LEDVANCE T8 EM LED Tube Luminaires Instructions
- June 12, 2024
- LEDVANCE
Table of Contents
June 2023
REWIRING INSTRUCTION
For 1-lamp
luminaires to AC mains direct wiring for
operation with LEDVANCE LED TUBE T8 EM,
UNIVERSAL or LEDVANCE LED TUBE T5 AC
Rewiring of 1-lamp Luminaires
Rewiring must be executed by a qualified electrician.
Luminaire to be rewired with built in reflector (above), with removed
reflector (below)
Tools needed: wire cutter, wire stripper, different screwdrivers New
wires must comply with latest version of EN 50525 and EN 60598-1, have a
minimum cross section of 0,4 mm2 and the isolation have a nominal thickness of
0,5 mm.
Material included in conversion kit
Content conversion kit:
- 4 WAGO connectors
- 4 adhesive sockets for cable ties
- 4 cable ties
- New blank name plate for luminaire (to be fixed clearly visible and permanently on the luminaire)
- Pre-wired microfuse (T2A 250V)
General Work Steps ECG Luminaire
Direct wiring circuit diagram of a 1-lamp luminaire on AC mains
Remove wiring from ECG step by step and re-connect as prescribed below
Step 1: Connect mains line “L” to fuse with one wire using a WAGO connector
Step 2: Connect second fuse line to right lamp holder. Pay attention to
correct connection of all ECG clamps within the following steps.
Step 3: Connect right lamp holder to left lamp holder.
Step 4: Connect second line from left lamp holder to neutral wire “N”. Use
WAGO connector if needed. Step 5: Remove ECG.
Step 6: Fix all wires with adhesive sockets and cable ties. Step 7: After CE
conformity test, fill in and fix new name plate clearly visible and
permanently on luminaire while removing or pasting over old name
plate.Step 8: Conduct final visual inspection of all components and
check if all wires have been fixed tightly inside of the WAGO connectors.
Cables should not be pinched during the mounting of the luminaire. Defect
parts must be repaired or replaced. If needed, re-connect earth conductor (PE)
Wiring examples with typical ECG
Remove wiring from ECG step by step and re-connect as prescribed belowStep 1: Connect mains line “L” to fuse with one wire
1. Siemens ECG
Step 2: Connect second fuse line to line „1“
Step 3: Connect line „2“ to line „3“
Step 4: Connect line „4“ to line „N“
Further steps according to general work steps.
2. OSRAM ECG
Step 2: Connect seccond fuse line to line „21“
Step 3: Connect line “22” to line “23”
Step 4: Connect line “24” to line “N”
Further steps according to general work steps.
3. Philips ECG
Step 2: Connect second fuse line to line „1“
Step 3: Connect line „2“ to line „3“
Step 4: Connect line „4“ to line „N“
Further steps according to general work steps.
4. Zumtobel/Tridonic ECG
Schritt 2: Connect second fuse line to line „16“
Schritt 3: Connect line „15“ to line „14“
Schritt 4: Connect line „13“ to line „N“
Further steps according to general work steps.
5. BAG ECG
Step 2: Connect second fuse line to line „1“
Step 3: Connect line „2“ to line „3“
Step 4: Connect line „4“ to line „N“
Further steps according to general work steps.
General Work Steps CCG Luminaire
Circuit diagram of a luminaire with traditional CCG, fluorescent lamp and starter
Remove wiring from CCG step by step and connect as described, if applicable remove compensation capacitor as well
Circuit diagram of a rewired, single-flame luminaire with LED tube on AC
mains Step 1:
Connect mains line “L” to fuse with one wire using a WAGO connector.
Step 2: Connect second line of fuse with the left lamp holder.
Step 3: Remove starter holder to establish a connection between the right and
left lamp holder
Step 4: Connect cables leading to starter holder using a WAGO connector.
Step 5: Remove CCG.
Step 6: Fix cables using existing cable brackets and mount additional cable
ties and adhesive sockets.
ABOUT LEDVANCE
With offices in more than 50 countries and business activities in more than
140 countries, LEDVANCE is one of the world’s leading general lighting
providers for professional users and end consumers. Having emerged from the
general lighting business of OSRAM GmbH, LEDVANCE offers a wide-ranging
assortment of LED luminaires for a broad spectrum of application areas,
intelligent lighting products for Smart Homes and Buildings, one of the
largest LED lamps portfolios in the industry as wellas traditional light
sources
LEDVANCE GmbH
Parkring 29 – 33
85748 Garching
Germany
LEDVANCE.COM
Subject to change without notice. Errors and omission excepted.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>