wallbox Commander 2s Electric Vehicle Charging Station Installation Guide
- June 9, 2024
- wallbox
Table of Contents
- wallbox Commander 2s Electric Vehicle Charging Station Installation
- Commander 2s: Digital Installation Guide
- Technical Specifications
- Electrical Specifications
- Safety Warnings
- Tools and Mounting Parts
- Drilling
- Lower Connection
- Rear Connection
- Electrical Wiring
- Connection
- Closing the Charger
- Registering the Charger
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
wallbox Commander 2s Electric Vehicle Charging Station Installation
Commander 2s: Digital Installation Guide
support.wallbox.com/en/knowledge-base/c2s-dig
Technical Specifications
General Specifications
-
Colour
White/Black -
Cable Length
5 m (7 m optional) -
Charging Mode (IEC 61851-1)
Mode 3 -
Dimensions without cable
221x152x115 mm -
Weight without cable
2.4 kg -
Operating Temperature
-25 ºC to 40 ºC (50ºC with derating) -
Storage Temperature
-40 ºC to 70ºC -
Standards
CE mark (LVD 2014/35/EU, EMCD 2014/30/EU) -
IEC 61851-1, IEC 61851-21-2 TR25 certificate
(Singapore), IEC 62196-2
Electrical Specifications
-
Cable Section
up to 5 x 10 mm² -
Rated Frequency
50 Hz / 60 Hz -
Configurable Current
from 6 A to the rated current -
Protection Rating
IP54 / IK10 -
Overvoltage Category
CAT III -
Residual Current Detection
DC 6mA -
External RCCB is required per local regulations.
Type A or Type B -
Protection against electric shock.
CLASS I
Safety Warnings
- Flying debris, risk of eye injury
- Risk of electric shock.
- Disconnect and wait 10 mins
- Caution
- Sharp element, risk of injurious cuts
- Ground earth connection required
- Special waste treatment
Tools and Mounting Parts
Required tools
- Hammer
- Electric Drill 8 mm bits
- Spirit Level
- Phillips Screwdriver
- Cutting Pliers
- Torx T9
- Measuring Tape
- Utility Knife
- Pencil
- ø6 x 50 mm screws
- ø5 x 40 mm screws
- ø8 x 40 mm wall anchors
- 1-exit M25 grommet
- 3-exit M25 grommet
- Protective cap
- Opening tool
- ø3 x 6 mm screws
Drilling
Using the drilling template provided, mark three drilling points, then use the drill to complete the procedure and insert the wall anchors.
WARNING:
Do not fix the charger to the wall if you opt for a rear connection. Check
section 7 for details on how to fix the charger on the wall in case of a rear
connection.
Lower Connection
WARNING
Both lower and rear connections are possible when installing Commander 2.
Pay attention to the instructions below if you intend to install the product
using the bottom hole. For the rear connection, refer to section 6.
Fix the charger to the wall by inserting the screws and the protective caps.
Once the charger is fixed to the wall, make an incision on the grommet and
pass the supply cable through it.
Rear Connection
Remove the knock-out on the back of the charger and insert the 1-exit grommet.
With a utility knife, make an incision on the grommet and pass the cable
through it.
Fix the charger on the wall using the appropriate screws.
WARNING
Visit the EMS Installation Guide to discover which features are supported
by Commander 2.
Electrical Wiring
Plug Holder
Place the plug holder on the wall and mark the fixing points. Then, drill
holes correspondingly with the fixing points and insert the anchors.
Fix the device to the wall by tightening the screws.
Connection
There are two connection options when it comes to Commander 2. The charger can
be connected through Ethernet or using the 4G dongle.
Ethernet connection
To connect the charger with the ethernet cable, remove the knock-out next to
the power supply input and insert the 3-exit M25 grommet.
Make an incision in the rubber plug and insert the ethernet cable without the
RJ45 connector. Ensure the cable is not too tight and has some clack to
facilitate reopening the cover for possible maintenance or servicing. Crimp
the RJ45 connector to the cable and connect the cable to the ethernet port in
the charger.
4G Connectivity
The 4G connectivity is an optional feature that requires an extra accessory.
Refer to the Mobile Connectivity Installation Guide available at
https://support.wallbox.com. Contact your sales agent for more details.
Closing the Charger
Attach the open end of the communications cable to the connector on the cover.
Position the current selector to the appropriate setting according to the
electrical installation.
Position the top clip points of the cover on the charger body. Clip the
lateral clips to the charger body first and then the bottom clips.
Insert and tighten the Torx screw in the bottom of the charger to secure the
front cover.
WARNING:
Recommended tightening torque 0.7 Nm +/- 10%
Registering the Charger
Find the Serial Number (SN) and the UID of your charger.
Download the myWallbox App and register. Then add your charger by introducing
the information requested.
Updated on 30/11/2022
Was this article helpful?
Yes No
References
- Commander 2s: Digital Installation Guide - Wallbox Academy
- Home - Wallbox Help Center
- Accessories - Wallbox Academy
- Commander 2s: Digital Installation Guide - Wallbox Academy
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>