HUAWEI CE8800 Data Center Switches User Guide

June 10, 2024
Huawei

CloudEngine 8800, 7800, 6800 and 5800 Series Switches
Issue: 26 (2022-11-25 )
Part Number: 31505402
Quick Start GuideHUAWEI CE8800 Data Center Switches
-

About This Guide

Thank you for purchasing a Huawei CloudEngine series switch. This guide describes how to install CloudEngine 8800&7800&6800&5800 (CE8800&7800&6800&5800 for short) series switches. It also explains how to log in to your switch for the first time.
CE5850-48T4S2Q-EI is used as an example to illustrate how to install the CE8850-32CQ-EI, CE8850E-32CQ-EI and CE7800&6800&5800 series switches. CE8860 is used as an example to illustrate how to install the CE8851, CE8850-HAM,CE8850-SAN, CE8860, CE8861, CE8868 and CE8868 switches. The methods for connecting and logging in to the CE8800&7800&6800&5800 series switches are similar. CE5850-48T4S2Q-EI is used as an example here.
Figures in the document are for reference only and may be different from actual devices.
Any procedural differences between models are specified at the start of each section.
CE6880EI series switches are sold only in specified industries currently. For details about sales strategies, contact For more information, see the for your switch on the Huawei support website.

Packing List

  • Chassis (with the product model on the nameplate)
    If the switch you ordered has built-in power modules and fan modules, the power modules and fan modules are installed in the chassis before the delivery by default.

  • Installation accessory package:
    – Chassis ground cable
    – Console cable
    (only for CE8860, CE8861, CE8868)
    – Warranty Card
    – Quick Start Guide
    – Mounting brackets and guide rails
    – Floating nuts
    – M4 screws
    – M6 screws

NOTE
The numbers and types of items in the installation accessory package differ for different product models.

Safety Guidelines

To ensure personal and equipment safety, observe all the safety precautions on the equipment and in this document. WARNING and CAUTION items do not cover all the safety precautions and are only supplementary to the safety precautions.
Follow all the safety precautions and instructions provided by Huawei. The safety precautions outlined in this document are only requirements of Huawei and do not include general safety requirements. Huawei is not liable for any consequence that results from violation of regulations pertaining to safe operations or safety codes pertaining to design, production, and equipment use.

WARNING

  • Laser beams will cause eye damage. Do not look into bores of optical modules or optical fibers without eye protection.
  • Do not install power cables while the power is on.
  • Do not turn on the power until you have finished installing the chassis and connecting cables.

CAUTION

  • This is a class A product. In a domestic environment this product may cause radio interference in which case the user may be required to take adequate measures.
  • Take ESD protection measures during equipment installation and maintenance. For example, wear ESD gloves or an ESD wrist strap.
  • Do not place other objects on the chassis.

Site Environment

  • Do not place this product in an environment with flammable or explosive gases, or smoke.
  • The installation site must be free from leaking or dripping water, heavy dew, and humidity. If the relative humidity is high, use dehumidifiers or dehumidifying air conditioners.
  • The installation site must be well ventilated. Ensure that air vents on the equipment are not blocked.
  • Leave at least 50 mm clearance at the rear and both sides of the chassis for heat dissipation.
  • Ensure that the temperature and humidity at the installation site meet the switch operation requirements.
  • For the specific requirements, see the Hardware Description for your switch on the Huawei support website.

Installing the Chassis

5.1 Chassis Dimensions

Series Dimensions (W x D x H)
CE8800 CE8860, CE8861, CE8868, CE8850-64CQ-EI: 442.0 mm x 600.0 mm x 88.1 mm

(about 2U) CE8850-32CQ-EI, CE8850E-32CQ-EI: 442.0 mm x 420.0 mm x 43.6 mm (about 1 U) CE8851, CE8850-I-IAM,CE8850-SAN: 442.0mmx600.0mmx43.6mm (about 1U)
CE7800| 442.0 mm x 607.0 mm x 43.6 mm (about 1 U)
CE6800| CE6810-32T16S4Q-LI, CE6851-48S6Q-HI, CE6855-48S6Q-H I, CE6856-48S6Q- HI, CE6857, CE6860, CE6865, CE6866, CE6870, CE6880, CE6881, CE6820, CE6863:
442.0 mm x 420.0 mm x 43.6 mm (about 1U)
Other CE6800 models: 442.0 mm x 600.0 mm x 43.6 mm (about 1 U)
CE5800| 442.0 mm x 420.0 mm x 43.6 mm (about 1 U)

