SOLAX POWER X3-EVC Series Commercial Edition Installation Guide
- June 13, 2024
- SOLAX POWER
Table of Contents
Quick Installation Guide
X1/X3-EVC Series 7.2 kW-22 kW
(Commercial Edition)
Packing List
Installation Steps
STEP 1: Remove the screw from the EV-Charger with the cross screwdriver. Then remove the back bracket away carefully.
STEP 2: Fix the back bracket and the cable hook (only for Plug Type) to the wall.
– Mark the position of the holes.
– Drill holes with φ 8 drill.
– Depth: at least 45 mm.| – Insert the expansion bolts.| – Align the bracket
and the cable hook (only for Plug Type)
with the holes, and screw the self tapping screws with the
cross screwdriver.
---|---|---
| |
STEP 3: Hang the EV-Charger on the wall for trial, then estimate the required
length of input cable (three-core for single-phase, five-core for three-phase,
outer diameter: 12.5-18 mm) and communication cable. After that, take the EV-
Charger down.
STEP 4: Unscrew the EV-Charger’s rear cover with the cross screwdriver and
take it down. Then undo the fastening heads and take the waterproof materials
away as shown below.
STEP 5: Unscrew the countersunk screw of the base plate of communication board with the cross screwdriver. Then pull the base plate of communication board out.
STEP 6: Insert the (extended) communication cable of the meter or CT or other
devices through the waterproof connector in sequence as shown below. (For the
installation of CT or meter, please refer to the “CT/Meter Connection”
section.)
STEP 7: Strip the outer sheath of the input cable as below, ensuring all the
wires can reach the terminal blocks with a little excessive length. Use the
stripping pliers to strip approx. 12 mm of insulation from the end of all the
coloured wires as below. Then crimp the European terminal with the wire
crimper.
STEP 8: Insert the input cable through the waterproof connector in sequence as
shown below.
STEP 9: Insert the wires into the appropriate holes of the terminal blocks, then block the terminals with the straight screwdriver.
STEP 10: Press the spring upward and push the base plate of communication board in. Then screw the countersunk screw.
STEP 11: Push the rear cover to appropriate position of the cables and screw the self tapping screws with the cross screwdriver. Then tighten the waterproof fastening heads.
STEP 12: Hang the EV-Charger up carefully and steady the EV-Charger with the self tapping screw and the cross screwdriver.
| For Plug Type, connect the charging connector with the EV-Charger and hang the connecting cable on the hook.
---|---
CT/Meter & WiFi Connection
► CT/Meter Connection
Diagram:
• For “Private Charger” Scenarios | • For “Commercial Charger(OCPP)” Scenarios |
---|---|
Note:
- If a CT is installed with EV-Charger, the arrow on the CT must point at the public grid.
- For the installation of the meter, please refer to the relative quick installation guide for details.
► WiFi Connection
Step 1: Use your smart phone to scan below QR code or search for the keyword
“SolaXCloud” in browser to download the Monitoring App.
|
---|---
https://itunes.apple.com/cn/app/solaxcloud/id1300059673?mt=8|
https://play.google.com/store/apps/details?id=com.solaxcloud.starter
Step 2: Create a new account on the Monitoring App.
Step 3: Login and turn to Account page in the app. Then click “Wifi
Connection” and follow the instructions to complete the process.
*If manual WiFi conguration is required, the IP address is http://192.168.10.10/.
320102036201
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>