nVent RAYCHEM FTC-HST-PLUS FTC Heat Shrinkable Connection Kit Instruction Manual

October 29, 2023
nVent RAYCHEM

nVent RAYCHEM FTC-HST-PLUS FTC Heat Shrinkable Connection Kit Instruction Manual
nVent RAYCHEM FTC-HST-PLUS FTC Heat Shrinkable Connection
Kit

APPROVALS

US LISTED

LISTED With Raysol, Icestop
with IceStop cable -WS with HWAT -G with Raysol -W

KIT CONTENTS

Item Qty Description
A 4 Insulated bus wire crimps
B 4 Uninsulated braid crimps; 2 large, 2 small
C 6 Cable ties
D 16 Mastic strips
E 2 End plugs
F 2 Heat-shrinkable tubes (5 in long, 1.5 inch diameter)
G 2 Black cloth tapes (6 in long)
H 2 Clamp tie

WARNING:

This component is an electrical device that must be installed correctly to ensure proper operation and to prevent shock or fire. Read these important warnings and carefully follow all the installation instructions.

  • To minimize the danger of fire from sustained electrical arcing if the heating cable is damaged or improperly installed, and to comply with the requirements of nVent, agency certifications, and national electrical codes, ground fault equipment protection must be used. Arcing may not be stopped by conventional circuit breakers.
  • Bus wires will short if they contact each other. Keep bus wires separated.
  • Keep components and heating cable ends dry before and during installation.
  • The black heating cable core is conductive and can short. It must be properly insulated and kept dry.
  • Component approvals and performance are based on the use of nVent-specified parts only. Do not use substitute parts or vinyl electrical tape.
  • Leave these instructions with end user for reference and future use.

DESCRIPTION

The nVent RAYCHEM FTC-HST-PLUS is for use with heating cables to make splice and tee connections. The kit contains materials for two splice or two tee connections. An nVent RAYCHEM RayClic-E end seal or WHES end seal for nVent RAYCHEM RIM systems is required when using FTC-HST-PLUS as a tee kit. These installation instructions should be used in conjunction with the nVent RAYCHEM XL-Trace Edge, RaySol, WFP, HWAT and IceStop Installation and Operation Manuals. For technical support, contact your nVent representative or call nVent at (800) 545-6258.

TOOLS REQUIRED

  • Diagonal cutters
  • Utility knife
  • Crimp tools (Ideal 30-429 and T&B WT112M or WT2000)
  • Hammer and nail (for gutter/downspout applications only)
  • Needle nose pliers
  • Heat gun or torch

IMPORTANT: First verify heating cable is appropriate for the application. The cable type is printed on the outer jacket:

IceStop and WFP Roof and gutter de-icing
XL-Trace Edge: Above ground pipe freeze protection
RaySol: Floor warming
HWAT: Hot water temperature maintenance

TOOLS REQUIRED

CAUTION:

HEALTH HAZARD : Overheating heat-shrinkable tubes will produce fumes that may cause irritation. Use adequate ventilation and avoid charring or burning. Consult SDS at nVent.com for further information.

CHEMTREC 24-hour emergency telephone: (800) 424-9300

Non-emergency health and safety information: (800) 545-6258.

RAY3122

ITCSN

The instructions are shown for a tee connection. Splice connections are done the same way, without the third heating cable section

HEATING CABLE CONSTRUCTION

IceStop, XL-Trace Edge and RaySol Heating Cables
HEATING CABLE CONSTRUCTION

  • Allow 12 in of extra heating cable as shown. If necessary trim cables evenly.
    HEATING CABLE CONSTRUCTION

  • Lightly score completely around and then down outer jacket.

  • Bend heating cable to break jacket at score then peel off outer jacket.
    HEATING CABLE CONSTRUCTION

  • Unravel the braid back 2 inches.

  • Position braid on same side of each heating cable section.

  • Straighten the braid and twist into a “pigtail”.HEATING CABLE CONSTRUCTION

  • HWAT ONLY; otherwise go to step 5.

  • Using wire cutters, cut away aluminum wrap
    HEATING CABLE CONSTRUCTION

  • At the end of each heating cable section lightly score completely around and down inner jacket.`
    HEATING CABLE CONSTRUCTION

  • Bend heating cable to break jacket at score, then peel off inner jacket.
    HEATING CABLE CONSTRUCTION

  • Notch core at the end.

  • Twist back and peel bus wires from core.
    HEATING CABLE CONSTRUCTION

  • Peel core and any remaining material from bus wires.

Repeat steps 2 through 6 for other heating cable sections.

  • Use clean gloves.

  • Remove release paper from mastic strip.

