UNIRAC 004085M FlashLoc Comp Kit Mill User Guide
- June 12, 2024
- UNIRAC
Table of Contents
UNIRAC 004085M FlashLoc Comp Kit Mill
INTRODUCTION
FLASH LOC is the ultimate attachment for composition shingle and rolled comp roofs. The all-in-one mount installs fast — no kneeling on hot roofs to install flashing, no prying or cutting shingles, no pulling nails. Simply drive the lag bolt and inject sealant into the base. FLASH LOC’s patented TRIPLE SEAL technology preserves the roof and protects the penetration with a permanent pressure seal. Kitted with lag bolts, sealant, and hardware for maximum convenience. Don’t just divert water, **LOC it out!
**
TESTED TO TAS-100 WIND DRIVEN RAIN TEST AND UL441 RAIN TEST
2023JAN16_FLASHLOCCOMP_V2
INSTALLATION INSTRUCTIONS
PROTECT THE ROOF
Install a high-strength waterproof attachment without lifting, prying or damaging shingles.
LOC OUT WATER
With an outer shield 1
contour-conforming gasket 2
and pressurized sealant
chamber 3
the Triple Seal technology delivers a 100% waterproof connection.
HIGH-SPEED INSTALL
Simply drive lag bolt and inject sealant into the port 4
to create a
permanent pressure seal.
PRE-INSTALL
Snap chalk lines for attachment rows. On shingle roofs, snap lines 1-3/4” below upslope edge of shingle course. Locate rafters and mark attachment locations.
At each location, drill a 7/32” pilot hole. Clean roof surface of dirt, debris, snow, and ice. Next, BACKFILL ALL PILOT HOLES WITH SEALANT.
NOTE: Space mounts per racking system install specifications.
STEP 1: SECURE
Place FLASHLOC over pilot hole with lag on down-slope side. Align indicator marks on sides of mount with chalk line. Pass included lag bolt and sealing washer through FLASHLOC into pilot hole. Drive lag bolt until mount is held firmly in place.
NOTE: The EPDM in the sealing washer will expand beyond the edge of the metal washer when proper torque is applied.
STEP 2: SEAL
Insert tip of UNIRAC provided sealant into port. Inject until sealant exits both vents. Follow sealant manufacturer’s instructions. Follow sealant manufacturer’s cold weather application guidelines, if applicable.
Continue array installation, attaching rails to mounts with provided T-bolts.
NOTE: When FLASHLOC is installed over gap between shingle tabs or vertical joints, fill gap/joint with sealant between mount and upslope edge of shingle course.
USE ONLY UNIRAC APPROVED SEALANTS: Chemlink Duralink 50, Chemlink M-1, or Geocel 4500
CUSTOMER SUPPORT
FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL 505-248-2702
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>