EPIC OFFICE Qzone Phonebooth Instruction Manual
- June 12, 2024
- EPIC OFFICE
Table of Contents
EPIC OFFICE Qzone Phonebooth Instruction Manual
PACKAGE CONTENT
PARTS DESCRIPTION
A: Ceiling Panel
A1: Top Panel
A2: AKU Panel
B: Front Panel
B1: Glass Door
D: Back Panel
E: Shelf
G: Bottom Panel
X: Side Panel
X1: AKU Side Panel
Z: Side Panel
Z1: AKU Side Panel
Assembly Instructions
STEP 1: Bolt the side panel X to the back panel D using M6 x 50 screws.
STEP 2: Bolt the side panel Z to the back panel D using M6 x 50 screw
STEP 3: Bolt the bottom panel G to the back panel D using M6 x 50 screws
STEP 4: Bolt ceiling panel A to the back panel D using M6 x 50 screws.
STEP 5: Bolt the front panel B to panels Z, X, G and A using M6 x 50 screws.
STEP 6: Install the fan on the panel A1 with washers and 4 x 45 self- tapping screws.
STEP 7: Make the electric connections according to instructions then bolt the top panel A1.
STEP 8: Bolt PET panels X1 and Z1 using M6 x 20 screws
STEP 9: Bolt the top panel A1 using self-tapping screws.
STEP 10: Bolt the shelf E to the panels front B and back D using M6 x 45 screws.
STEP 11: Bolt the hinges, handle and door lock to the glass door. The threaded tube on the door latch allows adjustment for a tigther closing. Might requiere a few trials to find the perfect position.
STEP 12: Mount glass door B1 to the frame using supplied hardware.
STEP 13: Adjust the thread on the door lock to get the desired closing.
STEP 14: Once the desired locking setup is achieved, remove the latch from the door. Mark the correct position of the threaded tube and unscrew. Apply LOCTITE or similar product on the thread so it doesn’t loosen over time. Adjust the threaded tube back to the original position.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>