5.2 Requirements for the Cabinet

  • The widths of CE8800, CE7800, CE6800, and CE5800 series switches comply with industry standards. Therefore, these switches can be installed in a standard 19-inch cabinet/rack complying with IEC297.
  • The CE5800, CE6800 (420 mm deep), CE8850E-32CQ-EI and CE8850-32CQ-EI switches can be installed in a 600 mm or deeper cabinet, whereas the CE6800 (600 mm deep), CE7800, CE8850-HAM,CE8850-SAN, CE8851, CE8850-64CQ-EI, CE8860, CE8861 and CE8868 can be installed in an 800 mm or deeper cabinet.
  • On a switch, the side with power modules and fan modules is the power supply side, and the side with service ports is the port side. To leave sufficient cabling space, ensure that the distances from the port side and power supply side to the interior side of the cabinet doors are at least 130 mm and 70 mm respectively.
  • The cabinet must have a reliable ground point to ground the switch.
  • If the CE8800&7800&6800&5800 series switches are installed in the same cabinet with a CE12800 switch, keep a distance of 700 mm to 800 mm between the front and rear mounting rails.

5.3 Installing the Chassis in a Cabinet (CE8850-32CQ-EI, CE8850E-32CQ-EI, CE8851, CE8850-HAM, CE8850-SAN and CE7800&6800&5800 Series Switches)

Before You Start

  • Determine the directions of the port side and power supply side according to actual situations. If the switch needs to connect to servers in the same cabinet, make port sides of the switch and servers face the same direction to facilitate cable connections. Whether the mounting brackets should be installed near the port side or power supply side depends on the direction in which the chassis is installed. Ensure that the rear mounting brackets will not touch the cabinet door. The figures here are for reference only.
  • If the distance between front and rear mounting rails is not within the required range, install guide rails or a tray (self-provided) in the cabinet/rack to support the chassis.
  • Switch and mounting bracket mapping table.

Mounting brackets and guide rails| ****Mounting bracket A| Mounting bracket B| Mounting bracket C| Guide rail E| Guide rail F
---|---|---|---|---|---
CE8850-32CQ-El&
CE8850E-32CQ-EI| Supported| Supported| Supported| Supported| Supported
CE8851&CE8850-HAM&
CE8850-SAN(600 mm deep)| Supported| Not supported| Supported| Supported| Not supported
CE7800&6800
(600 mm deep)| Supported| Not supported| Supported| Supported| Not supported
CE6800&5800
(420 mm deep)| Supported| Supported| Supported| Supported| Supported

Installation Procedure

Step 1 Measure the distance between the front and rear mounting rails (distance A in the figure below). The type and installation method of mounting brackets and matching guide rails vary depending on this distance. (See values in the following table.)HUAWEI CE8800 Data Center Switches - Installation
Procedure

Step 2 Fix mounting brackets to the switch with M4 screws.
Mounting bracket and guide rail bundles for the CE8850-32CQ-EI&CE8850E-32CQ- EI&6800&5800 (420 mm deep)

310 mm-351 mm 369 mm-410 mm

HUAWEI CE8800 Data Center Switches - 310 mm-351 mm| HUAWEI CE8800 Data Center Switches - 369 mm-410 mm
Mounting bracket A
+ Mounting bracket B
+ Guide rail E| Mounting bracket A
+ Mounting bracket B
+ Guide rail E
438 mm-479 mm| 497 mm-538 mm
HUAWEI CE8800 Data Center Switches - 438 mm-479 mm| HUAWEI CE8800 Data Center Switches - 497 mm-538 mm
Mounting bracket A
+ Mounting bracket B
+ Guide rail E| Mounting bracket A
+ Mounting bracket B
+ Guide rail E
539 mm-637 mm| 638 mm-696 mm
HUAWEI CE8800 Data Center Switches - 539 mm-637 mm| HUAWEI CE8800 Data Center Switches - 638 mm-696 mm
Mounting bracket A
+ Mounting bracket C
+ Guide rail E| Mounting bracket A
+ Mounting bracket C
+ Guide rail F
697 mm-835 mm|
HUAWEI CE8800 Data Center Switches - 697 mm-835 mm|
Mounting bracket A
+ Mounting bracket C
+ Guide rail F|

