RGC HL4-9k Guide Posts Instructions

June 13, 2024
RGC

RGC-logo

RGC HL4-9k Guide Posts

Product Information: HL4-9k Guide Post

The HL4-9k Guide Post is a product manufactured by REIMANN & GEORGER CORPORATION Marine Products. It is designed to be installed on boat lifts to provide landmarks for positioning the boat correctly on the lift. The guide posts can be installed at the rear of the lift, at the front, or both. They serve to limit the boat’s motion in the event of gentle contact between the boat and guide post. It is important to note that excessive force from a collision between the boat and the guide posts can cause damage to the boat, guide posts, and/or lift. Care should be taken to avoid hard collisions.

Installation

  1. Pre-install captured nuts (4) and set screws (5) in guide post socket (2). Do not tighten down set screws yet.
  2. Install the guide post socket (2) in the bunk, to the rear of the liftarm pin, with hardware (6) and (7).

Parts List

REF # QTY DESCRIPTION P/N
1 2 GUIDE POST WELDMENT 4107089
2 2 GUIDE POST SOCKET WELDMENT 4107092
3 2 HL GUIDE POST PVC TUBE 48 4107708
4 4 NUT SQ 1/2-13 ALUM 5840105
5 4 SCREW SET SOC 1/2-13 X 1-1/2 SS 5894116
6 4 HHCS 1/2-13 X 5 SS 5896294
7 4 NUT HEX NYLOCK 1/2-13 SS 5897018
9 2 CAP DIPMOULD 2-1/4 ID X 1 6403741
10 1 RGC MARINE LOGO COVER 6436485

Installation

Guide posts can be installed at the rear of the lift, at the front, or both. Guide posts provide landmarks to help the pilot position the boat correctly on the lift. Guide posts can limit the boat’s motion in the event of gentle contact between boat and guide post. However, be careful not to allow the boat to collide hard with the guide posts. Excessive force can cause the boat lift to move, and could damage the boat, guide posts, and/or lift.

Attachment to Bunks
At each corner of the lift, the guide post attachment location is the pair of ½” holes REAR of the liftarm pin, as shown on the cover of this manual. Installing the guide posts forward of the liftarm pin will cause the lift to bind during operation, which may damage the lift and guide posts. RGC-HL4
-9k-Guide-Posts- \(1\)

  1. Pre-install captured nuts (4) and set screws (5) in guide post socket (2). Do not tighten down set screws yet.
  2. Install the guide post socket (2) in the bunk, to the rear of the liftarm pin, with hardware (6) and (7).

Guide Posts and Adjustment

  1. Slide the aluminum guide post (1) into the socket.
  2. Install cap (12) on PVC tube (11) and slide foam cover (8) over both. Set tube on the end of each guide post (1).
  3. Slide each guide post inward or outward to the required position.
  4. Drive set screws into guide post to lock it in place.

Width between guide posts, as measured from the inside to inside of foam tube:

  • 52” minimum, with cutting guide post rectangular tube to a shorter length
  • 90” minimum without modification
  • 122” maximum, with HL liftarms set to 34.5” on center
  • 132” maximum, with HL liftarms set to 44.5” on center

Ensure clearance between rear guide posts and lift/canopy legs before operating.

Parts List

Each reference number or letter in the following parts lists can be matched with the reference number or letter referred to in both the text and illustrations.

Hardware Carton

REF # QTY DESCRIPTION P/N
1 2 GUIDE POST WELDMENT 4107089
2 2 GUIDE POST SOCKET WELDMENT 4107092
3 2 HL GUIDE POST PVC TUBE 48″ 4107708
4 4 NUT SQ 1/2-13 ALUM 5840105
5 4 SCREW SET SOC 1/2-13 X 1-1/2 SS 5894116
6 4 HHCS 1/2-13 X 5 SS 5896294
7 4 NUT HEX NYLOCK 1/2-13 SS 5897018
9 2 CAP DIPMOULD 2-1/4 ID X 1″ 6403741
10 1 RGC MARINE LOGO COVER 6436485

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals