- TOOLS
- Pre-Installation
- ACCLIMATION AND IN-SERVICE CONDITIONS
- CONCRETE SUBFLOOR REQUIREMENTS
- LIGHTWEIGHT CONCRETE
- STORAGE AND CONDITIONS
- NEW CONSTRUCTION OR REMODEL
- RADIANT-HEATED SUBFLOOR
- Preparing for Installation
- Floating Installation
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
HOME DECORATORS COLLECTION HL271H Strand Woven Harvest Engineered Click
Bamboo Flooring
TOOLS
- Tape measure
- Moisture meter (wood, concrete or both).
- Chalk line & chalk Hammer
- Electric power saw
- Carbide-tipped saw blade for fine cut
- NIOSH-designated dust mask
- Hand saw or jamb saw
- Eye protection
- Straight edge or Spacers
- Pry Bar
- Mallet
- Broom
- Color-matched wood putty
- Tapping block
- Paul bar
- Additional Supplies for Glue-Down Method
- Flooring adhesive Trowels
- Adhesive remover for selected
- Adhesive Clean rags
- Weight roller
- Painters tape
Safety and Health Precautions
Power tools can be dangerous. Operate in strict accordance to the manufacturer’s operating instructions and safety precautions. Unsafe and improper use can cause serious injuries. Avoid inhalation and exposure to wood dust by mechanical means and by wearing personal protective equipment. Wear appropriate personal protective equipment (PPE) which includes NIOSH or OSHA approved dust masks, safety goggles and work gloves
Pre-Installation
OWNER/INSTALLER RESPONSIBILITY
The owner is advised to be at home during the installation for consultation/direction. The owner and installer should discuss installation and layout to maximize satistaction. if this IS not possible, consultation should be done prior to installation. Installers should be familiar with installation guidelines from National Wood Flooring Association (woodfloors.org). The owner/installer assumes all responsibility for the product quality of completed installation. PERFORM PRE-INSTALL INSPECTION. FOR CLAIMS PURPOSES, YOU ARE ALLOWED TO OPEN UP TO 4 BOXES FOR PRODUCT INSPECTION. D0 NOT OPEN ALL THE BOXES. OPENING ALL THE BOXES CONSTITUTES YOUR ACCEPTANCE OF THE PRODUCT. INSPECT ALL THE PLANKS IN THESE 4 BOXES CAREFULLY. EXAMINE FLOORING FOR COLOR, FINISH, AND QUALITY. IF YU DISCOVERS THAT PRODUCTS ARE DEFECTIVE, OR IF THE MATERIAL IS QUESTIONABLE, YOU SHOULD CONTACT THE RETAILER. IF YOU ARE SATISFIED, PROCEED WITH INSTALLATION. Prior to installation, rack up planks from several boxes to ensure uniform distribution of colors, shades and characters in the installed flooring. Planks having similar widths should be placed together in the same row to minimize gaps between boards. Bamboo floors are natural products containing natural variations in color, tone, grain, streaks, nodal marks, and other characteristics. They are normal and it does not mean the product is defective. Purchase flooring to be installed in one large area at the same time. Products purchased at a later time than the first purchase may vary beyond your expectations. Accessories, trims, and moldings are manufactured to coordinate with the varied appearances of the floor planks. Any exact matches are coincidental. Non-matching accessories are not defective products. This product is manufactured according to strict quality standards. In the event that defects are discovered in the field, the industry standards permit a defect tolerance not to exceed 5%. An additional 5% (10% for diagonal installations) should be factored in for cutting wastage and grading allowances. During installation, inspect the planks continuously. Defects that can be seen from a standing position should be Cut off or held out. Installing defective planks implies acceptance. Squeaking and clicking noises are the result of interactions among flooring, joists and Subfloors when they move. Limiting the movements of the flooring system usually eliminates most of these noises. Sometimes, it is impossible to eliminate them completely and minor squeaking or clicking noises are to be accepted as normal flooring phenomena. Minor scratches can generally be repaired with the use of putty, stain or filler. It is an industry-standard practice of flooring installation and it should be accepted as normal by the homeowner To assure the warranty is not inadvertently voided, before proceeding with any activity that is not covered in this manual, please contact our Customer Support Team at 800-986-3460.
ACCLIMATION AND IN-SERVICE CONDITIONS
Acclimation is the process of adjusting (conditioning) the moisture content of bamboo flooring to the environment in which it is expected to perform. The bamboo flooring is fully acclimated when its moisture content and dimensions (width and length) are stable. For example, the averaged dimensions and moisture content remain constant for 3 consecutive days. Honoring must acclimate for as long as necessary to reach the fully acclimated stage. Acclimation time varies depending on geographical area, interior Climate control and time of the year. The minimum acclimation time is 72 hours. Open the box and plastic wrap it. Elevate cartons from the floor by placing them on 2×2 in. lumber or equivalent. Place spacers (3/4 in. to 1 in. sticks) between each layer or cross-stack the layers tor maximum exposure to ambient conditions. ACClimation temperature range is 60°F-80°F and relative humidity (RH) of 35%-55%. Conditions in which the floor was acclimated should be maintained continuously thereafter.
