meRcia 04GREEN0806SD-V6 8X6 Greenhouse Instruction Manual

June 9, 2024
Mercia

04GREEN0806SD-V6 8X6 Greenhouse

General Instructions
04GREEN0806SD-V6 8X6 GREENHOUSE
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY – Check the pack and make sure you have all the parts listed. – When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit. – Ensure there is plenty of space and a clean dry area for assembly.
LOCATION FOR YOUR GARDEN BUILDING A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance, annual treatment and to allow air flow around the building.
Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing damage to the building.
TIMBER As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings – Require a preservative treatment to protect against rot and decay and a waterproof treatment to prevent water ingress Pressure Treated buildings – Require a waterproof treatment to prevent water ingress Log Cabins – Are supplied untreated and require a preservative and waterproofing treatment.
BUILDING A BASE When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and annual treatment.
Ensure the base is level and is built on firm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above the surrounding ground level to avoid flooding.
TYPES OF BASE – Concrete 75mm laid on top of 75mm hard-core. – Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.

Please retain product label and instructions for future reference

x2 All buildings should be erected by two adults

Winter = High Moisture = Expansion Summer = Low Moisture = Contraction

2mm Drill bit

For ease of assembly, you MUST pilot drill all screw holes and ensure all screw heads are countersunk.

CAUTION Every effort has been made during the manufacturing process to eliminate the prospect of splinters on rough surfaces of the timber. You are strongly advised to wear gloves when working with or handling rough sawn timber.

For ease of assembly, you will need a tape measure to check dimensions of components.

Screws & Nails

Bolts

Measure overall length

Measure under the
head

To identify the fixings required for each step use a measuring tape.

Protim Aquatan T5 (621)
Your building has been dip treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct application of Aquatan solution and then allowed to dry.
Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY

PLEASE SCAN HERE:

For assistance please contact customer care on: 01636 821215 Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN
www.merciagardenproducts.co.uk
P 1

04GREEN0806SD-V6
Overall Dimensions: Width = 2042mm Depth = 2460mm Height = 2059mm
Base Dimensions: Width =1864mm Depth = 2386mm
Before assembly please make sure you have a suitable base ready to erect your
building

MADE IN GREAT BRITAIN

1

2

3

Door Side
AI-04GREENDS610X1543-V5
QTY 2
4

Window Side
AI-04GREENWS1776X1543-V5
QTY 1
5

Small Window Side
AI-04GREENWS1193X1543-V5
QTY 4
6

Door Gable Top
AI-04GREENDGT1864X426-V2
QTY 1

Plain Gable Top
AI-04GREENPGT1864X426-V2
QTY 1

Roof (Opening Window)
AI-04GREENROOFOW1218X1037-V1
QTY 1

Please retain product label and instructions for future reference

7

88

99

Roof
AI-04GREENROOF1218X1037-V1
QTY 3

Door
AI-04GREENDOOR550X1720-V2
QTY 1

Opening Window
AI-04GREENOW560X460-V2
QTY 1

10
Base Frame – 44x44x1864mm QTY 2 F4444-1864mm QTY 2
11
Base Frame – 44x44x1149mm QTY 4 F4444-1149mm QTY 4

12

Fascia – 12x95x1075mm QTY 4 S1295-1075mm QTY 4

13

7

Roof Support Bar – 27x44x1829mm QTY 1

F2744-1829mm (8mm LIP, X2 66DEG CUTS)

14

R7oof Support Bar – 27x44x607mm QTY 1

F2744-607mm (8mm LIP, X2 66DEG CUTS)

15 Fascia Block – 28x28x251mm QTY 4
FS2828-251mm QTY 4

16

13

Roof Trim – 12x56x607mm QTY 1

S1256-607mm QTY 1

17
Roof trim – 12x56x1829mm QTY 1
S1256-1829mm

18
Door Frame – 27x44x556mm QTY 1 F2744-556mm

19 Door strip -12x27x1717mm QTY 2
S1227-1717mm QTY 2

20
Door strip – 12x27x556mm QTY 1

S1227-556mm

P 2

21
Butterfly Hinges QTY 4 PI-07-0004
24

22

23

Window Casement Stay QTY 1 PI-07-0008

Window Glazing Bead QTY 16 PI-07-0063

25

26

Finial QTY 2 SHED DIAMOND FINIAL

Wooden Knob QTY 1 PI-04-0024

Turn Button QTY 2 PI-07-0182

27

Styrene – 985x570x2mm QTY 7
PI-05-0157

28

Styrene – 942x570x2mm QTY 13
PI-05-0151

29

Styrene – 503x570x2mm QTY 1
PI-05-0158

30
Strip – 12x95x993mm QTY 2 S1295-993mm QTY 2
31
Strip -12x56x1576mm QTY 4 S1256-1576mm QTY 4
32
Strip – 12x56x926mm QTY 2 S1256-926mm QTY 2
33
Strip – 12x56x570mm QTY 2 S1256-570mm QTY 2

