TOOLOTS FM-5540 Shrink Wrapping Machine User Manual
- October 30, 2023
- TOOLOTS
Table of Contents
- Foreword
- Machine dimension and wooden carton dimension
- Components of the panel
- Machine parts illuminate drawing
- Technical parameters table
- Installation
- Operation method
- Machine maintenance
- Circuit diagram
- Trouble shooting
- Packing list
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
TOOLOTS FM-5540 Shrink Wrapping Machine User Manual
Foreword
Summarization
Thanks for using our machine,It’s a safe ,applied and efficient sealing and
shrinking 2 in 1 packaging machine .
Matters need attentions
A. Pls read this manual before use the machine;
B. Pls take the cautions and machine commond sense in mind before use the
machine;
C. Pls Keep this manual in order to reference;
D. Give this manual to the end user;
E. We reserve the right to make technical modification on this machine
and manual in order to improve and perfect machine performance ;
F. Pls contact us if you have any good suggestion for this machine and
manual;
safety cautions
A. The breaker and wires applied must correspond to the capacity of the
power supply of machine;Otherwise , damage occurs to the parts or wiring if
the smaller capacity breaker or the smaller diameter wires are applied.
B. To guarrantee the liquid would not leak out when packing liquid
product ,if not ,damage would be made to the machine or the operator would
possibly get the electric shock
C. Don’t use the machine in a very moist and humid environment or a place
which full of a lot of vapor;
D. Don’t use the machine in the place which full of dust
E. The sealing blade , asbestus slot and the heating bubo are of high
temperature after a long time running ,don’t touch by hand;
F. Don’t put any metal parts under the sealing blade when sealing in
order to avoid damaging to sealing blade;
G. The sealing time should be of 0.8 to 1.5 second in general ,the
sealing blade would be damaged if the sealing time was set too long.
H. The shrinking temperature should be set between 200°C to 300°C,The
sealing blade would be damaged or a bad packaging effect occurs if the
shrinking temperature is too high.
I. The sealing blade , teflon belt and neoprene rubber would be worn
after a period of time using ,so please prepare some damageable parts ,
examine and repair the machine periodically.
J. Pls cut off the electricity before change the parts .and change the
parts in order。
Features of the machine
A. This machine is widely used for the packaging application of these
industries :food ,toy ,hardware ,cosmetic ,medicine ,daily commodity ,books
,bamboo product ,wooden product and electric appliance;
B. Sealing and shrinking 2 in 1 machine occupying small space and easy to
operate;
C. Applied to variety of shrink film such as PVC,POF etc;
D. The sealing blade is made of alloy ,stick-proof and high temperature-
proof without carbonization and smoking when packing ,it’s prove the sealing
part steady ,The sealing time is easy to adjust according to the thickness of
the film ;
E. Stainless steel heating tube with Heat Sink on the surface that heat
up fast and long life-span of usage;
F. Seal and shrink in one time ,safe , reliable and easy to operate ,the
part sealed on the film is firm and looks well;
G. this machine can work continuously for a long time。
Machine dimension and wooden carton dimension
Machine dimension
-
FM-4030 dimension
-
FM-5540 dimension
Wooden carton dimension
-
FM-4030 carton dimension
-
FM-5540 Carton dimension
Components of the panel
A. Power:Turn on or off the power of machine ;
B. temperature:set the temperature of heating system;
C. sealing time:set the sealing time of blade;
D. shrink time:set the shrink time of shrink system;
Machine parts illuminate drawing
final assembly drawing
No. | Name | Qty |
---|---|---|
1 | frame | 1 |
2 | Film feeding system | 1 |
3 | Srhink system | 1 |
4 | Electric control system | 1 |
5 | Sealing system | 1 |
Distributor plate illuminate drawing
No. | Item | Name | Qty |
---|---|---|---|
1 | Distributor plate | 1 | |
2 | T2 | Sealing blade Transformer | 1 |
3 | T1 | Electromagnetic Transformer | 1 |
4 | V1 | rectifier bridge | 1 |
5 | wiring duct | 1 | |
6 | wiring duct 2 | 1 | |
7 | X | Terminal block | 1 |
8 | QF1 | Heating tube circulate breaker | 1 |
9 | KT2 | Delay relay | 1 |
10 | QF2 | Electronagnetic circulate breaker | 1 |
11 | QF3 | Sealing circulate breaker | 1 |
12 | QF4 | Blowing circulate breaker | 1 |
13 | KM1 | Electromagnetic circulate contactor | 1 |
14 | KM2 | Blowing circulate contactor | 1 |
15 | KM3 | Heating tube circulate contactor | 1 |
16 | KM4 | Sealing circulate contactor | 1 |
blowing system
No. | Item | Name | Qty |
