D-Link DIS-100G-5SW Industrial Unmanaged Switch Installation Guide
- June 12, 2024
- D-Link
Table of Contents
Industrial Unmanaged Switch with 4 10/100/1000
Base-T Ports and 1 1000Base-X SFP Port
D-Link
DIS-100G-5SW
Quick Installation Guide
DIS-100G-5SW Industrial Unmanaged Switch
Information in this document is subject to change without notice. © 2018 D-Link Corporation. All rights reserved.
Package Contents
Open the shipping carton of the switch and carefully unpack its contents. The carton should contain the following items:
- DIS-100G-5SW switch
- DC power terminal block
- Wall mounting kit
- DIN-Rail mounting kit
- Quick Installation Guide
Hardware Overview
Interfaces
Interface | Description |
---|---|
Ports 1-4 | 1000Base-T ports |
Port 5 | 1000Base-X SFP port |
Table 1
LED Indicators
LED | Status | Description |
---|---|---|
ALM | On red | Power failure alarm occurs. |
Off | No power failure alarm. | |
P1 | On green | P1 power line has power. |
Off | P1 power line is disconnected or does not have power supply. | |
P2 | On green | P2 power line has power. |
Off | P2 power line is disconnected or does not have power supply. | |
Link/Act (Ports 1-4) | On green | Ethernet link is up. |
Blinking green | Ethernet link is up and there is traffic detected. | |
Off | Ethernet link is down. | |
Speed (Ports 1-4) | On yellow | 1000 MPs connection is detected. |
Off | No link or 10/100 MPs connection is detected. | |
Link/Act (Port 5) | On green | Ethernet link is up. |
Off | Ethernet link is down. | |
1000 (Port 5) | On yellow | SFP port 1000 MPs connection is detected. |
Off | No link or SFP port 100 MPs connection is detected. |
Table 2
Pin № | State | Description |
---|---|---|
Pin 1 | ON | To enable the power alarm. |
OFF | To disable the power alarm. | |
--- | --- | --- |
Pin 2 | ON | To enable broadcast storm rate limit. |
OFF | To disable broadcast storm rate limit. | |
Pin 3-6 | ON | Not used. |
OFF | Not used. |
Hardware Installation
DIN-Rail Mounting
Mounting steps:
- Screw the DIN-Rail bracket on with the bracket and screws in the accessory kit.
- Hook the unit over the DIN-Rail.
- Push the bottom of the unit towards the DIN-Rail until it snaps into place.
Wall Mounting
Screw on the wall-mount plate on with the plate and M4 screws in the accessory
kit.
Grounding the Switch
Use the following instructions to ground the switch. Please complete these
steps before powering on the switch.
- Remove the grounding screw from the switch and place the grounding cable lug ring on top of the grounding screw opening.
- Insert the grounding screw back into the grounding screw opening and use a screwdriver to tighten the grounding screw, securing the grounding cable to the switch.
- Attach the terminal lug ring at the other end of the grounding cable to an appropriate grounding source.
- Verify that the connection between the grounding connector on the switch and the grounding source is secure.
Connecting to a Power Source
The switch can be powered by two power supplies (input range 12 to 58 V DC). Insert the positive and negative wires (AWG 14-26) into V+ and V- contact on the terminal block and tighten the wire-clamp screws to prevent the wires from being loosened.
Alarm Relay Connecting
The alarm relay output contacts are in the middle of the DC terminal block connector shown as the figure below. By inserting the wires and set the DIP switch of the respective Port Alarm to “ON”, the relay output alarm will detect any port failures, and form a short circuit. The alarm relay out is “Normal Open”.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>