EverCharge EV002 Charging Station Instruction Manual

June 13, 2024
EverCharge

Ever-Charge-LOGO

EverCharge EV002 Charging Station

Ever-Charge-EV002-Charging-Station-PRODUCT

Product Information

The EverCharge pedestal system is designed for installation either into new concrete or onto an existing concrete surface on an intermediate floor. This manual provides guidelines for both types of installations.

Site Preparation
It is important to check local codes to ensure compliance with installation guidelines. The concrete pad must measure at least 24″ on all sides. Bolt threads must extend 3″ above the concrete, and conduit must extend 12″ to 24″ above the concrete.

Installation Into New Concrete
Tools and materials required:

  • 1/2 – 13 x 9 F1554 Grade 55 hot-dipped galvanized threaded bolts (2)
  • Galvanized Washers (4)
  • 1/2 – 13 Galvanized hex nuts (8)
  • Mounting hole template

Installation instructions:

  1. Prepare the threaded rods by installing two nuts, with a washer in between, at one end of the rod.
  2. Immediately after pouring the concrete, insert the threaded rods 6″ into the concrete, spaced 4.25″ apart, using the mounting bracket as a guide.
  3. Ensure the rods are being rotated as they are inserted to allow concrete to flow into the threads.
  4. When the concrete is fully set, remove the exposed nuts and proceed to the mounting instructions.

Installation into an Existing Concrete Slab
Tools and materials required:

  • 1/2 – 13 x 9 F1554 Grade 55 hot-dipped galvanized threaded bolts (2)
  • Galvanized Washers (2)
  • 1/2 – 13 Galvanized hex nuts (4)
  • Electric or hammer drill
  • Slow Spiral Round-Shank Masonry Drill Bit, 5/8″ diameter, 10″ Drill Depth, 12″ Length Overall
  • Drill Bit for Concrete Embedded Rebar, Round, 5/8″ bit size, 12″ Length Overall
  • Mounting hole template

Note : Always check local codes to ensure compliance with installation guidelines.

Product Usage Instructions

To install the EverCharge pedestal system, follow the appropriate installation instructions based on whether you are installing into new concrete or an existing concrete slab. Make sure to have the necessary tools and materials required for the specific installation type.

Getting Started
The EverCharge pedestal system can be installed either:

  • Into new concrete
  • Onto an existing concrete surface (on an intermediate floor only) The components you need to use, the tools required, and the installation steps vary depending on the type of installation.

This manual provides basic guidelines for both types of installations.

Site Preparation

Warning : Under no circumstances are concrete anchors (wedge, sleeve, etc.) to be used in the installation.

Warning : Failure to comply with these instructions limits our liability

Installation Into New Concrete

Important :

  • Always check local codes to ensure compliance. The guidelines in this manual may need to be adjusted to comply with codes that apply at your installation location.
  • The concrete pad must measure at least 24” on all sides.
  • Bolt threads must extend 3” above the concrete.
  • The conduit must extend 12” to 24” above the concrete.

Tools and Materials Required

  • 1/2” – 13 x 9” F1554 Grade 55 hot-dipped galvanized threaded bolts (2)
  • Galvanized Washers (4)
  • 1/2” – 13 Galvanized hex nuts (8)
  • Mounting hole template

Note : Always check local codes to ensure compliance. The guidelines in this manual may need to be adjusted to comply with codes that apply at your installation location.

Installation Instructions

  1. Prepare the threaded rods by installing two nuts, with a washer in between at one end of the rod. Install two more nuts, with a washer in between them, approximately 6-6 ¼” from the bottom of the other set of nuts (see picture).
    • This is to ensure a minimum of 3” of threaded rod is exposed after installation.
  2. Immediately after pouring the concrete, insert the threaded rods 6” into the concrete, until the bottom of the second set of nuts is against the concrete, at a distance of 4.25” apart, as pictured, using the mounting bracket as a guide to ensure rods are spaced appropriately. Ensure the rods are being rotated as they are inserted to allow concrete to flow into the threadsEver-Charge-EV002-Charging-Station-FIG- \(2\)
  3. When the concrete is fully set, remove the exposed nuts and proceed to the mounting instructions.Ever-Charge-EV002-Charging-Station-FIG- \(3\)

Installation into an Existing Concrete Slab

Tools and Materials Required

Warning : Under no circumstances are concrete anchors (wedge, sleeve, etc.) to be used in the installation.

