RELIABILT 07-2972 Black Steel Mount Mailbox Post Instruction Manual

June 16, 2024
RELIABILT

RELIABILT 07-2972 Black Steel Mount Mailbox Post

Product Information

  • Specifications
    • Brand: RELIABILT
    • Model: GALVANIZED STEEL IN-GROUND MAILBOX POST
    • Trademark: RELIABILT and logo design
    • Trademark owner: LF, LLC
    • Estimated Assembly Time: 20-30 minutes
    • Country of origin: Vietnam
  • Package Contents
    • 1 x Top Post (Poste Superior)
    • 1 x Bottom Post (Poste Inferior)
    • 2 x Mounting Braces (Vilebrequins Soportes)
    • 4 x #8-32 x 5/8 Screws (Tornillos)
    • 4 x #8-32 Hex Nuts (Tuerca hexagonals)
    • 8 x #8 Flat Washer (Arandela)
    • Tools Required (Not Included)
  • Level (Nivel)
    • Phillips Screwdriver (Destornillador Phillips)
    • Wrench (Llave inglesa)

Product Usage Instructions

  • Step 1: Checking Mailbox Size
    • Before installing the mailbox post, check the size of your mailbox. For larger mailboxes, you may need to use the included mounting braces. Please ensure the size compatibility before proceeding with the installation.
  • Step 2: Assembling the Mailbox Post
    • Identify the top post (Poste Superior) and the bottom post (Poste Inferior) from the package contents.
    • Attach the bottom post to the top post using the provided screws and hex nuts. Use a Phillips screwdriver and a wrench to tighten the screws and nuts securely.
    • Attach the mounting braces (Vilebrequins Soportes) to the assembled post using the remaining screws, nuts, and flat washers. Ensure that the braces are firmly attached to provide stability for the mailbox.
  • Step 3: Installing the Mailbox Post
    • Choose a suitable location for installing the mailbox post. Ensure that it is in-ground and stable.
    • Dig a hole in the ground, following the recommended depth and width specified by your local regulations or personal preference.
    • Place the assembled mailbox post into the hole, ensuring it stands straight and upright.
    • Use a level to check the post’s alignment. Adjust as necessary to achieve a level position.
    • Backfill the hole with soil, firmly packing it around the post to provide stability.
    • Double-check the post’s alignment and stability before proceeding.
  • FAQ (Frequently Asked Questions)
    • Q: Where can I find more information about this product?
    • A: For more information about this product, please visit Lowes.com, search for the item number, and refer to the Guides & Documents tab on the product’s page.
    • Q: How long does it take to assemble this mailbox post?
    • A: The estimated assembly time for this product is 20-30 minutes.
    • Q: Are the tools required for assembly included in the package?
    • A: No, the tools required for assembly, including a level, Phillips screwdriver, and wrench, are not included in the package. Please make sure to have these tools available before starting the assembly process.

PREPARATION

  • Before beginning assembly of the product, make sure all parts are present.
  • Compare parts with the package contents list and hardware contents list.
  • If any part is missing or damaged, do not attempt to assemble the product.
  • Estimated Assembly Time: 20-30 minutes.

TOOLS REQUIRED

TOOLS REQUIRED (NOT INCLUDED)/ HERRAMIENTAS NECESARIAS (no se incluyen):

RELIABILT-07-2972-Black-Steel-Mount-Mailbox-Post-FIG-1
\(1\)

PACKAGE CONTENTS

RELIABILT-07-2972-Black-Steel-Mount-Mailbox-Post-FIG-1
\(2\)RELIABILT-07-2972-Black-Steel-
Mount-Mailbox-Post-FIG-1 \(3\)

INSTALLATION OVERVIEW

DO NOT install into the ground until both post pieces are securely connected as noted in Step 1.

  1. Connect the two post sections. Ensure they are aligned properly and fully tightened.
  2. For larger mailboxes, you may need to use included braces. Please check the size before installing.
    • Take 1 mounting brace and line up the holes with the plastic bracket Use the following:
    • 2 # 8-32 x 5/8” screws
    • 2 # 8 small washers
    • 2 small hex nuts to secure the brace
    • Repeat on the other side for the second brace.
  3. Dig a hole 11” deep and 9” in diameter. Fill with one bag mixture of concrete (follow the manufacturer’s instructions for mixing). Install the assembled post into the ground. Pay particular attention to the location, height, and distance. Level and allow to cure following the manufacturer’s instructions before installing the mailbox.

Thank you for purchasing this RELIABILT product. We’ve created these easy-to- follow instructions to ensure you spend your time enjoying the product instead of putting it together. But, if you need more information than what is provided here, please visit Lowes.com, search the item number and refer to the Guides & Documents tab on the product’s page.

  • ITEM #5510923
  • MODEL #07-2972 AS23550

RELIABILT and logo design are trademarks or registered trademarks of LF, LLC. All rights reserved.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

RELIABILT User Manuals

Related Manuals