FULBAT Fulbank 2000 Battery Bank Charger Instructions
- June 12, 2024
- FULBAT
Table of Contents
FULBAT Fulbank 2000 Battery Bank Charger
BOX CONTENT
- 2x black mounting bars.
- 4x alluminium mounting clips.
- 4x screws including spacers Ø 8mm.
- 4x nuts Ø 8mm.
- 8x screws including spacers Ø 6mm.
- 8x nuts Ø 6mm.
FOLDING & PREPARING ALUMINIUM MOUNTING CLIPS
Prepare the aluminium mounting clips for installation on the display.
Please fold as indicated in each step.
ALUMINIUM MOUNTING CLIP INSTALLATION
Install the aluminium mounting clips around the display plastic tubes.
The black mounting bar should be positioned as in the example.
Repeat the same installation for the 2nd black mounting bar.
FULBANK 2000 INSTALLATION
After installing the black mounting bars, you can install both Fulbank 2000.
To install both Fulbank 2000, you will need:
- 8x screws Ø 6mm.
- 8x spacers Ø 6mm.
- 8x nuts Ø 6mm.
FINAL RESULT
The Fulbat display is ready.
You can start to charge your Lead-Acid and Lithium (LiFeP04) batteries.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>