  • 1/2” – 13 x 9” F1554 Grade 55 hot-dipped galvanized threaded bolts (2)
  • Galvanized Washers (2)
  • 1/2” – 13 Galvanized hex nuts (4)
  • Electric or hammer drill
  • Slow Spiral Round-Shank Masonry Drill Bit, 5/8” diameter, 10” Drill Depth, 12” Length Overall
  • Drill Bit for Concrete Embedded Rebar, Round, 5/8” bit size, 12” Length Overall
  • Mounting hole template

Note : Always check local codes to ensure compliance. The guidelines in this manual may need to be adjusted to comply with codes that apply at your installation location.

Installation Instructions

  1. Install two nuts, with a washer between them, so that a length of at least 6” extends beyond the bottom of the lower nut, and at least 3” above the bottom of the lower nut.
  2. Using the stiffener plate as a template, mark the hole locations to be drilled. The holes should be at a distance of 4.25” apart, center-to-center
    • Note : If a buried conduit exists, place the center of the template over the conduit so that the holes are positioned on either side of the conduit.
  3. Remove the template, and drill two 5/8” holes at least 6” into the concrete. The holes mustn’t penetrate the bottom of the concrete. If the concrete is penetrated, the threaded rod installation may be compromised and inadequate for use.
    • Notes
    • The bolts must be parallel to each other after installation. After drilling approximately 1-1 ½”, use a level to verify the drill holes are plumb by checking the angle of the drill.
    • If drilling through the rebar, you may need an additional drill bit for the rebar. Always begin the hole with the standard concrete drill bit, and switch to the rebar drill bit only when drilling through rebar.
  4. Ensure the hole is free from excess dust and particles after drilling by using a vacuum, compressed air, and/or brush.
  5. Fill each hole with concrete epoxy until 2 ½-3” below to top of the holes.
  6. Begin inserting the threaded rods into the epoxy-filled holes, rotating as the rods are inserted.
    • Note: it is critical that the rods are rotated as they are inserted into the epoxy to ensure air gaps are removed, and threads are fully coated in epoxy.
  7. Fill the holes to grade level with epoxy if necessary. Ensure epoxy is not extending outside of the hole or on the surrounding area, remove if necessary.
  8. Insert the mounting bracket onto the threaded rods and align the rods as necessary. The mounting bracket should slide up and down the rods freely. Be sure to let the epoxy cure according to the manufacturer’s specifications before removing and/or applying torque to the nuts.
  9. Remove the mounting bracket and bolts after the epoxy has cured. Clear the area of any epoxy or other debris, ensuring a clean level surface.

What comes in the box

Ever-Charge-EV002-Charging-Station-FIG- \(4\)

Kit| Description| Single| Dual| #| Item| Quantity/Kit
---|---|---|---|---|---|---
1| Pedestal Assembly| 1| 1| 1| Pedestal Assembly| 1


A

| ****

Mounting Bracket Kit

| ****

1

| ****

1

| A1| Mounting Bracket Assembly| 1
A2| Nut Plate| 2
A3| ⅜-16×1” Flathead Screw| 8



B

| ****


Inlet Conversion Kit

| ****


1

| ****


2

| B1| Bottom Inlet| 1
B2| Top Inlet| 1
B3| M4x12 Delta-PT Screw| 4


C

| ****

Service Hole Cover Kit

| ****

1

| ****

1

| C1| Service Hole Cover| 2
C2| Top Inlet Cover| 2
D| EVSE Mounting Screws| 1| 2| D1| M4x12 Panhead Screw| 4


