HUAWEI SUN2000 3 Phase Solar Inverter User Guide

June 9, 2024
Huawei

SUN2000-111KTL-NHM0 (large current)
Quick Guide

SUN2000 3 Phase Solar Inverter

Issue: 01
Part Number: 31500HWT
Date: 2023-03-30
HUAWEI TECHNOLOGIES CO., LTD.
NOTICE

  • The information in this document is subject to change without notice. Every effort has been made in the preparation of this document to ensure accuracy of the contents, but all statements, information, and recommendations in this document do not constitute a warranty of any kind, express or implied.
  • Only certified electricians are allowed to operate the device. Operation personnel should understand the composition and working principles of the grid-tied PV power system and local regulations.
  • Before installing the device, read the user manual carefully to get familiar with product information and safety precautions. Huawei shall not be liable for any consequences  caused by the violation of the storage, transportation, installation, and operation regulations specified in this document and the user manual.
  • Use insulated tools when installing the device. For personal safety, wear proper personal protective equipment (PPE).

Overview

Front ViewHUAWEI SUN2000 3 Phase Solar Inverter -
Overview

  1. PV connection indicator
  2. Grid connection indicator
  3. Communication indicator
  4. Alarm/Maintenance indicator
  5. Host panel cover
  6. Maintenance compartment

Port IllustrationHUAWEI SUN2000 3 Phase Solar Inverter - Port
Illustration

(1) Spot-check terminal connection box| (10) DC input terminal group 3 (PV15–PV20, controlled by DC SWITCH 3)
---|---
(2) DC input terminal group 1 (PV1–PV8, controlled by DC SWITCH 1)| (11) (Optional) Screw hole for DC switch 3
(3) (Optional) Screw hole for DC switch 1| (12) DC switch 3 (DC SWITCH 3)
(4) DC switch 1 (DC SWITCH 1)| (13) Reset button 3 (RESET 3)
(5) Reset button 1 (RESET 1)| (14) Ventilation valve
(6) DC input terminal group 2 (PV9–PV14, controlled by DC SWITCH 2)| (15) USB port (USB)
(7) (Optional) Screw hole for DC switch 2| (16) Communications port (COM)
(8) DC switch 2 (DC SWITCH 2)| (17) Hole for the AC output power cable
(9) Reset button 2 (RESET 2)| (18) Hole for the tracking system power cable

DC Switch Description
DANGER

The DC switches automatically turn off when a fault occurs in the inverters (LED4 is steady red, and the three DC switches are OFF). In this case, contact your technical support. Do not turn on the DC switches by yourself.

Switch Component Description
DC SWITCH ON

protection.
| The DC switch is ON but cannot automatically turn off for protection.
OFF| The DC switch is OFF.
RESET| • When the DC switch automatically turns off for protection, the RESET button will be released.
• When the RESET button is not pressed, the DC switch can only be turned to the unloaded position , and cannot be set to the ON position.

SUN2000 DimensionsHUAWEI SUN2000 3 Phase Solar Inverter -
Dimensions Mounting Bracket DimensionsHUAWEI
SUN2000 3 Phase Solar Inverter - Bracket Dimensions

Installation Requirements

NOTICE
If inverters are installed in a place with abundant vegetation, in addition to routine weeding, harden the ground underneath the inverters using cement or gravel  (recommended area: 3 m x 2.5 m).
2.1 Installation AngleHUAWEI SUN2000 3 Phase Solar Inverter -
Installation Angle 2.2 Installation SpaceHUAWEI SUN2000 3 Phase Solar Inverter - Installation
Space NOTE
For ease of installing the SUN2000 on the mounting bracket, connecting cables to the bottom of the SUN2000, and maintaining the SUN2000 in future, it is recommended that the bottom clearance be between 600 mm and 730 mm.

Installing a Solar Inverter

NOTE

  • This quick guide describes how to install a solar inverter on a support. For details about wallmounted installation, see the user manual.
  • The M12x40 bolt assemblies are delivered with the solar inverter. If the bolt assembly length does not meet the installation requirements, prepare M12 bolt assemblies by yourself and use them together with the delivered M12 nuts.
  • Before installing the mounting bracket, remove the security Torx wrench and set it aside.

NOTICE
Use the handles to facilitate installation. Handles are optional and delivered separately. Ensure that the handles are securely installed. After the installation is complete, remove the handles and set them aside.