CONCRETE SUBFLOOR REQUIREMENTS
Concrete subfloors must:
- Have minimum rated strength of 3000 psi.
- Be level to within 1/8 in. in a 6 ft. span or 3/16 in. in a 10 ft. span; no bumps or low spots. High spots can be removed by grinding; depressions can be filled with patching compound formulated for use in floor installation.
- Be clean; no construction debris, soil, mud, and any other Objects on or adhering to the floor; if necessary, scrape and sweep away before the installation; no protrusions of nails, debris, metals should remain.
- New concrete slab must cure for at least 60 days. It must have a minimum 10 mil polyethylene sheet between the ground and the concrete.
- Be free from moisture-related conditions which can damage the installed flooring.
CONCRETE MOISTURE
- Test all concrete subfloors for moisture content and document the results. Visual checks are not reliable.
- Perform tests at locations around exterior doorways, near walls containing plumbing, near foundation walls and in the center of the room. Minimum sample size is 3 samples per 1000 sq. ft. of area and one test for every additional 1000 sq. ft. thereafter.
- Moisture content should meet one of the following criteria:
- 4.5% when tested using Tramex Concrete Moisture Encounter.
- Less than 3 pounds per 1000 sq. ft. per 24 hours when using the Calcium Chloride test (ASTM F 1869).
- 75% when using Relative Humidity Testing (ASTM F-2170).
LIGHTWEIGHT CONCRETE
Lightweight concrete is concrete with a rated strength that is less than 3000 psi. Perform a quick check by drawing a nail across the top; if it leaves an indentation, it is probably light concrete. For glue-down applications, the concrete must possess shear strength greater than the glue. If concrete-rated psi IS unknown, contact the adhesive manutacturer for guidance.
- The subfloor must be clean; no presence of construction debris, soil, mud and any other objects on or adhering to the floor; no protrusions of nails, debris, or metals should remain. If necessary, scrape and
- Sweep the subfloor before the installation.
- The subfloor must be structurally sound and stable; no movements or squeaks; no loose panels or loose nails; no signs of ply de-lamination or other damages. Repair all shortcomings before installation.
- The subfi0or must be flat; no visible bumps or low spots; the subfloor should be flat to within 1/8 in. in 6 ft. span or 3/16 in. in 10 ft. Test for moisture using a reliable moisture meter. Perform tests at locations around exterior doorways, near foundation walls, near walls containing plumbing lines and in the center of the room. Measure 20 locations per 1000 sq. ft. Moisture content of the subfloor should be less than 12%.
- Moisture content difference between the subfloor and flooring should be 2% or less.
- On truss/joist spacing of 16 in. (406 mm) O/C or less, the industry standard for single-panel subflooring is a minimum 5/8 in. (19/32 in., 15.1 mm) CD Exposure 1 plywood subfloor panels (CD Exposure 1) or 23/32 in. 0SB
- Exposure 1 Subfloor panels, 4 ft. x 8 ft. sheets. Expansion gap between panels should be 1/8 in. (3 mm). if panels are not tongued and grooved and there is not sufficient spacing or is inadequate, cut in the required spacing with a circular saw. Do not cut in expansion space on tongue and groove panels.
PARTICLE BOARD OR FIBERBOARD
Only for floating installation.
EXISTING FLOORS
Installation over the existing floor requires the installer to consider
potential issues related to moisture damage, adhesive failure and fastener
failure. Contact the adhesive and fastener manufacturers respectively for
their specific instructions, recommendations and requirements. Acceptable
floor coverings include: solid hardwood, linoleum, terrazzo, ceramic tile and
other “moisture-sealing floors.” Unacceptable floor coverings include: carpet,
needle punch felt, edge glued linoleum and other “moisture absorbing
flooring.”
JOB SITE CONDITION
Prior to installation, the installer must ensure that at the time of
installation, the job site conditions including Subtioor/substrate, ambient
temperature, and relative humidity, and all impacting varables will not
negatively affect the filoor. The manufacturer will decline responsibility for
damages associated with improper installation or poor site conditions.
STORAGE AND CONDITIONS
DO not store flooring in uncontrolled environmental conditions. For example, garages and exterior patios are not acceptable areas to store flooring. Handle and unload bamboo flooring with care and store within the environmentally controlled site in which it is expected to perform. Flooring stored on a concrete slab should be elevated at least 4 in. to allow air circulation under cartons.
EXISTING HOME
An existing home should have a consistent room temperature of 60° F-80°F and
relative humidity (RH) of 35%- 55%. Continual deviation from these conditions
will affect the dimensions of flooring, especially bamboo. When using a heater
during winter months, humidity may be much lower than the acceptable range. A
humidifier is recommended to prevet excess shrinkage in bamboo flooring due to
low humidity levels. During the warmer months, maintain humidity levels using
an air conditioner, or dehumidifier, or by turning on your heating system
periodically.