---|---|---|---|
1 | 1-18B | Install box of fan | 1 |
2 | Blowing motor | 1 | |
3 | 2-16J | Shaft sleeve of blowing motor | 1 |
4 | 1-25B | assembling board for heating tube | 1 |
5 | 1-27B | Front heat insulation board | 1 |
6 | 1-22B | left support board for upper frame | 1 |
7 | 1-22B | Right support board for upper frame | 1 |
8 | 1-24B | The open and close board | 1 |
9 | 1-26B | Wind guide board | 1 |
10 | 1-35B | thermocouple | 1 |
11 | 1-35A | Heating tube | 2 |
12 | 1-29B | support board for mesh worktable | 2 |
13 | 1-28B | Pothook for mesh worktalbe | 2 |
14 | 1-34B | Mesh worktable | 1 |
15 | 2-37J | Bolt for support board | 2 |
16 | fan | 1 | |
17 | 1-36B | Heat Sink | 34 |
18 | Heat insulation board | 1 | |
19 | bolt | 4 | |
20 | GB-CROSS-SCREWS-TYPE1 M4X5-5 | 12 | |
21 | Socket head screw M6X16+ gasket 6 | 4 |
Reel holder system drawing
No. | Name | Qty |
---|---|---|
1 | Reel holder | 1 |
2 | Shaft of perforator | 2 |
3 | Wheel | 1 |
4 | Shaft for guide film | 2 |
5 | Installation shelf for guild rail | 2 |
6 | Fixer | 2 |
7 | Cover of the perforator wheel | 4 |
8 | Pin wheel of the perforator | 2 |
9 | grooved wheel | 2 |
10 | cross recessed round head screw M5X16 | 8 |
11 | Fixer bolt | 2 |
12 | bolt | 6 |
13 | Upper board of moveable rail | 2 |
14 | GB-CROSSS-SCREWTYPE1M4X6-6 | 6 |
Technical parameters table
model | FM-4030 | FM-5540 |
---|---|---|
Power supply | 1 phase 220V 50Hz1phase 110V 60Hz | 1 phase 220V 50Hz1 |
phase 110V 60Hz
power| 3.8kw| 4.0kw
Max sealing size| L400W300| L550W400
dimension| L1215W590H1020| L1370W697H1073
weight| 100kg| 125kg
Installation
A. Remove the upper cover board of carton and then remove the sour side
boards;
B. lift and place the machine on the flat ground ;
C. Unpack the protective film which wrapping on the machine and parts;
D. Install the four wheels at the bottom of the base plate in turn and
make sure the ones with brake installed in the front;
E. Install the two stands on the left and right side of the base plate in
turn ,fastening the screws;
F. Put the main body of the machine on the stands(Notice :make the four
iron bolt on the main body of the machine exactly into the four holes on the
stands);
G. The moveable rail on the reel holder corresponds to the moveable rail
on the right side of the machine body ,Adjusting and making the reel holder
in(Notice:some users would like to hang the reel holder up on the machine ,if
so please screw off the screws on the right side of the machine body ,hanging
the reel holder up and fastening the screws.);
H. Be sure that the power supply used corresponds to the nameplate which
shown at the rear of the machine。
Operation method
A. Turn the power on ,adjusting the shrinking temperature according to
the variety and thickness of the shrink film,200°C to 300°C in general;
B. Set the sealing time according to the thickness and variety of the
shrink film,0.8 to 1.5 second in general(The best is to set the sealing time
apropos to make the sealing part steady and good effect,the time set too long
would result in the blade ,blade slot and neoprene rubber are easy broken,set
too short would effect the sealing effect and even cann’t cut absolutely);
C. Usually ,set the sealing time a little longer when just turn power on
due to there is no any accumulation of heat in the blade ,Set the sealing time
a little shorter than beginning due to the accumulation of the heat in the
blade.;
D. drill the shaft of the reel through the film reel ,move the fixer to
the center of the reel and fasten the screws;
E. If hanging reel holder is the choice, put the film reel between the
two rollers directly and posit the two support and get them fastened. ;
F. Put the film reel with a shaft on reel holder ,make the open side of
the film toward to the operator.;
G. drill the film through the perforator ,separate the two layers ,get it
surround the working table;
H. Adjust the height of the mesh ,parallelizing the center line of the
product to be sealed with the sealing blade;
I. Stretch the film to the sealing area and sealing the film only as
first sealing;
J. Place the product on the working table ,Let it covered by the upper
sheet of the film ,stretching the film and the product to the sealing area in
the left ;
K. Keep a distance of the product to the sealing blade as 1/2 height of
product in order to have enough film for shrinking;
L. The indicator light of temperature regulator which on the control
panel will turn to red when the practical temperature reach the set value ,if
so ,press down the chamber hood then the sealing procedure are automatically
finished ,then the blowing shrinking running automatically after 1 second’s
delay.