Installation Positions of Handles During Transportation| Installation Positions of Handles During Installation
---|---
|

  1. Install the mounting bracket.
    NOTE
    It is recommended that anti-rust measures be taken on the positions for drilling holes.HUAWEI SUN2000 3 Phase Solar Inverter - mounting
bracket

  2. Install the solar inverter onto the mounting bracket.

  3. Tighten security Torx screws.HUAWEI SUN2000 3 Phase Solar Inverter - Torx screws

Connecting Cables

WARNING

  • Do not connect loads between the inverter and the AC switch that directly connects to the inverter. Otherwise, the switch may trip by mistake.
  • If an AC switch is used with specifications beyond local standards, regulations, or the Company’s recommendations, the switch may fail to turn off in a timely manner in case of exceptions, causing serious faults.

CAUTION
Each inverter must be equipped with an AC output switch. Multiple inverters cannot connect to the same AC output switch.
NOTICE

  • Connect cables in accordance with the local installation laws and regulations.
  • To prevent poor cable connection due to overstress, leave enough slack before connecting the cables to the appropriate ports.
  • To ensure that the inverter can be safely disconnected from the power grid when an exception occurs, connect an AC switch to the AC side of the inverter. Select an appropriate AC switch in accordance with local industry standards and regulations.

4.1 Preparations
NOTE

  • S and Sp are the conductor cross-sectional areas of AC power cables and PE cables respectively.
  • The cable diameter must comply with local cable standards.
  • The factors that affect cable selection include the rated current, cable type, routing mode, ambient temperature, and maximum expected line loss.

No.| Cable| Type| Conductor CrossSectional Area| Outer Diameter
---|---|---|---|---
1| PE cable [1]| Outdoor cable and M10 OT/DT
terminals| Sp ≥ S/2| N/A
2| Tracking system power cable| Three-core outdoor copper cable with dual- layer protection| 10 mm²| 15–18 mm
3| AC output
power cable
(multi-core)| • If you connect a ground cable to the ground point on the chassis shell, you are advised to use a three-core (U, V, and W) outdoor cable and M12 OT/DT terminals (U, V, and W).
• If you connect a ground cable to the  ground point in the maintenance compartment, you do not need to prepare a
PE cable but are advised to use a four-core (U, V, W, and PE) outdoor cable, M12 OT/DT terminals (U, V, and W), and
M10 OT/DT terminals (PE).| • Copper cable − S: 70–240 mm²
− Sp ≥ S/2
• Aluminum alloy cable or copperclad aluminum cable: − S: 95–240 mm 2
− Sp ≥ S/2| 24–66 mm
3| AC output power cable (single-core) [2]| You are advised to use a singlecore outdoor cable and M12 OT/DT terminals.| • Copper cable − S: 70–240 mm²
• Aluminum alloy cable or copperclad aluminum cable: − S: 95–240 mm2| 14–32 mm
4| DC input power cable| PV cable that meets the 1100 Vstandard| 4-6 mm², 12-10 AWG| 5.9-8.8 mm
5| RS485 communicationscable| Outdoor shielded twisted pair that meets the local standard| 0.25–1 mm²| • One or two communications cables: 4–11 mm
• Three communications cables: 4–8 mm

Note [1]: The value of Sp is valid only if the conductors of the PE cable and AC power cable use the same material. If the materials are different, ensure that the conductor of the PE cable with a proper cross-sectional area produces a conductance equivalent to that of the cable specified in the table. The specifications of the PE cable are subject to this table or calculated according to IEC 60364-5-54.
Note [2]: For some models, the outer diameter of a single-core cable ranges from 14 mm to 36 mm based on the label in the maintenance compartment.
4.2 Installing a PE Cable
NOTE

  • It is recommended that the PE cable of the solar inverter be connected to a nearby ground point. Connect the PE points of all solar inverters in the same array to ensure equipotential connections to PE cables.
  • To enhance the corrosion resistance of a ground terminal, you are advised to apply silica gel or paint on it after connecting the PE cable.

