SolaX Power 30 kW Phase X3 Ultra 30kW Hybrid Inverter Photovoltaic System Instruction Manual
- June 1, 2024
- SOLAX POWER
Table of Contents
SolaX Power 30 kW Phase X3 Ultra 30kW Hybrid Inverter Photovoltaic System
eManual in the QR code or at http://kb.solaxpower.com/
Safety
General Notice
- Contents may be periodically updated or revised. SolaX reserves the right to make improvements or changes in the product(s) and the program(s) described in this manual without prior notice.
- The installation, maintenance and grid-related setting can only be performed by qualified personnel who:
- Are licensed and/or satisfy state and local jurisdiction regulations;
- Have good knowledge of this manual and other related documents.
- Before installing the device, carefully read, fully understand and strictly follow the detailed instructions of the user manual and other related regulations. SolaX shall not be liable for any consequences caused by the violation of the storage, transportation, installation, and operation regulations specified in this document and the user manual.
- Use insulated tools when installing the device. Individual protective tools must be worn during installation, electrical connection and maintenance.
- Please visit the website www.solaxpower.com of SolaX for more information.
Descriptions of Labels
DANGER!
Lethal danger from electrical shock due to the inverter
- Only operate the inverter when it is technically faultless. Otherwise, electric shock or fire may occur.
- Do not open the enclosure in any case without authorization from SolaX. Unauthorized opening will void the warranty and cause lethal danger or serious injury due to electric shock.
DANGER!
Lethal danger from electrical shock due to the PV
- When exposed to sunlight, high DC voltage will be generated by PV modules. Death or lethal injuries will occur due to electric shock.
- Never touch the positive or negative pole of PV connecting device. Touching both of them at the same time is prohibited as well.
- Do not ground the positive or negative pole of the PV modules.
- Only qualified personnel can perform the wiring of the PV panels.
WARNING!
Risk of personnel injury or inverter damage
- During operation, do not touch any parts other than DC switch, LCD panel.
- Never connect or disconnect the AC and DC connectors when the inverter is running.
- Turn off the AC and DC power and disconnect them from the inverter, wait for 5 minutes to fully discharge the voltage before attempting any maintenance, cleaning or working on any circuits connected.
- Make sure that the input DC voltage ≤ Maximum DC input voltage of the inverter. Overvoltage may cause permanent damage to the inverter, which is NOT covered by the warranty.
CAUTION!
- Keep children away from the inverter.
- Pay attention to the weight of the inverter. Personal injuries may be caused if not handled properly.
NOTICE!
- If an external RCD is required by local regulations, check which type of RCD is required for relevant electric codes. It is recommended to use a Type-A RCD with the value of 300 mA.
- All the product labels and nameplate on the inverter shall be maintained clearly visible.
Packing List
- Refer to the actual delivery for the optional accessories.
- The figures of packing list take 30 kW inverter as an example.
INSTALLATION INSTRUCTION
Installation Site
Installation Carrier
Installation Angle
Installation Space
Installation Tools
Additionally Required Materials
Mechanical Installation
PE Connection
Grid and EPS Connection
PV Connection
Battery Connection
Battery connection with BMS-Parallel Box-II G2 (The BMS-Parallel Box-II G2 can be used with T-BAT-SYS-HV-5.8) (Coming soon)
Battery configuration information
- For T-BAT-SYS-HV-S2.5/3.6, a string of battery module consists of 4-13 packs.
- For T-BAT-SYS-HV-5.8, a string of battery module consists of 2-4 packs.
- For T-BAT-SYS-HV-S2.5, the total capacity connected to the inverter can be from 10 kWh to 65 kWh.
- For T-BAT-SYS-HV-S3.6, the total capacity connected to the inverter can be from 14.4 kWh to 93.6 kWh.
- For T-BAT-SYS-HV-5.8, the total capacity connected to the inverter can be from 11.6 kWh to 46.4 kWh.
Make sure the input voltage of each battery terminal is higher than minimum voltage of 180 V and lower than the maximum input voltage of 800 V.
Communication Connection
COM 1 Communicaiton connection
- Pin Assignment of COM 1 Terminal
Parallel Connection
Maximum number of inverter parallelled
Parallel connection method
- Parallel connection method 1 with SolaX X3-PBOX-150kW-G2
RS485 Communication Connection
- For SolaX products, such as the Adapter Box, EV-Charger, and Datahub they can be connected to pin3 and pin 6 or pin4 and pin5. As for pin1, pin2, pin7, and pin8, they can be utilized to connect devices other than SolaX products. If you require simultaneous connections of multiple devices, a splitter adapter can be employed.
Connecting to Adapter Box
Connecting to EV-Charger
Connecting to Datahub
Cable connection steps
COM 2 Communicaiton connection
- Pin Asignment of COM 2 Terminal
Meter/CT Connection
- Meter/CT pin definition
- Connection to wireless meter
- Please refer to the user manual of relevant meter for connection pin definition.
Meter connection diagram
CT connection diagram
Ripple Control Communication Connection
- Connection diagram for ripple control
DIO Communication Connection
Cable connection steps
Monitoring Connection
Power on the System
OLED Panel / OLED-Bildschirm
- In a normal state, the “Power”, “Today” and “Battery” information will be displayed. You can press the keys to switch information.
- In an error state, the fault message and error code will be displayed, please refer to the corresponding solutions in the user manual.
General Setting
- The initial password is 0 0 0 0 which should be changed for the consideration of account security.
Wi-Fi Configuration
Technical Data
INPUT PV
OUTPUT AC (On-Grid)
INPUT AC
BATTERY
EPS OUTPUT (WITH BATTERY)
EFFICIENCY
POWER CONSUMPTION
PROTECTION
ENVIRONMENT LIMIT
GENERAL
- The specific gross weight is subject to the actual situation of the whole machine.
Contact Information
UNITED KINGDOM
- Unit 10, Eastboro Fields, Hemdale Business
- Park, Nuneaton, CV11 6GL
- +44 (0) 2476 586 998
- service.uk@solaxpower.com
USA
- 3780 Kilroy Airport Way, Suite 200, Long
- Beach, CA, US 90806
- +1 (408) 690 9464
- info@solaxpower.com
POLAND
- WARSAW AL. JANA P. II 27. POST
- +48 662 430 292
- service.pl@solaxpower.com
AUSTRALIA
- 12-18 Lascelles St, Springvale VIC 3171
- +61 1300 476 529
- service@solaxpower.com
Warranty Registration Form
For Customer (Compulsory)
- Name
- Country
- Phone Number
- Address
- State
- Zip Code
- Product Serial Number
- Date of Commissioning
- Installation Company Name
- Installer Name
- Electrician License No.
For Installer
Module ( If Any )
- Module Brand
- Module Size(W)
- Number of String
- Number of Panel Per String
Battery ( If Any )
- Battery Type
- Brand
- Number of Battery Attached
- Date of Delivery
- Signature
Please visit our warranty website: https://www.solaxcloud.com/#/warranty or use your mobile phone to scan the QR code to complete the online warranty registration.
For more detailed warranty terms, please visit SolaX’s official website: www.solaxpower.com to check it.
SolaX Power Network Technology (Zhejiang) Co., Ltd.
Add.: No. 288, Shizhu Road, Tonglu Economic Development Zone, Tonglu City,
Zhejiang Province, 310000 P. R. CHINA Tel.: +86 (0) 571 5626 0011 E-mail:
info@solaxpower.com /
service@solaxpower.com
Copyright © SolaX Power Technology (Zhejiang) Co., Ltd. All rights reserved.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>