M. The delay equipment is installed in the machine and had been set the
general parameter’s value well ,if it needs to be reset ,please ask the
professional technician to do it or consult the supplier;
N. The chamber hood spring up automatically after the blowing;
Machine maintenance
A. Clean the working table and shrinking chamber after the daily use;
B. Clean the sealing blade periodically, Notice: Clean the sealing blade
by a piece of dry cotton cloth with the release agent ,Don’t use any metal
scratch the sealing blade;
C. The moveable parts such as transmitting chains ,bearing base needs to
be oiled with lubricant often;
D. The sealing blade , teflon belt and Neoprene rubber must be kept well
,if any of them is worn or damaged ,replace it with new one soon;
E. Turn the power off before repairing ,let professional to do it;
F. The procedures of replacing the sealing blade
- Unfasten the hexangular screws on the blade clamp ,take the worn sealing blade out;
- Then Put one end of the new sealing blade into the slot of the blade clamp ,push the screw on the top of the blade clamp by a tough tool in order to make it unmovable ,then tighten the hexangular screws for fixing the sealing blade;
- put the sealing blade into the ceramic blade slot lightly ,then put the other end of sealing blade into the slot of the other blade clamp;
- push the screw on the top of the blade clamp by a tough tool in order to make it unmovable ,then tighten the hexangular screws for fixing the sealing blade;
- End。
Circuit diagram
Trouble shooting
Fault and failure | Cause | clearing of fault |
---|---|---|
There isn’t any heat on the sealing blade | The breaker tripped | Check the |
circuit and turn on thebreaker
The sealing blade is damaged| Replace the sealing blade
Transformer damaged| Test the output of the transformer during the course of
sealing ,replace the transformer with a new one if it’soutput doesn’t reach
54V
The sealing blade can be heated ,but the film can not be cut off| Partial
damage to the sealingblade| Replace the sealing blade with a newone if breach
found on it
Something unknown attachedon the sealing blade| Clean the sealing blade by a
piece ofcry cotton and the release agent
The teflon belt damaged| Replace the teflon belt with a newone
The neoprene rubber damaged| Replace the neoprene rubber with a new one
if it’s surface is notsmooth
The screws for fixing the ceramic slot of the sealing blade found to be
unfastened ,leading to the lean or incline of the ceramic slot ofthe sealing
blade| Adjust the ceramic slot and fasten the screws
The blowing motor works but the shrinking effect is notgood| The shrinking
temperature istoo low| Increase the shrinking temperature
The blowing and shrinkingtime is too short| Increase the blowing and
shrinkingtime
The chamber hood fall to it’s right place but the machine can’t sealand cut
the film| The inching switch which check and examine whether the chamber hood
has fallen to the right place was of failure ornot to be adjusted well| Make
the inching switch working when the chamber hood falls to the right place or
replace the jiggle switch with a new one once it wasdamaged.
Packing list
No. | Name | Spec. | Qty |
---|---|---|---|
1 | machine | 1set | |
2 | breaker | C32N1P16A | 1pc |
3 | breaker | C32N1P2A | 1pc |
4 | manual | 1ps | |
5 | Teflon tape | 1set | |
6 | Sealing blade | 1set | |
7 | Hexangular spanner | M6 | 1pc |
8 | Hexangular spanner | M4 | 1pc |
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>