Mounting bracket and guide rail bundles for the CE8851&CE8850-HAM&CE8850-SAN (600 mm deep)

488 mm-616 mm 548 mm-678 mm

Note: If the cabinet is 800 mm deep and the distance between the front and rear mounting rails is in this range, do not close the cabinet door at the side where the rear mounting bracket guide rails are installed. Otherwise, the rear mounting brackets will touch the cabinet door.| Note: If the cabinet is 800 mm deep and the distance between the front and rear mounting rails is in this range, do not close the cabinet door at the side where the rear mounting bracket guide rails are installed. Otherwise, the rear mounting brackets will touch the cabinet door.
HUAWEI CE8800 Data Center Switches - 488 mm-616 mm| HUAWEI CE8800 Data Center Switches - 548 mm-678 mm
Mounting bracket A
+ Mounting bracket C
+ Guide rail E| Mounting bracket A
+ Mounting bracket C
+ Guide rail E
616 mm-748 mm| 675 mm-810 mm
HUAWEI CE8800 Data Center Switches - 616 mm-748 mm| HUAWEI CE8800 Data Center Switches - 675 mm-810 mm
Mounting bracket A
+ Mounting bracket C
+ Guide rail E| Mounting bracket A
+ Mounting bracket C
+ Guide rail E

Mounting bracket and guide rail bundles for the CE7800&6800 (600 mm deep)

493 mm-548 mm 549 mm-551 mm

Note: If the cabinet is 800 mm deep, mounting bracket C will touch the cabinet door. Do not close the door at this side.| Note: Install mounting bracket C in mounting holes at middle of the chassis.
HUAWEI CE8800 Data Center Switches - 493 mm-548 mm| HUAWEI CE8800 Data Center Switches - 549 mm-551 mm
Mounting bracket A
+ Mounting bracket C
+ Guide rail E| Mounting bracket A
+ Mounting bracket C
+ Guide rail E
552 mm-680 mm| 681 mm-815 mm
Note: If the cabinet is 800 mm deep, mounting bracket C will touch the cabinet door. Do not close the door at this side.|
HUAWEI CE8800 Data Center Switches - 552 mm-680 mm| HUAWEI CE8800 Data Center Switches - 681 mm-815 mm
Mounting bracket A
+ Mounting bracket C
+ Guide rail E| Mounting bracket A
+ Mounting bracket C
+ Guide rail E

Step 3 Install eight floating nuts on the front and rear mounting rails, two on each mounting rail.
Step 4 Connect the ground cable to the chassis ground point and place the other end on top of the chassis.
Step 5 Secure guide rails on the front mounting rails with M6 screws.
Step 6 Hold bottom of the chassis with both hands, align the mounting brackets with the guide rails, and slowly slide the chassis into the cabinet.
Step 7 Secure the chassis onto the cabinet with M6 screws.
Step 8 Connect the ground cable to the ground point on the cabinet.

HUAWEI CE8800 Data Center Switches - Connect the
ground

5.4 Installing the Chassis in a Cabinet (CE8860, CE8861, CE8868 and CE8850 -64CQ-EI Switches)
Before You Start
CE8860, CE8861, CE8868 and CE8850-64CQ-EI switches requires 3U of vertical space in a cabinet/rack.

Installation Procedure
Step 1
Mount the expandable guide rails on the mounting rails.
a. Hold a guide rail with its front side facing the front of the cabinet and move it to the planned position.
Expand the guide rail and hook both sides on the mounting rails. Ensure that the three holes on the guide rails are in the same 1U space.
b. Insert plugs on the top holes on both sides of the guide rail to secure the guide rail.
c. Install an M6 screw in the lowest hole on the rear side of the guide rail.
d. (Optional) Install an M6 screw in the lowest hole on the front side of the guide rail to enhance shock resistance of the switch.

HUAWEI CE8800 Data Center Switches - mounting rails

Step 2 Install two floating nuts in the 1U space above the guide rail on each front mounting rail.
HUAWEI CE8800 Data Center Switches - each front
mountingStep 3 Install the front mounting brackets near the power supply side or port side depending on which side is facing the front. In the following figure, the front mounting brackets are installed near the port side.
Step 4 Install the switch in the cabinet.
a. Lift the switch onto the expandable guide rails by two persons.
b. Slowly push the switch into the cabinet until the front mounting brackets are closely attached to the floating nuts on the mounting rails.
c. Secure the front mounting brackets on the mounting rails with M6 screws.HUAWEI CE8800 Data Center Switches - brackets are closely
attached

Step 5 Connect the ground cable to a ground point on the cabinet. The ground points of the CE8860, CE8861, CE8868 and CE8850-64CQ-EI are at the power supply side of the switches.

CAUTION

  • The switch must use the power modules and fan modules matching the product model.
  • The power modules and fan modules used in the switch must have the same airflow direction.
  • Power modules with different airflow directions or power values, AC and DC power modules, or fan modules with different airflow directions cannot be used in the same chassis.
  • FAN-060A series fan modules can only be installed in CE6850HI, CE6850U-HI, CE6855-48T6Q-HI, CE6856-48T6Q-HI and CE6875EI. Installing them in other switch models may damage the fan modules or switches.

Front-to-back airflow: Power modules and fan modules with front-to-back airflow are identified by a or flag. Air flows from the power supply side to the port side.
Back-to-front airflow: Power modules and fan modules with back-to-front airflow are identified by a or flag. Air flows from the port side to the power supply side.

6.2 Installing Power Modules and Fan Modules into the Chassis
Before You Start

  • If the switch is delivered with the power modules and fan modules installed in the chassis, you do not need to install the power modules and fan modules again.
  • Before installing a power module or fan module, remove the filler panel in the slot.
  • If only one power module is used, install a filler panel in the other power module slot.
  • To ensure normal operating, the switch must have two normally running fan modules.
  • Do not remove the two fan modules from the chassis simultaneously. Replace a fan module within 3 minutes.
  • Power modules fixed using a captive screw and a lock are installed differently.
  • Power modules and fan modules are hot pluggable. A fan module is installed the same way as a power module fixed with captive screws.

Installation Procedure
Power module secured by a captive screw
Step 1 Insert the power module into a power slot.
Step 2 Tighten the captive screw on the power module panel.HUAWEI CE8800
Data Center Switches - captive screw

Power module secured by a lock
Insert the power module into a power slot. When the power module is completely seated in the slot, the lock is locked automatically.HUAWEI CE8800 Data
Center Switches - Power module secured

Installing a Card into the Chassis

Before You Start

  • Only the CE8860, CE8861 and CE8868 switches have extended slots for card installation.
  • Install a filler panel in a vacant slot.
  • Slowly push a card into the slot. If you feel resistance or find the card inclined, pull the card out and push it into the slot again. Forcing the card into the slot may damage connectors on the card and backplane.
  • All cards are hot swappable.

Installation Procedure
Step 1 Press the two green locking clips in the middle of the filler panel to eject the ejector levers.
Step 2 Turn the ejector levers outward and slowly pull the filler panel out.
Step 3 Press the two green locking clips in the middle of the card to eject the ejector levers.
Step 4 Slowly push the card into the slot, and then turn the ejector levers inward to lock the card in the slot. When the card is completely seated in the slot, the ejector levers will buckle with the locking clips.
HUAWEI CE8800 Data Center Switches - Installation
Procedure1

Connecting Cables

Before You Start
Ground cable.

  • The switch must be reliably grounded.

  • Attach the M4 lug to the switch and the M6 lug to the ground point.
    Ethernet cable.

  • Category 5E or higher category Ethernet cables are recommended for GE electrical ports.

  • Category 6A shielded or higher category Ethernet cables are recommended for 10GE electrical ports.

  • To protect the switch from lightning, route outdoor cables underground or in steel pipes. Do not route cables aerially.
    Optical fiber.

  • Optical fibers must be used with optical modules. Connectors of fibers and cables must be clean.

  • Cover idle optical ports with dust plugs. All optical ports on a newly delivered switch are covered with dust plugs.

  • The bend radius of optical fibers must be larger than 40 mm.

  • 10GE optical ports use SFP/SFP+ optical modules and optical fibers, SFP+ AOC cables, or SFP+ copper cables.

  • 25GE optical ports use SFP/SFP+ optical modules and optical fibers, SFP+ AOC cables, SFP+ copper cables, SFP28 optical modules and optical fibers, SFP28 AOC cables or SFP28 copper cables.

  • 40GE optical ports use QSFP+ optical modules and optical fibers, QSFP+ AOC cables, or QSFP+ copper cables.

  • 100GE optical ports use QSFP+/QSFP28 optical modules and optical fibers, QSFP+/QSFP28 AOC cables, or QSFP+/QSFP28 copper cables.