Please retain product label and instructions for future reference

34
Strip -12x44x1218mm QTY 4 S1244-1218mm QTY 2
35
Strip – 12x44x993mm QTY 8 S1244-993mm QTY 8
36
Strip – 12x44x543mm QTY 1 S1244-543mm
37
Strip -12x27x1776mm QTY 1 S1227-1776mm
38
Strip – 12x27x1193mm QTY 4 S1227-1193mm QTY 4
39
Strip – 12x27x926mm QTY 16 S1227-926mm QTY 16
40
Strip – 12x27x610mm QTY 2 S1227-610mm QTY 2
41
Strip – 12x21x560mm QTY 1 S1221-560mm

42
Plastic Window Cill – 1776mm QTY 1
PI-08-0020

43
Plastic Window Cill – 1193mm QTY 4
PI-08-0019
44
Plastic Window Cill – 610mm QTY 2
PI-08-0021

Nail Bag

30mm Screw x 197 40mm Screw x 17 50mm Screw x 67 70mm Screw x 20

16mm Screws x 16 20mm Screw x 6 30mm Black Screw x 18
P 3

Step 1

Lay the base frame down as shown in the diagram. Ensure the base is square and laid on level ground, fix the base framing (No. 10) & (No. 11) together with 2 x 70mm screws per corner and 2 x 70mm screws to join the two short base frames – pre drill to avoid splitting the timber.

12 x 70mm screws.
10

Pre drill hole

70mm screw

11 11

11

10 11

Step 2
Assemble the window (No. 2 & No. 3) and door side (No. 1) panels on the floor.
Place the plastic window cills (No. 42, No. 43 & No. 44) externally onto the lip of each panel.
Lay the styrene (No. 28) on top of each opening so that it overlaps the surronding framing equally on both sides as per the diagram.

Styrene Window Cill

28

28

28

28

28

28

Styrene

Styrene

Styrene

Styrene

Styrene

Styrene

Please retain product label and instructions for future reference
Step 3
Attach the window strips (No. 37, No. 38, No. 39 & No. 40) using 3x30mm screws as per the diagram. Ensure the strips do not protude the width of the window frame.
Ensure you screw into the window strips to the side of where the styrene meets the window frame.
*Whilst attaching the strips to the small window panel (No. 3) working in pairs leave one side without a strip which will be attached one the panels have been fixed together.
69x30mm screws

Pre drill hole

30mm screw

40

40

37

39

39 39

39

39

39

39

39

Styrene

Styrene

Styrene

Styrene

Styrene

1

1

2

38

39

39

Styrene

Styrene

38

39
Styrene

39
Styrene

44

1

3

43 2

42

3

3

*Construct the above pair of small window panels twice P 4

Step 4
Fix the corners of the Window Side (No. 2) and the Small Window Side (No. 3) with 3x50mm screws as shown in the diagram.
2
The small window side sits on the outside of the window panel
3x50mm screws.

Pre drill hole

50mm screw

Rear

Side

Step 5

Fix a Small Window Side (No. 3) next to the Small Window Side and to the outside edge of the Window Side (No. 2) at the corner using 3 x 50mm screws to fix the panels together.

6x50mm screws.

3

Pre drill hole

50mm screw

Rear Side

3
Front
3
Front

Please retain product label and instructions for future reference
Step 6
Fix the remaining Small Window Panel (No. 3) in place using 3x50mm screws.
3x50mm Screws.

3

50mm

Pre drill

screw

hole

Step 7

Place both Door Sides (No. 1) inside the Small Window Sides and fix in the corner using 3x 50mm screws each.

Fix the Door frame (No. 18) to the base

frame between the Door sides. This

allows for the door sides to be correctly

spaced.

1
6x50mm Screws

3x40mm Screws.

1

Pre drill hole

40mm screw

50mm screw

18
P 5

Step 8

Fix a strip (No. 32) over the two Small

Window Panels (No. 3) and fix in place with 4x30mm screws per strip, one either

32

side of the greenhouse.

8x30mm Screws.

32

Pre drill hole

30mm screw

Step 9
Fix the gable tops (No. 4) & (No. 5) to the panels using 4x50mm screws per top as shown in the diagram.
8x50mm Screws.
5
The building can now be attached to the floor framing with 50mm screws.
24x50mm Screws.
4

Pre drill hole

50mm screw

Please retain product label and instructions for future reference

Step 10
Fix the two Door strips (No. 19) to either side of the door panels with 3x30mm screws per strip flush to the internal edge.
6x30mm Screws.
Fix the Door strip (No. 20) to the top of the door opening flush to the inside edge with 3x30mm screws.
3x30mm Screws

19 19

30mm

Pre drill

screw

hole

20

Step 11
Align the Fascia Blocks (No. 15) to the top edge of the Door Gable Top and fix in place using 2x50mm screws per block.
8x50mm Screws.

