MCS012 Roof Mounting System

Use
Mounting system for installing framed PV modules with heights between 30 and 50 mm on pitched roofs with the following characteristics:

  • Roof pitch 5° – 60° (solar fasteners), 20°- 60° (Roof hooks)
  • Single and double roman, plain tile, natural slate, and flat tiles with wooden substructures.
  • PV-panel landscape and portrait oriented Static calculation must exist and be considered according to local regulations.

Installation guidelines

Ensure that the roof construction is suitable for the introduction of forces at the fixing points and their subsequent transmission. In order to compensate thermal expansion, included a break every 12 meters when planning the PV- system. For module positioning/fastening points please refer to manufacturers recommendations. Please follow your local timber construction standard. Please do not use installed roof connections as ladder. If installation is located within 10km from the coast, we advice not to use zinc coated material. For further information please contact your sales representative or the technical department at ITT Bulgaria EOOD.
The structural stability of the PV- system must be verified before installation. The building must be able to support the additional weight safely.
Installation notes
Please read these installation instructions carefully before starting the installation and familiarise yourself with the system components. Du ring the installation and in particular whilst working on the roof, ensure to work according to the relevant health and safety guidelines, safety guidelines and please follow the current rules and regulations for your corresponding region. The individual installation instructions are merely recommendations in accordance with the current state of technology and are based on previous experiences of how systems can be installed.
If any special characteristics of the roof or object need to be taken into account, we recommend you to consult specialists such as roofers or structural engineers where necessary. Please check that the applied manual which is up to date. All manuals are available in the download area at https://itt- shop.bg
Testing/certification:

  • TÜV
  •  MCS012 (IK0197)
  •  ISO 9001

Applicable Documents
“General installation, maintenance and assembly instructions”
“Safety Instructions for Installation Instructions”
These documents are available at https://itt-shop.bg/
ITT Bulgaria EOOD is not accountable for the roofs capability to maintain the introduced forces. Please check the roofs compatibility with a static engineer.
TIN ROOF MOUNTING SystemITT MCS012 Roof Mounting System - TIN ROOF
MOUNTING System SOLAR PANELS LAYOUT ITT MCS012 Roof Mounting System - SOLAR PANELS LAYOUT

Installation Steps

Step.1 Remove or slide the tile from the roof girder slightly, and place the roof hook on the wooden rafter (refer to the picture below), Fix the roof hooks using three wooden screws. Grind tile as required and replace. (Recommended Torque:9-11N.M) ITT MCS012 Roof Mounting System - Installation
Steps A ST6.380 Wooden screw
B DIN912 Inner Hexagon Socket BoltsM8
25
C Gb93 Spring Washer M8
D  8.5*18 Dish Gasket
F Aluminium Fixing Nut
INSTALLI NG RAI L
Step. 1 installing SSC rail.

  1. Loosen the treasure blockITT MCS012 Roof Mounting System - treasure block
  2.  Tighten the boltITT MCS012 Roof Mounting System - Tighten the bolt

Installing the rail
Step. 1 There are type for the SSC rail. ( Select Rail Joiner)cITT MCS012
Roof Mounting System - railStep. 2 Repeat the tile roof hook installation in accordance with the planned layout.ITT MCS012 Roof Mounting
System - planned layout

Install Select panel clamps.ITT MCS012 Roof Mounting System - Select
panel

  1. Against the panel, Hold it with your thumbITT MCS012 Roof Mounting System - Against the panel
  2.  Against the panel, Hold it with your thumb

Attention:

  1. The panel clampis close against the solar panel.
  2. Tighten the bolt slowly, until the clamp in holding position.
  3. Then use 12-14N.M torque to tighten the bolt.

ITT MCS012 Roof Mounting System - Against the panel 21*Ensure The Lock Nuts Are Secured to Rail.ITT MCS012 Roof
Mounting System - Solar panel◎Solar panel installation completed. Double check ensure all bolts be tightenITT MCS012 Roof Mounting
System - boltsWe offer various roof hooks to meet different installation requirements. The following are illustrations depicting a variety of different installations.ITT MCS012 Roof Mounting System - meet
different

COMPONENTS

Part name SSC Rail End Clamp Kit
Part No. SLR ACC SLR ACCO2
Figure
Part name Select Rails Joiner Inner Clamp Kit
Part No. SLR ACCO4 SLR ACCO1
Figure
Part name 1# Fixed Hook Standard Earthing Plate
Part No. SLR TILE01 SLR ACC10
Figure

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals