Lowe s GZB170DG Gray Metal Freestanding Pergola with Canopy Instruction Manual
- June 13, 2024
- Lowe s
Table of Contents
Lowe s GZB170DG Gray Metal Freestanding Pergola with Canopy
Product Information
Product dimensions: L=90x90x1760mm – Pre-assembly requirements: Two or more people, stepladders, protective gloves, safety hat, Phillips screwdriver, drill, safety goggles – Warning & Attention: Assemble on flat ground, easier with three or more people, check screws after assembly
Product Usage Instructions
-
Step 1:
Connect part A1 and part A, part A2 and part A on the side of the wall using screws 1# and part B1. Then connect part A2 and part A, A1 and part A on the other side using screws 1# and part B. -
Step 2:
Use screws 1# to connect part C and C1, and also connect part C2 and C3 together. At the same time, connect five sliders (part S2) on each side. -
Step 3:
Link part D and part D1, part D and part D2 using screws 1#. Also, link part E and part E1, part E and part E2 using screws 1#. -
Step 4:
Link part F and F1, part G and G1 using screws 1#. Connect the sliders (part S1 and part S). Hang part R on the outside slider of part G1. -
Step 5:
Connect part D2 with A1, D1 with A2 using screws 2#. Also, connect part E1 with A2, E2 with A1 using screws 2#. -
Step 6:
Connect part C2 with A1, C3 with A2 using screws 2#. Also, connect part C with A2, C1 with A1 using screws 2#. -
Step 7:
Use screws 5# to connect part F with beams (part D1&D2), and also connect part F1 with beams (part E1&E2). Connect part G and G1 with beams (part D&E) in the same way. -
Step 8:
Insert part J&J1 into the pocket of top roof (part M), then insert part H&H1 into the pocket of top roof in turn. -
Step 9:
Insert part L&K, L1&K1 into the part M1 using part N. -
Step 10:
Secure part M1 to the top. Step 11: Connect part J and part D1.
Pre-assembly
Warning & Attention
- Try to assemble this product on the flat ground, otherwise it is difficult to carry out;
- It would be much easier to assemble the product with three or more people;
- After assembly, please check whether all screws are tightened, to prevent parts from falling apart.
PAERTS LIST
INSTALLATION INSTRUCTION
- Step 1: Connect part A1 and part A, part A2 and part A on the side of the wall using screws 1# and part B1 as shown in diagram.
Then connect part A2 and part A, A1 and part A on the other side using screws
1# and part B.
- As shown in the figure, use screws 1# to connect part C and C1, and also connect part C2 and C3 together. At the same time, connect five sliders (part S2) on each side.
- Step 3: Link part D and part D1, part D and part D2 using screws 1# as shown in diagram1# as shown in diagram. And link part E and part E1, part E and part E2 using screws 1# as shown in diagram.
- Step 4: Link part F and F1, part G and G1 using screws 1# as shown in diagram. And connect the sliders(part S1 and part S). Then hang part R on the outside slider of part G1.
-
Step 5: Connect part D2 with A1, D1 with A2 using screws 2# as shown in diagram. Also, connect part E1 with A2, E2 with A1 using screws 2# as shown in diagram.
-
Step 6:Connect part C2 with A1, C3 with A2 using screws 2# as shown in diagram. Also, connect part C with A2, C1 with A1 using screws 2# as shown in diagram.
-
Step 7:
As shown in the figure, use screws 5# to connect part F with beams (part D1&D2), and also connect part F1 with beams (part E1&E2).
Then connect part G and G1 with beams (part D&E) in the same way. -
Step 8: Insert part J&J1 into the pocket of top roof (part M) as shown in diagram, then insert part H&H1 into the pocket of top roof in turn.
-
Step 9: Insert part L&K, L1&K1 into the part M1 using part N.
- Step 10: Secure the part M1 to the top.
- Step 11:Connect part J and part D1 and connect part H and part H1.
- Step 12 : When the canopy is folded, hang the other end of string (part R) into the hole on the inside of beam (part E) to secure the top roof.
- Step 13: Insert stakes (part P) through the hole of stand plate (part B) into the ground, to stabilize the tent.