  • 200GE optical ports use QSFP56 optical modules and optical fibers, QSFP56 AOC cables, or QSFP56 copper cables.

  • 400GE optical ports use QSFP-DD optical modules and optical fibers, QSFP-DD AOC cables, or QSFP-DD copper cables.

High-speed Cables.

  • The bend radius of high-speed cables must be larger than the minimum bend radius. Overbending high-speed cables may damage wires in the cables.

Country-specific AC power cable.

  • Power cables must be more than 10 cm away from signal cables.
  • The country-specific AC power outlet must have a current rating of 10 A and comply with local standards.
  • The AC power cable must be locked using a locking strap or bundled to the power module handle using a velcro strap.

C13 straight female to C14 straight male AC power cable.

  • Choose this type of power cable when the switch uses AC power modules and receives power from an AC PDU, or when it uses 600 W/1200 W AC&240 V DC power modules and receives power from a 240 V high-voltage DC PDU or power distr ibution box.
  • If a 240 V high-voltage DC power distribution box is used, make OT or cord end terminals for the cable. Cut the C14 straight male connector off and crimp OT or cord end terminals on the bare wires. Connect the brown wire to a negative terminal on the DC power distribution box, the blue wire to a positive terminal, and the yellow-green wire to a protection ground.

Notice the positive and negative tags on DC power cables and power terminals.
380 V high-voltage DC power cable.

  • Choose this type of power cable when the switch uses high-voltage DC power modules and receives power from a 380 V high-voltage DC power distribution box or frame.
  • The delivered cable has bare wires on one end, and OT or cord end terminals must be made for them onsite.
  • Connect the brown wire to the positive pole, blue wire to negative pole, and yellow-green wire to protection ground.
  • The power cable must be locked using a locking strap or bundled to the power module handle using a velcro strap.

Mini USB port.

  • The CE8860, CE8861, CE8868, CE8850-64CQ-EI, CE6850HI, CE6855-48T6Q-HI, CE6856-48T6Q-HI, CE6850U-HI and CE6875EI have a Mini USB port, which provides the same functions as a console port and uses a Mini USB cable.
  • The Mini USB port and console port cannot be used together. Select either of them according to your needs.
    When both the two ports are connected, only the Mini USB port is active.

The USB port is used to transfer upgrade files and configuration files during a USB-based deployment.
Combo port.

  • The CE6850HI, CE6855-48T6Q-HI, CE6856-48T6Q-HI, CE6850U-HI and CE6875EI have two ETH management ports, each of which is a GE combo port. The CE8860, CE8861, CE8868 and CE8850-64CQ-EI have two ETH management ports (GE RJ45). The two ETH management ports cannot be used simultaneously. Choose one of
    them and use the other as a backup.

  • A GE combo port consists of a GE electrical port and a GE optical port. Only one of them can work at a time.

  • Before start of the switch, you can select interface 1 (default) or interface 2 in the BIOS menu. For details, see the Configuration Guide – Basic Configuration Guide > BIOS Menu > Update from ethernert interface > Modify parameters.

Connecting Cables

HUAWEI CE8800 Data Center Switches - Connecting Cables

No. Item Connect To No. Item Connect To
1 Ground cable Protection ground 2 Ethernet cable Switch or computer
3 Optical fiber

AOC cable
Copper cable| Upstream network device or stacked switch| 4| Optical fiber
AOC cable
Copper cable| Upstream network device or stacked switch
5| Ethernet cable| Operation terminal (usually a PC)| 6| Console cable| Operation terminal (usually a PC)
7| USB port| USB flash drive| 8| Country-specific
AC power cable| Country-specific
AC power outlet
8| C13 straight female to C14 straight male AC power cable| AC PDU, 240 V high-voltage DC PDU or power distribution box| 8| DC power cable (for a 350 W
DC power module)| DC power distribution box
380 V high-voltage
DC power cable| 380 V high-voltage DC power distribution box or power distribution frame| DC power cable (for a 1200 W
DC power module)| DC power distribution box

Logging In to the Switch

9.1 Logging In Through the Console Port
Before You Start
Install third-party terminal simulation software on the PC by referring to user manual or online help.

Login Procedure
Step 1 Use a console cable to connect a PC to the console port of the switch.
Step 2 Start the terminal simulation software, create a connection, select a serial port, and set communication parameters.

