lykke 108 PC Greenhouse Instruction Manual

June 12, 2024
lykke

lykke 108 PC Greenhouse Instruction Manual
Greenhouse

Dear Customer!

The assembly of your new greenhouse requires no technical knowledge. However, it is important that the assembly instructions are strictly followed. The assembly instruction is a combination of text and illustrations. The profiles are packed seperatly in numbered packs corresponding to the order in the assembly instruction. Erect one pack at a time. All nuts and bolts and fi ttings are found in the bag. Each pack is specified in separate lists of components

All detailed illustrations are marked with symbols:

seen from inside
seen from outside

Precautions

  • Assembly must only be carried out in dry and calm weather.
  • Always use working gloves while glazing. Greenhouse glass has sharp edges, especially if the glass breaks.
  • Assistants and especially children must be warned that broken glass is an element of danger. Pick up broken glass at once and remove it with care.
  • We recommend to use protective glasses while fi xing the spring wire clips.
  • Place the ladder on a level support.
  • It is essential to have an assistant.

Foundation
The base is not included in this delivery. However, an optional base can be bought separately. It ensures you have a stable and easy to build base. If you make your own base the measurements indicated must be external measurements. If you buy an optional base you furthermore need about 75 litres of concrete and 6 plastic-/concrete pipes of about 800 mm which are placed in a nonfreezing depth for the fastening of the corner and middle anchors. The base must be 100% level and square; the latter is ensured by checking that the two diagonal measurements are equal.

Tools
The mounting of the greenhouse requires the tools shown on page 1.

Place the components as shown on the illustration and assemble in the order shown in the pictures. Do not tighten the nuts completely until the front gable construction has been assembled.

Fastening to the base
When constructing your own base you have to drill holes (7 mm) in the ground frame between all the vertical frames, the greenhouse is then fastened to the base with screws (A).
Using an optional base the greenhouse is fastened to each vertical bar as shown on drawing B.

Fitting of glass/polycarbonate Important before glazing!
Make sure that gables and sides are level and square, and that door(s) and window(s) are functioning perfectly

Best order of assembly:

  1. Rear gable –
  2. Front gable –
  3. Sides –
  4. Frame assembly –
  5. Roof and bracing –
  6. Doors –
  7. Vents –
  8. Glazing

Glazing
Degrease the sheets and frames with spirit. Start glazing from below, one glass at a time. Fit glazing strip 1054) to all glazing bars, gable bars and corner posts before you begin to glaze the greenhouse.
Spring wire clips and glassholders are to be fi tted as shown.
X = Spring wire clips, H = H-Strip

Now your greenhouse is completely assembled. However, please notice the following:

Maintenance

  • Grease doors (hinges and lock or doortrack).
  • Clean the gutter for leaves, etc.
  • Adjustment of windows.
  • Replacement of broken glass.
  • Clean the greenhouse with disinfectant before and after the growing season.

Winter Protection
In areas with occurrence of snow we recommend the following winter protection:

  • Support the roof ridge at the centre of the greenhouse
  • Remove greater snow loads from the roof.
  • Take precautions against snow falling down from for instance a tree or a roof.
  • Dismount the cylinders for the automatic window openers, if any (optional extras).
  • Secure door(s) and window(s) preventing wind damage to the greenhouse

Accessories

Installation

| X| Y| Z
---|---|---|---
88| 2539mm 8ft 3’’| 2539 mm8 ft3’’| 3590mm11ft 8’’
108| 2539mm 8ft 3’’| 3160 mm 10ft 4’’| 4054mm 13ft 3’’
128| 2539mm 8ft 3’’| 3781 mm 12ft4’’| 4554 mm 15ft0’’
148| 2539mm 8ft 3’’| 4402mm 14 ft5’’| 5082 mm16 ft7’’
168| 2539mm 8ft 3’’| 5023 mm16 ft5’’| 5628 mm18 ft5’’
| #| 88| 108| 128| 148| 168
---|---|---|---|---|---|---
| | 2| 2| 2| 2| 2
| | 2| 2| 4| 4| 4
| | 4| 4| 4| 4| 4
| | | | 2| 2| 2
| | 4| 4| 4| 4| 4
| M6 × 12 M6| 16| 16| 24| 24| 24
| | 18| 18| 20| 20| 20

