COMMSCOPE NVX-GRND-CC-NN-C10 NOVUX Fiber Optic System Installation Guide

June 13, 2024
CommScope

CommScope NVX-GRND-CC-NN-C10 NOVUX Fiber Optic System

Product Information

Product Name: NOVUXTM Fiber Optic System NVX-GRND-GRND-NN-C10

Model Number: TC-1471-IP Rev. B

Date of Manual: June 2023

Installation Instructions

This installation kit is applicable for CC 100.

Cable Diameter Range:

  • Round cable
  • mm: 8 – 14
  • inches: 0.32 – 0.55

Kit Contents:

  • Grounding bar – Qty: 1
  • Grounding cable – Qty: 2
  • Screws – Qty: 2

For technical assistance, customer service, or to report any missing/damaged parts, visit us at: http://www.commscope.com/SupportCenter.

Product Usage Instructions

Prepare Feeder Cable:

  1. Verify the length of the strength member(s) as indicated or measure 4 +/-0.5 cm (1.6 +/- 0.2 Inches) and cut to length.

  2. Place the cable on the bracket with the jacket end aligned with the bracket edge as shown in figure 2 and the strength members aligned with the top of the bracket.
    Note: Make sure the sheath opening is positioned against the shape of the bracket.

  3. Route the subunits aside, install the metal plate and bolt withwasher and secure the bolt.

  4. Place the grounding cable between the bracket and the hose clamp.

  5. Secure this assembly with the hose clamp. Make sure the head of the hose clamp is positioned against the bracket.
    Note: Don’t use the self-amalgamating tape.

Install Feeder Cable:

  1. Install the feeder cable (with the strain relief bracket installed) into the organizer.
  2. A loop feeder cable will typically be installed one end left(F2 – feeder out) and one end right (F1 – feeder in).
  3. The bracket snaps in the interface plate of the organizer.

Install Grounding Bar:

  1. Install the grounding bar into the organizer.
  2. The bracket snaps in the holder of the organizer.
  3. Secure the grounding cables of the feeder cables on the grounding bar with the supplied screws.

Remove Feeder Cable:

  1. To remove the feeder cable strain relief bracket, position the fiber guidance pen in the slot at the top left of the support and press to release the lock.
  2. Release the bracket by sliding upwards while maintaining pressure on the lock.
  3. Remove the bracket and the cable.

Remove Grounding Bar:

  1. To remove the grounding bar, position the fiber guidance pen in the slot at the top left of the support and press to release the lock.
  2. Release the grounding bar by sliding upwards while maintaining pressure on the lock.
  3. Remove the grounding bar.

NOVUX™ Fiber Optic System

NVX-GRND-GRND-NN-C10: Grounding kit for CC 100

Applicable for CC 100

Cable diameter range

| mm| inches
---|---|---
Round cable| 8 – 14| 0.32- 0.55

Tools

  • Cable stripping and cleaning tools
  • Phillips screwdriver

Kit contents

Description Qty
1 Grounding bar 1
2 Grounding cable 2
3 Screws 2

Prepare feeder cable

  1. For cable with shielding, remove a section of the outer sheath 180° around the cable over a length of 2,5 cm (1 Inch) measured from the end of the outer sheath in order to expose the cable shielding.

  2. Verify the length of the strength member(s) as indicated or measure 4 +/-0.5 cm (1.6 +/- 0.2 Inches) and cut to length. Place the cable on the bracket with the jacket end aligned with the bracket edge as shown in figure 2 and the strength members aligned with the top of the bracket.
    Note: Make sure the sheath opening is positioned against the T-shape of the bracket.

  3. Route the subunits aside, install the metal plate and bolt with the washer, and secure the bolt.

  4. Place the grounding cable between the bracket and the hose clamp.

  5. Secure this assembly with the hose clamp. Make sure the head of the hose clamp is positioned against the bracket.
    Note: Don’t use the self-amalgamating tape.

Install feeder cable

  1. Install the feeder cable (with the strain relief bracket installed) into the organizer. A loop feeder cable will typically be installed one end left (F2 – feeder out) and one end right (F1 – feeder in).
  2. The bracket snaps in the interface plate of the organizer.

Install grounding bar

  1. Install the grounding bar into the organizer.
  2. The bracket snaps in the holder of the organizer.
  3. Secure the grounding cables of the feeder cables on the grounding bar with the supplied screws

Remove feeder cable

  1. To remove the feeder cable strain relief bracket, position the fiber guidance pen in the slot at the top left of the support and press to release the lock.
  2. Release the bracket by sliding upwards while maintaining pressure on the lock.
  3. Remove the bracket and the cable.

Remove grounding bar

  1. To remove the grounding bar, position the fiber guidance pen in the slot at the top left of the support and press to release the lock.
  2. Release the grounding bar by sliding upwards while maintaining pressure on the lock.
  3. Remove the grounding bar.

© 2023 CommScope, Inc. All Rights Reserved
All trademarks identified by ® are registered trademarks in the US and may be registered in other countries. All third-party product names, trademarks, and registered trademarks are the property of their respective owners. This product may be covered by one or more U.S. patents or their foreign equivalents. For patents, see www.cs-pat.com. This document is not intended to modify or supplement any specifications or warranties relating to CommScope products or services. Visit our website or contact your local CommScope® representative for more information. www.commscope.com. For technical assistance, customer service, or to report any missing/damaged parts, visit us at: http://www.commscope.com/SupportCenter.

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

CommScope User Manuals

Related Manuals