SolaX Power X3-Forth 40.0kW-150.0kW Inverter Installation Guide

June 4, 2024
SOLAX POWER

**SolaX Power X3-Forth 40.0kW-150.0kW Inverter Installation Guide

**

Packing List

Packing List Packing
List Packing List

Mounting the inverter on the wall

  1. Use the bracket as a template for marking the position of holes with a level and marker.
    Mounting the inverter on the wall Mounting the inverter on the
wall

  2. Drill the four holes with a φ10 drill.

    • Depth: at least 65 mm.
    • Mounting the inverter on the wall
  3. Hammer the M8x80 expansion screw into four holes.

    • Screw in the nut firmly with socket wrench.
  4. Lift up the inverter.

    • Two methods are available by four installers or lifting ring
      Mounting the inverter on the wall
  5. Hang it onto the bracket
    Mounting the inverter on the wall

  6. Fix it on the wall bracket with M8 bolts
    Mounting the inverter on the wall

Note: Screws used for installation on the wall are not in the accessory bag. Please prepare them in advance.

Mounting the inverter on the stand

  1. Use a bracket as a template for marking the position of the holes with a level and marker.
    Mounting the inverter on the stand

  2. Drill the four holes with a drill

  3. Screw in the M10x40 screw into holes.

    • Tighten it firmly with corresponding socket wrench.
      Mounting the inverter on the stand
  4. Lift up the inverter.

    • Two methods are available by four installers or lifting right
      Mounting the inverter on the stand
  5. Hang it onto the bracket
    Mounting the inverter on the stand

  6. Fix it on the stand with M8 bolts
    Mounting the inverter on the stand

Grounding connection

  1. Strip the 35-70 mm²grounding cable insulation

    • Select OT copper terminal (M8)
      Grounding connection
  2. Pull the heat-shrink tubing over grounding cable
    Grounding connection

  3. Insert the stripped section into OT terminal.

    • And crimp with crimping tool
      Grounding connection
  4. Pull the heat-shrink tubing onto crimped section of OT terminal

    • The tubing must be at below stripped cable section
    • Use hot-air blower to shrink it so that they are in firm contact with
      Grounding connection
  5. Connect the grounding cable to grounding point on the inverter

    • Tighten it with torque 10-12 N.m
      Grounding connection

Grid connection

  1. Select the appropriate OT terminal and 70~240 mm² black, red and yellow and green copper cable

    • use wire stripper to strip the insulation layer of the AC cable end.
    • The stripped insulation layer shall be 2-3mm longer than “D” part of OT terminal as shown below.
      Grid connection
  2. Pull the heat-shrink tubing over AC cable.

    • Insert the stripped section into OT terminal and crimp with crimping tool
      Grid connection
  3. Pull the heat-shrink tubing over the crimped section of OT terminal.

    • Use hot air blower to shrink it so that they are in firm contact with OT terminal.
      Grid connection
  4. Un-install the screws on the cover to open the cover of the wiring box.

    • Use utility knife to cut out the pagoda type protection ring in accordance with the whole cable size,
    • Put the AC cable through the pagoda protection ring, and connect it to the AC terminals L1, L2, L3 and N in turn, and tighten it with torque wrench (with the torque of 25-30 N·m).
    • Re-install the cover of wiring box with the torque of 5~7 N·m.
      Separate PE cable
      Grid connection
      Multi-core cable
      Grid connection  Grid
connection

Communication connection

  1. Select 0.5~0.75 mm² twisted-pair and strip the 20-pin communication insulation

    • Insert the insulated cord end terminal into the cable end
      (ENY0512 nylon terminal for 0.5 mm²/22 AWG conductor;
      ENY7515 nylon terminal for 0.75 mm²/20 AWG conductor)

    • Clamp with terminals press clamp
      Communication connection

  2. Disassemble the communication terminal

    • Set the nut, claw, seal body, seal ring and body on the cable
      Communication connection
  3. Insert the tube type terminal into the housing according to the label

    • Push the terminal-inserted housing into the body; you will hear “Click” , if it is correctly inserted
    • Please check the following table for more details about corresponding Pin definition
      Communication connection
Port Pin Definition Remark
RS-485-1 1 RS485A IN+ Inverter RS485 networking or connect the data

collector
2| RS485B IN
3| Rs485 IN-GND
4| RS485A OUT+
5| RS485B OUT-
6| Rs485 OUT-GND
RS-485-2| 7| RS485A METER| Connect the RS485 meter or other devices
8| RS485B METER
9| V+5V
10| COM_GND
DRM| 11| DRM1/5| Reserved for DRM
12| DRM2/6
13| DRM3/7
14| DRM4/8
15| RG/0
16| CL/0
DI| 21| Digital IN+| Input digital signal
22| Digital IN-
DO| 29| Digital OUT+| Output digital signal
30| Digital OUT-
4. Push the seal body into seal ring, then push the claw Clockwise tighten the nut with torque 8+/-2 N.m

  • Keep the buttons on both sides pressed and then connect it to the communication port on the inverter. You will hear “Click” if it is correctly connected
    Communication connection

Monitoring connection

Solaxcloud is a mobile phone application that can communicate with the inverter via WiFi/LAN/4G. It can realize alarm query, parameter configuration, daily maintenance and other functions. This is a convenient maintenance platform.

Plug Dongle into “USB” port at the bottom of the inverter. After the DC side or AC side is powered on, the APP and inverter can be connected. Please refer to the corresponding manual for details.
Monitoring connection

  • WiFi connection
    Solax Pocket WiFi Dongle connects to a local network within 50 m of the installation to enable access to the SolaX Cloud monitoring platform.
    Monitoring connection

  • LAN connection
    If WiFi isn’t suitable, the Pocket LAN enables users to connect to the network via an ethernet cable. Ethernet allows for a much more stable connection with less interference.
    Monitoring connection

  • 4G connection
    SolaX Pocket 4G dongle allows you to use a 4G connection to monitor your system without the option of connecting to a local network. (This product is not available in the UK)
    Monitoring connection

  • Basic setting
    Basic settings can set the time, date, language and system switch.
    Monitoring connection

  • Advanced setting
    Advanced settings can set the new password of the inverter, buzzer enable, timing switch, etc.
    Monitoring connection

    • Under different standard codes, the parameters that can be set for the inverter are different.
    • If you change the grid standard code, some parameters may revert to factory defaults. After the grid standard code is changed, please check whether the previously set parameters are affected.
    • Sending reset, plant recovery, shutdown or upgrade instructions to the inverter may cause the inverter to be unable to be connected to the grid and affect power generation.
    • The power grid parameters, protection parameters, characteristic parameters and power regulation parameters of the inverter must be set by professionals. power grid Incorrect setting of parameters, protection parameters and characteristic parameters may cause the inverter not connected to the grid and incorrect setting of power adjustment parameters.
    • The error may cause that the inverter cannot be connected to the power grid according to the power grid requirements, thus affecting the power generation.
    • Parameter name, ranges, and defaults may change or adjust in the future.