NEW CONSTRUCTION OR REMODEL
All work involving water, such as pouring basement concrete floors, drywall and plasterwork, plumbing, etc. must be completed well in advance of the floor delivery. Ensure that the building is enclosed. Where building codes allow, permanent heating and/or air conditioning systems should be operating at least five days preceding installation and should be maintained during and after installation. If it is not possible for he permanent heating and/or air conditioning system to be operating before, during and after instalation, a temporary heating and/or dehumidification system that simulates normal living (occupied) conditions can enable the installation to proceed until the permanent heating and/or air conditioning system is fully operational. Your job site should have a consistent temperature of 60°F-80°F and relative humidity (RH) of 35%- 55% which should be maintained continuously thereafter.
BASEMENTS AND CRAWL SPACES
The concrete slab or ground must be dry. The ground in the crawl spaces must
be completely covered using 6 mil black polyethylene. Crawl space clearance
between the earth and underside of joists should be no less than 18 in. and
the perimeter vent area should be equal to 1.5% of the total square footage of
the crawl space or as mandated by code.
RADIANT-HEATED SUBFLOOR
This product can be installed over a radiant-heated subfloor. Operating surface temperature must be less than 84°F: Decrease temperature before installation. Increase temperature gradually after installation. Glue down installation may require additional installation requirements. Contact the glue manufacturer for specific recommendations. contact the heater manutacturer for specific installation instructions.
MOISTURE BARRIER AND MOISTURE RETARDER CONCRETE SUBFLOOR
For floating installation, use 6 mil polyethylene film or other means with
equivalent permeability. Overlap the edge seams and tape it together. Extend
moisture barrier up to the wall about 1 in. high. For direct glue
installation, use a moisture barrier if moisture levels exceed the requirement
(see Concrete Moisture section).
WOOD SUBFLOOR
Use asphalt-saturated kraft paper or #15 or #30 felt that meets ASTM Standard
D4869 or UU-B-790, Grade D. Overlap along the edge seams 2 in.- 4 in. wide.
This retards moisture movement from below. Extend the moisture retarder to
about 1 in. from the walls. Secure to the subfloor as necessary.
SOUND CONTROL UNDERLAYMENT
Check with the sound control manufacturer for application guidelines.
Generally, the less compressive underlayment is preferred.
EXPANSION GAP 1/2 in. expansion gap is required around the perimeter of the floor and between the floor and all vertical obstructions. Do not place permanently mounted structures such as kitchen counters/cabinets on the installed floor.
TRANSITION MOLDING Floating installation, transition T-molding is required in the following cases: floor spanning greater than 35 ft. in length or width; wall openings with or without a door.
Helpful Pointers
Make sure your work area is well-lit. Good visibility ensures that color is
consistent and that visually defective planks are detected and removed. The
minimum length of the first and last plank is 12 in. If the last plank will be
less than 12 in., adjust the length of the first plank. The remainder of the
last plank can be used as a starter board on the following rows. Using a
shorter piece at undercut door jams will help when fitting flooring in place.
CUTTING THE LAST ROW TO THE WIDTH
Most often the entire length of the last row will need to be cut so that it is
narrow enough to fit the remaining space. Measure the distance between the
floor’s face edge (exclude the tongue) to the wall. Subtract 1/2 in. from this
measurement for the expansion gap. Draw a line. Cut through the line. Discard
the excess piece. Proceed with the
installation
Preparing for Installation
- Ensure subfloors are clean.
- Understand the locking part of the flooring plank. The tongue is the thinner extension coming out of the side of the planks.
- The groove is the wider extension coming out of the other side of the floor plank. The ends do not have a tongue and groove.
- There is an upper drop-lock end on one side and a lower drop lock end on the other side.
- Lay out several cartons. Randomly rack planks to ensure good color and shade mixture and end joint spacing.
- The minimum end stagger is 6 in. Inspect plank quality and grading.
- Lay out trim moldings in advance and find planks whose shade closely matches. Set these aside for future use.
- Remove the existing base, shoe molding or threshold carefully. They can be used to cover the 1/2 in. expansion gap left around the edge of the room.
- Undercut doors and casings using a handsaw laid flat on a piece or Scrap Touring.
- Install the underlayment (if used) according to the underlayment manufacturer’s instructions.
Floating Installation
INSTALLING THE FIRST ROW
- When possible, begin installation from the straightest wall.
- If possible, install the floor perpendicular to the floor joists.
- Cut off the tongue from the first row planks.
- Allow a 1/2 in. expansion gap between the plank and the walls. Use spacers or board.
- Place the first plank with the groove sides facing away from the walls.
- Place the upper drop-lock end of the second plank on the lower drop-lock end of the first plank.
- The ends do not click lock. Maintain a straight edge along the rows.
- Continue placing the succeeding planks to complete the row until you come to the last plank.
Warranty
This flooring product comes with a manufacturer’s Limited Wear Warranty. The warranty applies to the original purchaser of the flooring. it warrants the original purchaser that the finish surface ill not wear through for the duration of the stated warranty from the date of purchase. Contact our Customer Service Team at 800-986-3460 to request a written copy that provides detailed terms of coverage and limitations.
References
- Home Decorators Collection - Home Decor - The Home Depot
- Home - RFCI | Resilient Floor Covering Institute
- P65Warnings.ca.gov
- P65Warnings.ca.gov/wood
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>