Preparation

Installation

Rear gable
Installation Installation

1| #|
---|---|---
1| 2019| 1
2| 1023| 2
3| 3002| 1
4| 3003| 1
5| 2020A| 1
6| 2021| 1
7| 1012A| 2
8| 2066| 1
9| 2024| 1
2025| 1
10| 2068| 1
11| M6 × 12 M6| 27
12| 2067| 1
13| 1028| 2

Front gable
Installation Installation

2| #|
---|---|---
1| 2001| 1
2| 1023| 2
3| 3002| 1
3003| 1
2021| 1
4| 1012A| 2
5| 2014| 2
6| 2026| 1
2027| 1
7| 2029| 1
8| 1062| 2
9| M6 × 40 M6| 2
10| M6 × 12 M6| 29
11| 2067| 1
12| 1028| 2

Sides
Installation Installation

3 # 88 108 128 148 168
1 1004 2
1005 2
1006 2
2005 2
2006 2
2 2007 2
2008 2
2009 2
2010 2
2011 2
3 1015 6 8 10 12 14
4 1012A 4 4 4 4 4
5 M6 × 12 M6 18 24 30 36 42

Roof
Installation Installation

4 # 88 108 128 148 168
1 2033 1
2034 1
2035 1
2036 1
2037 1
2 2015 6 8 10 12 14
3 2013 4 4 4 4 4
4 2072 3 4 5 6 7
5 1030 6 8 10 12 14
6 M6 x 12 M6 78 88 98 108 118
7 2069 12 12 12 12 12
8 1041 8 8 8 8 8
9 1042 4 4 4 4 4

D4oor
Installation Installation

5 # MALLI88/108/128/148/168
1 1039 2
2 1044 2
3 1038 4
4 1043 2
5 1032 2
6 2070A 1
7 2071A 1
8 2022 1
9 2031 2
10 1046 2
11 2073 1
12 2074 1
13 1040 2
14 1056 4
15 1064 4
16 1053 4
17 1065 32
18 1055 4
19 6 x 12M6 4

Windows
Installation Installation

6 # 88 108 128 148 168
1 1047 8 8 8 8 8
2 1048 4 4 4 4 4
3 1049 4 4 4 4 4
4 1050 4 4 4 4 4
5 1052 8 8 8 8 8
6 1061 4 4 4 4 4
7 M6 x12 M6 24 24 24 24 24
8 3.5×6 24 24 24 24 24
9

Glass
Installation Installation

7 # mm 88 108 128 148 168
1 A 615×1213 14 16 18 20 22
2 B 615×1520 4 6 8 10 12
3 C 615×610 4 4 4 4 4
4 D 602×550 4 4 4 4 4
5 D1 615×985 4 4 4 4 4
6 E 615×229 2 2 2 2 2
7 F 615×443/12 4 4 4 4 4
8 G 615×450/20 4 4 4 4 4
9 I 615x 436 2 2 2 2 2
10 H H – Strip600mm 6 6 6 6 6
11 1057 330 350 **** 370 390 410
12 1054 74 85 96 107 118

4mm-Polycarbonate
Installation

8 # mm 88 108 128 148 168
1 A **** 615×1212 **** 8 **** 10 **** 12 **** 14 **** 16
2 B **** 615×1520 4 **** 6 **** 8 **** 10 12
3 C 615x 608 4 4 4 4 4
4 D 602×550 4 4 4 4 4
5 D1 **** 615×983 4 4 4 4 4
6 E 615×229 2 2 2 2 2
7 F 618×443/10 4 4 4 4 4
8 G 615×1655/1234 4 4 4 4 4
9 I **** 615x 1655 **** 2 **** 2 **** 2 **** 2 **** 2
8 # mm 88 108 128 148 168
--- --- --- --- --- --- --- ---
1 X 330 350 370 390 410
2 1054 74m 85m 96m 107m 118m
3 1066 600 16 16 16 16 16
4 1068 580 8 10 12 14 16
5 1069 580 24 28 32 36 40
1071 530 4 4 4 4 4
**6** 1067 600 8 8 8 8 8
1070 1650 8 8 8 8 8
1072 1210 20 24 28 32 36
1073 1500 8 12 16 20 24
1074 730 8 8 8 8 8
1075 440 4 4 4 4 4
1076 225 2 2 2 2 2
1077 980 8 8 8 8 8

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

lykke User Manuals

Related Manuals