  • Transmission rate: 9600
  • Data bit (B): 8
  • Parity bit: None
  • Stop bit (S): 1
  • Flow control mode: None

Step 3 Press Enter, and then enter a password as prompted. The configured password will be saved in the system.

An initial password is required for the first login via the console.
Continue to set it? [Y/N]: y
Set a password and keep it safe! Otherwise you will not be able to login via the console.
Please configure the login password (8-16)
Enter Password:
Confirm Password:

  • By default, the system will start the zero-touch provisioning (ZTP) process. To cancel this process, press Ctrl+C. For details about ZTP, see the Configuration Guide  of the product.

  • The password entered in interactive mode is not displayed on the screen.

  • If password authentication is not configured, you do not need to enter a password, but this brings security
    risks. Password authentication is recommended.

  • The password is a string of 8 to 16 case-sensitive characters. It must contain at least two types of the following: uppercase letters, lowercase letters, digits 0 to 9, and special characters excluding question mark (?) and spaces.

  • After a login password is configured, this password will be required upon next login if password authentication is used on this user interface.

  • If you forget the login password, see the Troubleshooting Guide  to restore the password

Now you can configure the switch on the command line interface. For more information, see the Configuration Guide for your switch on the Huawei support website.

9.2 Logging In Through the Mini USB Port
Before You Start

  • The CE8860, CE8861, CE8868, CE8850-64CQ-EI, CE6850HI, CE6850U-HI, CE6855-48T6Q-HI, CE6856-48T6Q-HI and CE6875EI support this login method.
  • Install third-party terminal simulation software on the PC by referring to user manual or online help.

Login Procedure
Step 1 Use a Mini USB cable to connect a PC to the Mini USB port of the switch.
Step 2 Log in to https://support.huawei.com/enterprise to download the Mini USB driver CE_MiniUSB_driver. The Mini USB driver can only be used on Windows XP, Vista, and 7 operating systems.
Install the Mini USB driver on the PC. Right-click My Computer and choose Manage > Device Manager > Port (COM and LPT). “TUSB3410 Device” is the Mini USB driver that you have installed. If “TUSB3410
Step 3 Device” is not displayed in the device manager, reinstall the driver or use another Mini USB cable to connect the PC to the switch.
Step 4 Start the terminal simulation software, create a connection, and set communication parameters for the Mini USB port.

  • Transmission rate: 9600
  • Data bit (B): 8
  • Parity bit: None
  • Stop bit (S): 1
  • Flow control mode: None

Press Enter, and then enter a password as prompted. The configured password will be saved in the system.
Step 5 For the information displayed and notes about the operation, see Step 3 in 9.1 “Logging In Through the Console Port.” After completing this step, you can configure the switch on the command line interface. For more information, see the Configuration Guide for your switch on the Huawei support website.

Obtaining Product Documentation and Technical Support

Huawei Enterprise Technical Support

http://support.huawei.com/enterprise

Importer Information
Importer: Huawei Tech. Investment Co., Ltd. C/O Huawei Technologies Netherlands B.V.
Address: Karspeldreef 4, 1101 CJ Amsterdam, Netherlands VAT# NL815095326B01
Contact information: Huawei ETW/ Li Wenting/+31-20-4300732
Open Source Software Notice
In versions earlier than V200R019C00, you can run the display copyright command in the user view to check the open source software notice.
In V200R019C00 and later versions, log in to https://support.huawei.com/enterprise/en/software/index.html, and check the open source software notice based on the product model and version.

Trademarks and Permissions
HUAWEI logo and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective holders.

Supplier’s Declaration of Conformity (SDoC)
Unique Identifier: trade name: HUAWEI; product name: Switch; model number: CloudEngine 8800&7800&6800&5800 series switches

Party issuing Supplier’s Declaration of Conformity
Huawei Technologies Co., Ltd.
Bantian, Longgang District,
Shenzhen, 518129, P.R.C
Tel: +86 755 28780808
Responsible Party- U.S. Contact Information
Huawei Technologies USA Inc.
5700 Tennyson Parkway, Suite 500
Plano, Texas 75024
Main: 214-919-6000 / TAC Hotline: 877-448-2934
FCC Compliance Statement ( for products subject to Part 15)
This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.

Copyright © Huawei Technologies Co., Ltd. 2022. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co., Ltd.

Qualification Card
PASS

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals