ARROW FKYS01 Floor Frame Kit Owner’s Manual
- October 30, 2023
- Arrow
Table of Contents
ARROW FKYS01 Floor Frame Kit Owner's Manual
arrowshed.com
ShelterLogic.com/product-registration
Kit contains extra parts
Detailed Assembly Instructions by Shed Type
PARTS LIST
HARDWARE LIST
Assemble your building before starting this kit.
Before You Begin / Site Preparation
- Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner’s manual.
- Follow all directions and dimensions carefully.
- Follow the step sequence carefully for correct results.
- Be sure all the parts fit together properly before proceeding.
- IMPORTANT: Assemble your building before starting this kit.
- SAFETY FIRST: Care must be taken when handling various pieces of your kit since some contain sharp edges. Wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your kit.
- BASIC TOOLS: No. 2 Phillips screwdriver, pliers, work gloves, tape measure, level and a spade or shovel.
- GROUND MUST BE LEVEL: Be sure Floor Frames lie flat on ground. To prepare earth bed, remove sod and other debris. Level the high spots with flat shovel and tamp the bed down.
- DO NOT STEP ON CHANNELS UNTIL FLOORING MATERIAL IS IN PLACE!
- Separate contents of the carton by the part number while reviewing parts list. Check to be sure that you have all the necessary parts for your kit.
4X7 BUILDING
NOTE: Remove existing ramp (9796)
Insert bent tabs into slot in frame.
For plywood layout see page 13
4X10 BUILDING
NOTE: Remove existing ramp (9796)
Insert bent tabs into slot in frame.
For plywood layout see page 14
Plywood Requirements
CHECK BELOW: NUMBER OF SHEETS PER SIZE
One (1) 4′ x 8′ Sheets for 4′ x 7′
Two (2) 4′ x 8′ Sheets for 4′ x 10′
Arrow floor frame kits provide the galvanized metal framework to add a floor to your shed. The frame will raise the floor above ground level to help with drainage under your shed. METAL FRAMING ONLY Attach plywood to complete your shed floor.
Use 5/8″ (16 mm) minimum thickness, exterior grade plywood that has a waterproof adhesive, but DO NOT USE pressure treated plywood. If pressure treated lumber comes in contact with your Arrow product it will cause accelerated corrosion and VOID your warranty.
Installing Plywood
1. Cut Plywood to dimensions shown.
2. Fasten to frame with dry wall screws (not included).
4X7 BUILDING
NOTE : Verify building dimensions prior to cutting plywood. Install your plywood at the rear of the building working to the front.
4X10 BUILDING
NOTE: Verify building dimensions prior to cutting plywood. Install your plywood at the rear of the building working to the front.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>