KaiDeng Energy WVC-2400 Micro Inverter User Manual
- June 4, 2024
- KAIDENG ENERGY
Table of Contents
KaiDeng Energy WVC-2400 Micro Inverter
IoT Monitoring Platform
Smart mobile “core” life
- CO-2-induced environmental analysis
- Daily and total energy generation in kWh
- Actual DC input voltage, current, and power
- Actual AC output voltage, current, and power
- Inverter temperature
- Historical (daily, weekly, monthly) power curve
- Power losses due to weather-induced effects
- Optional limitation of power output
- Online switch for the inverter start stop
Communication mode
-
CO-2-induced environmental analysis
-
Daily and total energy generation in kWh
-
Actual DC input voltage, current, and power
-
Actual AC output voltage, current, and power
-
Inverter temperature
-
Optional limitation of power output
-
Online switch for the inverter start stop
-
Historical (daily, weekly, monthly) power curve
Detailed
System diagram
Description of the connector and cable core of the micro-inverter
Wire end connector
Note:
You can purchase a professionally customized AC bus with a T-type
connector. Use this AC bus as the AC bus for each branch. Connect it hand in
hand to form a modular micro-inverter branch wiring system.
LED indicator function of micro-inverter
- Red light keeps on ——-The equipment enters the preparatory working state;
- Red light flashes——- The device enters the delayed start-up stale;
- Blue light flashes quickly —–MPPT maximum power point search status;
- Blue light keeps o,n——–<v1PPT maximum power point locked state;
- Blue light turns to red light for a long time—-a) Island protection; b)Frequency protection; c)Fault; d) Software shutdown;
Normal working indicator flashing process
Connect the micro-inverter correctly to the AC and DC terminals and then power
on:
The red light keeps on for 3 seconds —-> the red light flashes for 30 seconds
—-> the blue light flashes quickly (MPPT maximum power point search) —-> the
blue light keeps on, (MPPT lock).
DOWNLOAD Cloud Intelligence APP
Please use the QR code to scan and install the “Cloud Intelligence” client application, System version: Android 5.0, !OS 9 and above.
Note
Please strictly observe the following installation conditions
- Connect the communication antenna on the inverter;
- Put the inverter in a place with a good Wifi signal;
- The connected Wi-Fi network needs to be in 2.4G mode;
- Please reset the inverter for the first use;
Reset
Long press the reset button, when the LED indicator lights up again and turns into a “blue light” Release the reset button after the status is displayed for a long time, and the inverter will automatically complete the reset.
Add Device
Open the intelligent monitoring software “Cloud Intelligence” APP to log
inAccount, and click the “+” icon in the upper right corner to start adding
equipment program;*lf there is a device under the current account, click on
the device Icon to enter the details page).
Entry equipment
When the smart APP changes to the QR code scanning state, scan the QR code
label on the inverter body. At this time, the APP will automatically collect
the inverter code and automatically jump to the Wi-Fi connection page, enter
Click Next af ter the current Wi-Fi password;
Distribution network
Connect the inverter to the power supply as required, and quickly press the
“Reset” button. At this time, the “LED” indicator will change to flashing blue
and red alternately. At this time, the inverter enters the standby state of
the distribution network;
Initialization
When the inverter is in standby mode, return to the mobile phone APP to
initialize the device operation page, check the “I have completed the above
operations” below, and click the “Start Connection” button. At this time, the
page will jump to the signal search page. The LED indicator on the converter
changes from a red and blue alternately flashing state to a “blue” long-bright
display state when the network distribution is completed. The page will
automatically jump to the system completion confirmation page, please click
“Finish”.
Inverter Control
Click the “Settings” button in the upper right corner of the system details
page. On the settings page, you can adjust the inverter’s output power,
timing, remote start, and stop, etc. according to actual needs.
Remarks
- When multiple inverters need to be added, then the English state, “,” comma separated and ended. Such as: 60001234, 6000E312,
- Each Modem can monitor 60 inverters at the same time;3. A total of 2 lists, each list can be filled with 30 inverter codes;
Features
Smart APP can realize real-time data transmission with the cooperation of Alibaba Cloud loTThrough graphs and graphic displays in time, users can understand the operation of the power station. The user can monitor the operation and adjust the output power function of the system.
INTELLIGENT lot MONITORING MODEM Number of data collectors per Modem Built-in WiFi loT data terminal
Can be used on any smart device (Android/iOS)
- C0-2 induced environmental analysis
- Daily and total energy generation in kWh
- Actual DC input voltage, current, and power
- Actual AC output voltage, current, and power
- Inverter temperature
- Historical (daily, weekly, monthly) power curve
- Power losses due to weather-induced effects
- Optional limitation of power output
- Online switch for the inverter start stop
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>