E

| ****

J1772 Holster Kit

| ****

1

| ****

2

| E1| J1772 Holster Dock| 1
E2| M4x12 Flathead Screw| 4
For Single Pedestal Installations Only
F| Cover plate for Single Pedestal| 1| 0| F1| Cover Plate for Single Pedestal| 1
F2| M4x12 Panhead Screws| 8

Step-by-Step Pedestal Installation Instructions

Tools and Materials Required

  • ¾” Size Hex, Deep Socket (depending on materials used)
  • T20 Torx Drive
  • T40 Torx Drive
  • Torque Wrench
  • Torque Screwdriver

Important: Ensure that the mounting surface is flat and clear of any debris before installation.

  1. Insert the mounting bracket assembly onto the prepared threaded rods.

  2. Place the appropriate sized washers and nuts onto the threaded rod used in installation, tighten the bolts to 45 ft-lbs/58.4N-M (for ½”-13 thread), and verify base plate is level.

  3. Slide the nut plates(A2) inside both sides of the mounting bracket. The nut plate should be inserted with the nuts pointing towards the inside of the mounting bracket and the curved edge pointing down towards the ground.

  4. Insert the pedestal into place by sliding the bottom of the pedestal onto the mounting bracket. The bottom of the pedestal can be identified by having four square-patterned holes on either side.

  5. Secure the pedestal to the mounting bracket by tightening the provided ⅜ -16×1” countersunk screws(A4) into all 8 holes on the bottom of the pedestal. Screws should be tightened using a T40 drive to 20 ft-lbs/26.0 N-m.

  6. Pull the service wiring at this point. For service wire recommendations, please refer to page 10 of the EV002 Installation manual

  7. Using the provided conversion kit, replace the hardware on the EV002 mounting bracket. ( Note: The EV002 mounting bracket is not included in the pedestal box, but can be found attached to the EV002 itself.)
    Remove the attached bottom inlet on the EV002 mounting bracket. Replace it with the curved bottom inlet (B1w) using the previously installed screws, tightening to 38 in-lbs.
    Remove the top inlet on the EV002 mounting bracket. Replace it with the black top inlet (B2) by using the 4 provided M4x12 Delta-PT style screws(B3), tightening to 10 in-lbs. It is critical that the screws from the conversion kit are used, and not the screws previously installed on the mounting bracket.

  8. Pull the service wire through the bottom inlet. (Bottom-fed installations only).

  9. Once the service wire is pulled, cover the large service holes on the pedestal with the large sticker(C1).

  10. Cover the top inlet hole on the EV002 with the small sticker (C2). ( Note: If installing a single pedestal, use the extra sticker to cover the small hole on the back of the pedestal.)

  11. Secure the EV002 mounting bracket to the pedestal using the provided M4x12 Taptite screws(D1), using a T20 drive. Screws must be tightened to 38 in-lbs.

  12. Fasten the J1772 holster dock(E1) to the pedestal using the four M4x12 countersunk screws (E2).

  13. Secure the EV002 to the mounting bracket and connect the service wire.
    Installation instructions and wiring diagram can be located starting on page 11 of the EV002 installation manual.
    ( Optional : The following steps are for pedestals with integrated cable retraction system)

  14. After successfully powering the unit and verifying correct functionality, attach the cable grip to the EV002 output cable. The grip should be placed at the center of the output cable, ~8 feet from the edge of the EV002.

  15. Ensure the cable extends and retracts freely. If the cable does not extend/retract freely, the cord may have come loose from the pulley system. If so, please refer to Appendix A for resetting the pulley system.

Single Pedestal Systems

  1. To complete the single pedestal, the cover plate (F1) must be installed on the back of the pedestal.
  2. Fasten the eight M4x12 screws(F2) using a T20 drive to 38 in-lbs.