HUAWEI SUN2000 3 Phase Solar Inverter - PE Cable 4.3 Opening the Maintenance Compartment Door
WARNING

  • Do not open the panel of the solar inverter.
  • Before opening the maintenance compartment door, turn off the downstream AC output switch and three DC switches at the bottom.
  • Do not open the maintenance compartment door in rainy or snowy days. If you have to, take protective measures to prevent rain or snow from entering the maintenance compartment.
  • Do not leave unused screws in the maintenance compartment.
  1. Loosen the screws on the maintenance compartment door.
  2. Open the maintenance compartment door and adjust the support bar.HUAWEI SUN2000 3 Phase Solar Inverter - Compartment Door 1
  3. Remove the accessories and set them aside.HUAWEI SUN2000 3 Phase Solar Inverter - Compartment Door 2

4.4 Removing the Rubber Rings from the Crimping Module
Use scissors to cut off the joints of the rubber rings to remove them. All rubber rings are removed in the same way.
NOTICE
Remove the corresponding rubber rings strictly according to the cable diameter range, and ensure that the crimping module is not damaged. Otherwise, the protection level of the solar inverter will be affected.HUAWEI SUN2000 3
Phase Solar Inverter - Crimping Module 4.5 (Optional) Installing the Tracking System Power Cable
NOTICE

  • A switch-disconnector-fuse or fuse-switch-disconnector with a voltage of no less than 500 V, current of 16 A, and protection type of gG needs to be installed between the SUN2000 and the tracker controller for protection.

  • The tracking system should be equipped with an overcurrent protective device or component.
    The length of the cable between the power cable terminal and the overcurrent protection device or component must be less than or equal to 2.5 m.

  • The power supply of the tracking system should be an AC three-phase power grid.

  • Keep inflammable materials away from the power cable.

  • The power cable must be protected with a conduit to prevent short circuits caused by insulation layer damage.

HUAWEI SUN2000 3 Phase Solar Inverter - Power Cable 4.6 Installing the AC Output Power Cable
NOTICE

  • The cable outer diameter can be measured using the ruler sticker in the maintenance compartment.
  • Ensure that the AC output power cable is secured. Failure to do so may cause the solar inverter to malfunction or damage to its terminal block by issues such as overheating.
  • Sufficient slack should be provided in the PE cable to ensure that the last cable bearing the force is the PE cable when the AC output power cable bears pulling force due to force majeure.
  • If a screw on the maintenance compartment door is lost, obtain the spare screw from the fitting bag tied at the bottom of the maintenance compartment.

Multi-core Connection MethodHUAWEI SUN2000 3 Phase Solar Inverter -
Connection Method Single-core Connection Method
NOTE
The 32–36 mm cable is supported only by some models. Refer to the corresponding label to get the supported size.HUAWEI SUN2000 3 Phase Solar
Inverter - Connection Method 2 4.7 Installing DC Input Power Cables
Selecting DC Input Terminals
WARNING
Before connecting the PV module output to the inverter, test the insulation resistance between the PV– cables and the ground to ensure that the PV module output is properly insulated to the ground. Use an insulation resistance tester to add 1500 V voltage between the PV– cables and the ground, and check the resistance. Ensure that the insulation resistance of all PV– cables is greater than or equal to 1 MΩ. If the value is less than 1 MΩ, troubleshoot the cable insulation.
When the DC inputs are not fully configured, the DC input terminals must meet the following requirements:

  1. Evenly distribute the DC input power cables on the DC input terminals controlled by the three DC switches. DC SWITCH 1 is preferred.
  2. The even-numbered PV terminals are preferred to maximize the connections of MPPTs.
  3. If the number of PV inputs is 11 to 19, connect cables to the odd-numbered PV terminals from PV1 and PV19, and avoid connections to adjacent MPPTs if possible.

HUAWEI SUN2000 3 Phase Solar Inverter - Input
TerminalsIf the number of PV inputs is 11 to 19, the DC input terminals are selected as follows.