Pre drill hole

50mm screw

15

15

15 15

P 6

Step 12
Lay the roof (opening window) panel (No. 6) down and place the styrene sheets (No. 27 & No. 29) in position using the window glazing beads (No. 23) which is required to be screwed down with 2x16mm screws. Ensure the thinner edge of the frame is facing the bottom.
6
8x16mm Screws.

16mm

Pre drill

screw

hole

29

27
Styrene Styrene
23

Step 13
Fix the strips (No. 34, No. 35 & No. 36) onto the window frame using 3x30mm screws per strip.
Ensure you screw to the side of the styrene not through it.
12x30mm Screws.

Pre drill hole

30mm screw

34 35
36 35

Please retain product label and instructions for future reference

Step 14

Place the window (No. 9) into the

gap in the roof (No. 6) and secure

strip (No. 41) using 4x30mm screws

Fix 2x butterfly hinges (No. 21) to the

strip using 4x16mm screws on

the window side and 4x30mm screws on the roof strip.

41

8x16mm screws

12x30mm screws

9

Pre drill hole

16mm screw

30mm screw

30mm

21
16mm

P 7

Step 15
Repeat step 12, 13 & 14 for the three roof panel 7’s.
Do not fit strips on the inside of the roof panels which will sit next to another roof panel, see illustration.

Pre drill hole

30mm screw

34

27

27

35

35

Styrene

Styrene

23

23 23

23

34

27

35

35

Styrene

27
Styrene

34

27

27

35
Styrene

35
Styrene

23

23 23

23 23

23 23

23

Please retain product label and instructions for future reference

Step 16

Place the Roof panels (No. 6) & (No. 7) on top of each gable, making sure the roofs are flush to the Plain Gable and meet at the top of the apex* Fix the roof panels together from the inside of the greenhouse in the middle using 4x70mm screws.

Secure each roof panel to the building using 50mm screws except at the front of the greenhouse. Fix the front of the roof panels to the Fascia Blocks (No. 15).

8x70mm Screws. 16x50mm Screws.

*IMPORTANT: Ensure both roof

sections meet at the top of the

apex as shown in the illustration.

Pre drill hole

70mm screw

50mm screw

Step 17

13

Place both Roof Support Bars (No. 13 & No.14) between the roofs flush upagainst each other as shown.
14
Fix both Roof Support bars to the roof panels using 40mm screws

Screw diagonally through the support into the roof panel as shown in the diagram.

6x40mm Screws.

Pre drill hole

40mm screw

P 8

Step 18
Fix strip (No. 30) to the roofs to cover the panel joines using 4x30mm screws per strip.
8x40mm Screws.

Pre drill hole

40mm screw

30 30

Step 19
Fix the Window Casement stay (No. 22) to the opening window then align the fixings onto the window panel frame. Ensure the casement stay fits into fixings when closed before screwing them down using 6x20mm screws.
6x20mm Screws.

Pre drill hole

20mm screw

22
6x20mm screws per casement stay

Please retain product label and instructions for future reference

Step 20
Fix the door (No. 8) to the building using 16x30mm black screws per hinge (No. 21) as shown in the diagram.
16x30mm Black Screws.
Fit the turn buttons (No. 26) to the building using 2x30mm black screws.
2x30mm Black Screws.
Using a 50mm screw fit the wooden knob (No. 25) by screwing through the inside of the door into the back of the handle.
1x50mm Screw
21

8 25

Pre drill hole

50mm screw

30mm screw

26

Step 21

Fix the building to the base with 50mm screws evenly spaced as shown.

16x50mm Screws.

Pre drill hole

50mm screw

P 9

Step 22
Fix the corner trims (No. 31 & No. 33) in postion using 30mm screws.
22x30mm Screws

Pre drill hole

30mm screw

31

31
31 33

Please retain product label and instructions for future reference

Step 24

Fix the Roof trims (No. 16 & No. 17) to the top of the building and secure with 30mm screws per trim as shown.

6x30mm Screws

31

Pre drill hole

30mm screw

16 17

Step 23
Fix the Fascias (No. 12) and the finials (No. 24) to the building using 14x30mm screws as shown in the diagram.
14x30mm Screws

30mm

12

Pre drill

screw

hole

24 12

24 12
12

Step 25

It is ESSENTIAL that you apply wood treatment immediately after the building
has been assembled.

AFTER TREATMENT: score around protective
cover on glazing and carefully peel covering back

P 10

Step 26
It is ESSENTIAL to seal around all window framing with silicone sealant (not included) to minimize water ingress.
*Please note: This image is for illustrative purpose and may differ from your product (in regards to the number of windows) however the principle is the same.

SISLEICAOLANNET

Please retain product label and instructions for future reference

P 11

4 1 2
3

1

2

REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY

PLEASE SCAN HERE:

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals