TCI V1K130A01 V1K Enclosed Reactor Installation Guide

October 31, 2023
TCI

**TCI V1K130A01 V1K Enclosed Reactor Installation Guide


**

Installation

Installation
Installation
Installation

See V1K Installation Guide For Terminal Wire Size And Torque Information.

Note: Maintain Clearance of 3 Inches On All Sides To Other Equipment.

* = (Blank)* – No Thermal Switch
= T** – Thermal Switch Option

V1K Part Number| Max Voltage| Amps| Phase| Weight (LBS)
---|---|---|---|---
V1K130A01| 600| 130| 3| 83
V1K130A01EX
| 600| 130| 3| 83

Customer Is Responsible For Installation to Meet All National And Local Electrical Codes.

Material(s) Shall be RoHS Compliant