Blinds 100 Watt Slide Out Solar Panel Instruction Manual

June 13, 2024
Blinds

Blinds 100 Watt Slide Out Solar Panel

Thank you for purchasing our window treatment. Our shade is custom-sized to your personal specifications with the highest standards of quality and craftsmanship. It is designed to provide you with many years of beauty and easy maintenance.

To install your shade, please follow the easy step-by-step instructions below:

  1. Determine whether you will be installing the shade as an inside mount or outside mount.
    Inside Mount:

    • Center the headrail over the window and ensure it is level.

    • Mark the corners of the headrail.

    • Position the projection brackets 2 inches from the marked corners.
      Outside Mount:

    • Center the headrail over the window and ensure it is level.

    • Mark the corners of the headrail.

    • Position the projection brackets 2 inches from the marked corners.

    • For spliced headrails, follow the instructions below.

  2. If you are using a cornice or decorative molding, you may need to install it first. Please refer to the instructions included with the cornice for guidance.

  3. Mark the locations for the supports or headrail clips. For inside mount, position the headrail clips 2 inches from each end. For outside mount, mark screw locations and space additional brackets/clips evenly.

  4. If you have a cord control blind over 72 inches wide, you will need to mount two brackets/clips next to each other at the control end.

  5. Optional Valance: Mark the locations of the headrail clip on the inside top of the valance according to the headrail depth.

  6. Make sure all valance clips are slid out to the same mark. If you need additional support or have any questions, please feel free to contact our Customer Service Center at 1-800-221-6352 or email us at windowfashions@springswindowfashions.com. We are here to assist you. Thank you again for choosing our product to enhance the design and look of your home.

Thank you for purchasing this fine window treatment proudly constructed by us. Your shade has been custom sized to your personal specifications with the highest standards of quality and craftsmanship.

We have confidence that it will provide you with many years of beauty and easy maintenance. Enjoy!
Follow the easy ‘step by step’ instructions to install your shade. Should you need additional support, please feel free to call our Customer Service Center at 1-800-221-6352 or e-mail us at windowfashions@springswindowfashions.com. We will be glad to help you.
Again, we appreciate that you have chosen us to enhance the design and look of your home.

Everything needed to install your shade

  1. Headrail with wand control
  2. Panels (2-8)
  3. Headrail clips/mounting screws
  4. Projection brackets/machine screws and nuts (outside mount only)
  5. Optional
  6. Valance
  7. Valance returns
  8. Valance corners
  9. Valance splice plate (for valances over 192″ wide)
  10. Headrail joiner plate (for spliced

Tools needed

If a cornice is used it may need to be installed first.

Mark bracket locations

Outside Mount: Center headrail over window, ensure level, mark corners. For spliced headrails, see below. Position projection brackets 2″ in from marks made. Inside Mount: Position headrail clips 2″ in from each end. Optional Valance: Mark headrail clip locations on inside top of valance according to headrail depth, as shown below.
Mark screw locations. Space additional brackets/clips evenly. Cord control blinds over 72″ wide require two brackets/clips mounted next to each other at control end.

Make sure all valance clips are slid out to the same mark.

If headrail using joiner plate

Loosen joiner plate screws. Insert and center plate between headrail sections. Tighten screws.

Drill holes at marks made

Use wall anchors if necessary.

Optional valance

Outside mount use 3/16″ drill bit

Optional: Assemble valance

If necessary, join valance sections using a splice. If it is not already installed, slide valance fabric insert into the PVC valance face and secure with tape. Insert valance face and returns into the valance corners. Trim returns to length with scissors.

Install brackets and headrail clips

Outside mount

Inside mount

Mount headrail

Install panels

Traverse blind open. Starting with rear slide, remove screw on the face of slide, then remove endcap. Determine panel front, insert the panel into slide. Insert endcap and screw; tighten screw. Repeat for each panel, in order.

Snap valance into valance clips

Snap valance into valance clips.

Operating the blind

Cleaning and care

Lightly vacuum panels with a soft brush attachment or wipe with a duster.
Do not use water or liquid cleaning solutions.

Additional instructions
  • Cord draw track is hard to traverse. Moving slides manually may have caused the cord to slip out of its channel. Carefully moving the slides while keeping tension on the cords will correct
  • Panel cannot be inserted into the slide. Some thick or coarse fabrics may catch on the slide opening. Check slide for burrs and remove. Make sure all staples are flat and not sticking out to catch on the slide. Flatten staples as needed.
  • Track will not snap into mounting brackets. Brackets must be mounted in a straight line and at the same height. Make sure there is no damage to headrail or brackets and that the screw heads are not interfering.
  • Panels do not all follow as track is traversed. Slides need to be repositioned so the hooks catch. Traversing the track will normally re-engage the slides. If not, the slides may have to be tilted to allow the hooks to move into place.
Finished looks

How to Install
Sliding panel track with solar/roller/Roman shade panels inside/ceiling or outside mount

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Blinds User Manuals

Related Manuals