Number of PV Inputs SWITCH 1 SWITCH 2 SWITCH 3
MPPT1 MPPT2 MPPT3 MPPT4
MPPT7 MPPT8 MPPT9 MPPT10
11 PV2 PV4 PV6
PV1
12 PV2 PV4 PV6
PV1
13 PV2 PV4 PV6
PV1 PV5
14 PV2 PV4 PV6
PV1 PV5
15 PV2 PV4 PV6
PV1 PV5
16 PV2 PV4 PV6
PV1 PV5
17 PV2 PV4 PV6
PV1 PV3 PV7
18 PV2 PV4 PV6
PV1 PV3 PV5
19 PV2 PV4 PV6
PV1 PV3 PV5 PV7

Installing a DC Input Power Cable
NOTICE

  1. Use the positive and negative Amphenol Helios H4 metal contacts and DC connectors supplied with the solar inverter. Using incompatible positive and negative metal contacts and DC connectors may result in serious consequences. The caused device damage is not covered under any warranty.
  2. Before connecting the DC input power cables, label the cable polarities to ensure correct cable connections. Otherwise, the solar inverter may be damaged.
  3. Measure the voltage at the DC input end using a multimeter set to the DC position. If the voltage is a negative value, the DC input polarity is incorrect. Correct the polarity. If the voltage is greater than 1100 V, too many PV modules are configured to the same string. Remove some PV modules.
  4. If the DC input power cable is reversely connected and the DC switches are set to ON, do not perform any operation on the switches or the positive and negative connectors. Otherwise, the device may be damaged. The caused device damage is not covered under any warranty. Wait until the solar irradiance weakens at night and the PV string current decreases below 0.5 A. Set the three DC switches to OFF, and correct the connection of positive and negative connectors.
  5. For models of the crimping tool and removal wrench, use the recommended model or contact your dealer.
  6. Connect the PV string connector to the inverter connector, and then pull back the PV string connector along the axial direction to check whether the connectors are securely connected.
  7. The connector must be securely connected. Damages caused by improper connection are not covered under the warranty.

HUAWEI SUN2000 3 Phase Solar Inverter - DC Input Power
Cable Connector connection:HUAWEI
SUN2000 3 Phase Solar Inverter - Connector connection 4.8 Installing the RS485 Communications Cable
NOTICE
When routing communications cables, separate communications cables from power cables to prevent communication from being affected.

Port| Pin| Definition| Pin| Definition| Description
---|---|---|---|---|---
RS485-1| 1| RS485A IN, RS485 differential signal+| 2| RS485A OUT, RS485 differential signal+| Used for cascading solar inverters or
connecting to devices such as the
SmartLogger.
3| RS485B IN, RS485 differential signal-| 4| RS485B OUT, RS485 differential signal-
Protection ground| 5| PE, shielding ground| 6| PE, shielding ground| N/A
RS485-2| 7| RS485A, RS485 differential signal+| 8| RS485B, RS485 differential signal-| Used for connecting to RS485 slave devices.

Connecting RS485 Communications Cables (4–8 mm Four-hole Rubber Plug)HUAWEI SUN2000 3 Phase Solar Inverter - Rubber
Plug NOTE
When using the four-hole rubber plug, block the unused cable hole with a plug, and then tighten the locking cap.
Connecting RS485 Communications Cables (4–8 mm Two-hole or Three-hole Rubber Plug)HUAWEI SUN2000 3 Phase Solar Inverter - Rubber Plug
2

Verifying the Installation

No. Acceptance Criteria
1 The solar inverter is installed correctly and securely.
2 The DC switches and downstream AC switch are set to OFF.
3 All cables are connected correctly and securely.
4 The installation space is proper, and the installation environment is clean

and tidy.
5| The maintenance compartment door is closed and secured.
6| Unused DC input terminals are sealed.
7| Unused USB ports are plugged with watertight caps.

Powering On the System

WARNING
When LED2 is steady green (meaning that the inverter is grid-tied), do not turn on any DC switch. Otherwise, the inverter may be damaged because the insulation resistance is not detected.
NOTICE

  • Before turning on the AC switch between the solar inverter and the power grid, check that the AC voltage is within the specified range using a multimeter set to the AC position.
  • Do not turn the DC switch to the unloaded position .
  1. Turn on the AC switch between the solar inverter and the power grid.
  2. Set DC SWITCH 1 (MAIN SWITCH) at the bottom of the solar inverter chassis to ON. When you hear a click sound, the switch is ON.
  3. Check the status of the PV connection indicator. If it is steady green, set DC SWITCH 2 and DC SWITCH 3 to ON.
  4. Observe the LED indicators to check the operating status of the solar inverter.