Appendix A: Servicing the Pulley System
To service the pulley system, if the output cable does not extend and retract freely:

  1. Remove the screws from the top of the pedestal using a T20 torx drive.
  2. Carefully remove the top cap to expose the pulley system.
  3. If the rope has come off the wheels, simply place the rope back onto the wheel and replace the top cap.

Appendix B: Warranty Information

THIS LIMITED WARRANTY GIVES YOU SPECIFIC LEGAL RIGHTS AND YOU MAY ALSO HAVE OTHER RIGHTS, WHICH VARY FROM STATE TO STATE. THE LIMITED WARRANTY CAN ALSO BE FOUND IN THE DOCUMENTATION WE PROVIDE WITH THE PRODUCT. WE WARRANT THAT DURING THE WARRANTY PERIOD, THE PRODUCT WILL BE FREE FROM DEFECTS IN MATERIALS AND WORKMANSHIP. WE LIMIT THE DURATION AND REMEDIES OF ALL IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION THE WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE TO THE DURATION OF THIS EXPRESS LIMITED WARRANTY. SOME STATES DO NOT ALLOW LIMITATIONS ON HOW LONG AN IMPLIED WARRANTY LASTS, SO THE ABOVE LIMITATION MAY NOT APPLY TO YOU. OUR RESPONSIBILITY FOR DEFECTIVE GOODS IS LIMITED TO REPAIR OR REPLACEMENT AS DESCRIBED BELOW IN THIS WARRANTY STATEMENT.

WHO MAY USE THIS WARRANTY?
EverCharge, Inc. (“we”) extends this limited warranty only to the consumer who originally purchased the product (“you”). It does not extend to any subsequent owner or other transferee of the product.

WHAT DOES THIS WARRANTY COVER?
This limited warranty covers defects in materials and workmanship of the EverCharge pedestal (the “product”) for the

WHAT ARE YOUR REMEDIES UNDER THIS WARRANTY?
Concerning any defective product during the Warranty Period, we will, in our sole discretion, either: (a) repair or replace such product (or the defective part) free of charge or (b) refund the purchase price of such product. We will also pay for shipping and handling fees to return the repaired or replacement product to you if we elect to repair or replace the defective product.

HOW DO YOU OBTAIN WARRANTY SERVICE?
To obtain warranty service, you must call 1 888-342-7383 or email our Customer Service Department at support@evercharge.com during the Warranty Period to obtain a Defective Merchandise Authorization (“DMA”) number. No warranty service will be provided without a DMA number.

LIMITATION OF LIABILITY
THE REMEDIES DESCRIBED ABOVE ARE YOUR SOLE AND EXCLUSIVE REMEDIES AND OUR ENTIRE LIABILITY FOR ANY BREACH OF THIS LIMITED WARRANTY. OUR LIABILITY SHALL UNDER NO CIRCUMSTANCES EXCEED THE ACTUAL AMOUNT PAID BY YOU FOR THE DEFECTIVE PRODUCT, NOR PUNITIVE DAMAGES OR LOSSES WHETHER DIRECT ON NO QUENTIAL, INCIDENTAL, OR SPECIAL SOME STATES DO NOT ALLOW THE EXCLUSION OR LIMITATION OF INCIDENTAL OR CONSEQUENTIAL DAMAGES. SO THE ABOVE LIMITATION OR EXCLUSION MAY NOT APPLY TO YOU.

About This Manual

Product Specifications
All specifications and descriptions contained in this document are verified to be accurate at the time of printing.

Copyrights and Trademarks
All information in this document is subject to copyright and other intellectual property rights of EverCharge and its licensors. This material may not be moditied, reproduced or copied, in whole or in part, without the prior written permission of EverCharge and its licensors. Additional information is available upon request. The following are trademarks or registered trademarks of EverCharge in the United States and other countries:

All other trademarks contained in this document are the property of their respective owners and their use herein does not imply sponsorship or endorsement of their products or services. The unauthorized use of any trademark displayed in this document or on the vehicle is strictly prohibited.

P/N E140-1023
E140-1023-01