  • Don’t let dirt or particles get into mastic.

  • Wrap a piece of mastic around the outer jacket on each heating cable section.
    HEATING CABLE CONSTRUCTION

  • Remove release paper from mastic strip.

  • Wrap a piece of mastic around the end of each heating cable section and position as shown.

  • Pinch the mastic in the center to completely seal the core at the end of each heating cable.
    HEATING CABLE CONSTRUCTION

  • Carefully align the heating cable sections and place them together.

  • Press mastic strips firmly together.
    HEATING CABLE CONSTRUCTION

  • Fasten with a cable tie at each of the two positions shown.

  • Twist the braid pigtails together firmly

  • Slide uninsulated crimp over braid to within 1/4 inch of heating cable as shown.

  • Crimp the braid, using the Ideal crimp tool.

  • Crimp firmly to ensure the crimp is not loose.

  • Cut off the extra braid.
    HEATING CABLE CONSTRUCTION

Note: Use the large crimp for the HWAT cables and the small crimp for the other cables.

  • Fold the crimped braid back against the heating cables.
  • Wrap black cloth tape evenly around crimp and heating cables. Cover crimp completely
    HEATING CABLE CONSTRUCTION

CAUTION: Ensure flat surface of crimp touches cables in order to have a less bulky shape.

  • Select one bus wire from each cable section and twist the wires together firmly
  • Repeat with remaining bus wires. Be careful not to twist together bus wires from the same heating cable.
  • Use insulated bus wire crimps and T&B crimp tool (Insulated cavity section) to crimp each set of bus wires together firmly to ensure crimps are not loose.
    HEATING CABLE CONSTRUCTION

CAUTION: Ensure there is no visible damage to the insulation layer of two crimps. After crimping, pull on crimp connection to check tightness.

  • First check that there are no cracks or damage to end plug. Slide end plug over bus wire crimps all the way and push firmly toward mastic.

  • Wrap one piece of mastic around open end of end plug so half of width covers end of plug and half covers cables.

  • Apply second piece of mastic like the first one to completely cover end of plug. Press mastic pieces together and into plug and wire mastic pieces.
    HEATING CABLE CONSTRUCTION

  • Slide in the 5 inch heat shrink tube and align it with the flange of end plug, then start heating by a heat gun from the end plug toward the cables.
    HEATING CABLE CONSTRUCTION

  • Apply heat with heat gun or torch for at least 5 minutes or until tubing is completely shrunk. Start from end plug towards cables. Ensure heat shrink is completely shrunk in each section, especially around mastic.

  • Preferably apply heat in well ventilated area or outdoors.

  • Be careful not to burn or damage cable jacket, heat shrink tubing, or end plug.

  • The edge of the heat shrink tube may shrink and have a gap with the flange of end plug which is acceptable.
    HEATING CABLE CONSTRUCTION

CAUTION : To avoid burns allow heated sections to cool before touching.

For applications except IceStop in gutters and downspouts

  • After the connection has cooled, fold over the connection and fasten it with the third cable tie.

IceStop gutter and downspout applications

  • Secure heating cable with down-spout hanger (GM-RAKE).
  • Fasten clamp tie to center of connection.
  • Use a hammer, nail, and clamp tie to secure connection and keep it off of the gutter bottom as shown.
    HEATING CABLE CONSTRUCTION

CAUTION: For cleaning, first disconnect the power, and cover the splice area before washing. Preferably avoid pressure washing on the splice area.

For RaySol splice applications in conduit.
HEATING CABLE CONSTRUCTION
HEATING CABLE CONSTRUCTION

  • Allow 36 inches of extra heating cable as shown.
    HEATING CABLE CONSTRUCTION

  • Allow 48 inches of extra heating cable as shown.
    HEATING CABLE CONSTRUCTION

HWAT Tee
HEATING CABLE CONSTRUCTION

HWAT Splice
HEATING CABLE CONSTRUCTION

North America
Tel +1.800.545.6258
Fax +1.800.527.5703
[email protected]

Europe, Middle East, Africa
Tel +32.16.213.511
Fax +32.16.213.604
[email protected]

Asia Pacific
Tel +86.21.2412.1688
Fax +86.21.5426.3167
[email protected]

L atin America
Tel +1.713.868.4800
Fax +1.713.868.2333
[email protected]

©2021 nVent. All nVent marks and logos are owned or licensed by nVent Services GmbH or its affiliates. All other trademarks are the property of their respective owners. nVent reserves the right to change specifications without notice. RAYCHEM-IM-H54592-FTCHSTPLUS-EN-211


References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

nVent RAYCHEM User Manuals

Related Manuals