Indicator| Status (Blinking Fast: On for 0.2s and then Off for 0.2s; Blinking Slowly: On for is and then Off for is)| Description
---|---|---
PV connection indicator| Steady green| At least one PV string is properly connected, and the DC input voltage of the corresponding MPPT circuit is at least 200 V.
Blinking green fast| If the alarm/maintenance indicator is red, an environmental fault at the DC side of the solar inverter is generated.
Off| The solar inverter disconnects from all PV strings, or the DC input voltage of all MPPT circuits is less than 200 V.
Grid connection indicator| Steady green| The solar inverter is in grid-tied mode.
Blinking green fast| If the alarm/maintenance indicator is red, an environmental fault at the AC side of the solar inverter is generated.
Off| The solar inverter is not in grid-tied.
Communications indicator| Blinking green fast| The solar inverter receives communication data normally.
Off| The solar inverter has not received communication data for 10 seconds.
Alarm/ Maintenance indicator| Alarm status| Steady red| A major alarm is generated.
• If the PV connection indicator or grid connection indicator is blinking green fast, troubleshoot DC or AC environmental faults as instructed by the SUN2000 app.
• If the PV connection indicator and grid connection indicator are both not blinking green fast, replace components or the solar inverter as instructed by the SUN2000 app.
Blinking red fast| A minor alarm is generated.
Blinking red slowly| A warning alarm is generated.
Local maintenance  status| Steady green| Local maintenance succeeds.
Blinking green fast| Local maintenance fails.
Blinking green slowly| In local maintenance or shuts down over a command.

Commissioning

NOTE

  • The FusionSolar app is recommended when the solar inverter is connected to the FusionSolar smart PV management system. The SUN2000 app is recommended when the solar inverter is connected to other management systems.
  • The FusionSolar app or SUN2000 app communicates with the solar inverter through the WLAN module, Bluetooth module, or USB data cable to provide functions such as alarm query, parameter settings, and routine maintenance.
  • Access the Huawei app store (http://appstore.huawei.com), search for FusionSolar or SUN2000, and download the app installation package.

| https://intl.fusionsolar.huawei.com/pvmswebsite/nologin/assets/build/index.html#/jumppage
---|---
| https://url.cloud.huawei.com/hGFbasdw8U
| https://apps.apple.com/cn/app/id1055287443

Scenario in Which Solar Inverters Are Connected to the FusionSolar Smart PV Management System

  1. Enable the public network of the mobile phone, open the FusionSolar app, log in to intl.fusionsolar.huawei.com as installer account, and choose My > Device commissioning. Then, scan the QR code on the WLAN module or the bar code on the Bluetooth, or connect a USB data cable, a Bluetooth module, or a WLAN module to the USB port of the inverter to implement communication between the inverter and the app.
  2. Enter the login password.
  3. Tap Log in and go to the Quick Settings screen or function menu screen.

Scenario in Which Solar Inverters Are Connected to Other Management Systems

  1. Open the SUN2000 app, scan the QR code on the WLAN module or the bar code on the Bluetooth module, or connect a USB data cable, a Bluetooth module, or a WLAN module to the USB port of the inverter to implement communication between the inverter and the app.
  2. Enter the login password.
  3. Tap Log in and go to the Quick Settings screen or function menu screen.

HUAWEI SUN2000 3 Phase Solar Inverter - Management
Systems

NOTICE

  • The SUN2000 app version must be 3.2.00.013 (Android) or later, and the FusionSolar app version must be 5.7.008 (Android) or later. The screenshots are for reference only. The actual screens may vary.
  • When the WLAN connection is used, the initial name of the WLAN hotspot is Adapter-WLAN module SN, and the initial password is Changeme.
  • When you log in to the system for the first time, set the login password. To ensure account security, change the password periodically and keep the new password in mind. Not changing the initial password may cause password disclosure. A password left unchanged for a long period of time may be stolen or cracked. If a password is lost, devices cannot be accessed. In these cases, the user is liable for any loss caused to the PV plant.
  • Set the correct grid code based on the application area and scenario of the solar inverter.

NOTE

For details about the SUN2000 app and FusionSolar app, see the app quick guide. You can scan the QR code to obtain the quick guide.

HUAWEI SUN2000 3 Phase Solar Inverter - qr code 4https://info.support.huawei.com/dpdoc/fs_qg_c/en

Huawei Technologies Co., Ltd.
Huawei Industrial Base, Bantian, Longgang
Shenzhen 518129 People’s Republic of China