DYNOJET PC6-17043 Power Commander 6 Installation Guide

June 4, 2024
Dynojet

DYNOJET-PC6-17043-Power-Commander-6-LOGO

DYNOJET PC6-17043 Power Commander 6

DYNOJET-PC6-17043-Power-Commander-6-PRODUCT

PARTS LIST

  1. POWER COMMANDER 6
  2. INSTALLATION GUIDE
  3. USB CABLE
  4. DYNOJET DECALS
  5. POWER COMMANDER DECALS
  6. VELCRO STRIPS
  7. ALCOHOL SWAB

PLEASE READ ALL DIRECTIONS BEFORE STARTING INSTALLATION. THE IGNITION MUST BE TURNED OFF BEFORE INSTALLATION.

INPUT ACCESSORY GUIDE

DYNOJET-PC6-17043-Power-
Commander-6-FIG-1

OPTIONAL ACCESSORY INPUTS

Map
(Input 1 or 2) The PC6 has the ability to hold 2 different base maps. You can switch on the fl y between these two base maps when you hook up a switch to the MAP inputs. You can use any open/close type switch. The polarity of the wires is not important.

Shifter
(Input 1 or 2) Used for clutch-less full-throttle upshifts. Insert the wires from the Dynojet quick shifter into either Input 1 or Input 2. The polarity of the wires is not important. Set to Input 2 by default.

Speed
If your application has a speed sensor then you can tap into the signal side of the sensor and run a wire into this input. This will allow you to calculate gear position in the Control Center Software. Once gear position is setup you can alter your map based on gear position and setup gear-dependent kill times when using a quickshifter.

Analog
This input is for a 0-5v signal such as engine temp, boost, etc. Once this input is established you can alter your fuel curve based on this input in the Power Core software.

Launch
You can connect a wire to either Input 1 or Input 2 and then the other end to a switch. This switch when engaged (continuity) will only allow the RPM to be raised to a certain limit (set in the software). When released, you will have full RPM.

WIRE CONNECTIONS

To input wires into the PC6 fi first remove the rubber plug on the backside of the unit and loosen the screw for the corresponding input. Using a 22-24 gauge wire, strip about 10mm from its end. Push the wire into the hole of the PC6 until it stops and then tightens the screw. Make sure to reinstall the rubber plug.
NOTE: If you tin the wires with solder it will make inserting them easier.

INSTALLING THE POWER COMMANDER 6

DYNOJET-PC6-17043-Power-
Commander-6-FIG-3

  1. Remove the seat.

  2. Remove the fuel tank.

  3. Mount the PC6 to the battery. Use the stock rubber strap to secure the PC6 in place.

  4. Route the harness towards the front of the bike along the left-hand frame tube.

  5. Slide the bracket at the rear of the air box upwards. This allows access to the injectors.

  6. Unplug the stock wiring harness from each of the 4 injectors.

  7. Plug the PC6 wiring harness in line with the stock harness and injectors.
    PC6 harness:DYNOJET-PC6-17043-Power-
Commander-6-FIG-4 ORANGE – cylinder #1 (left)
    YELLOW – cylinder #2
    GREEN – cylinder #3
    BLUE – cylinder #4 (right)

  8. Attach the ground wire from the PC6 to the common stock ground wire location.

  9. Locate the Throttle Position Sensor on the right-hand side of the bike This sensor is behind the coolant hose and is the BLACK connector, NOT the GREY connector.

  10. Unplug the stock wiring harness from the TPS and connect the PC6 in-line with the stock wiring harness and TPS.

  11. Reinstall the fuel tank and bodywork. Optional input:
    Engine T temperature – WHITE/BLUE wire of temp sensor located under cylinder #1 intake manifold on the rear of the cylinder.

  • 2191 MENDENHALL DRIVE,
  • NORTH LAS VEGAS,
  • NV 89081 –800-992-4993
  • DYNOJET.COM © 2015-2022
  • DYNOJET RESEARCH
  • ALL RIGHTS RESERVED

Documents / Resources

| DYNOJET PC6-17043 Power Commander 6 [pdf] Installation Guide
2015-2018 Kawasaki Versys 1000, PC6-17043 Power Commander 6, PC6-17043, Power Commander 6, Commander 6
---|---

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals