabinets

  1. Start by positioning the cabinets side by side, ensuring they are plumb and level.
  2. After they are positioned, use hardware (H) to join them through the existing holes inside the cabinet wall, as shown below.
    Corporate assembly

Metal base installation (add-on sold separately)

  1. Make sure that area where the cabinets and their bases will be installed is plumb and level.
  2. Position the metal base, aligning and centering it on the body of the previously joined cabinets.
  3. After they are positioned, use the hardware that comes with the metal base component to join the parts on to the metal base to the cabinet base, as shown below.Corporate assembly

Corporate assembly

Corporate assembly

Corporate assembly

Three-dimensional door hinge adjustment: follow the instructions below.

  • Upward and downward height adjustment

  • Sideways adjustment

  • Backward and forward depth adjustment

Corporate assembly

Corporate assembly

OPTIONAL BUILT-IN LOCKS

MODEL 02 – KIT BUILT-IN LOCKERS (Electronic locker Kit)

Corporate assembly

Fastening latch
Note: latch is part of the lock
Install the latch

adjustment  Sideway

security screw Install the

Logo

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

GLOBAL INDUSTRIAL User Manuals

Related Manuals