ACCUREX 485926 24 Baso Pilot with Micro User Guide

June 3, 2024
ACCUREX

ACCUREX logo 485926 24 Baso Pilot with Micro
User Guide

Document 485926 24 Baso Pilot with Micro

Quick Start Guide
Direct Gas Make-Up Air Quick Start Guide – 24 Baso Pilot with Micro
This quick start document is intended to help with getting the initial unit startup completed, but does not replace the IOM. Please read the IOM for all safety information and precautions before performing any work on the equipment. Complete pre-start checks and blower start-up prior to this procedure.
Pre-Start Information : Locate wiring diagram on the inside of control center door (field-wired connections are indicated by dashed lines on diagram):

  1. Enable the unit
    a. Connect terminals R to G on unit terminal strip.
    b. On initial power up, navigate to UNIT ENABLE and set the unit to ENABLED.
    c. Verify blower rotation is correct.
    To reverse the rotation on three phase units, disconnect and lock out power, then interchange any two power leads going to the motor.

  2. Determine Unit Airflow Configuration -Constant volume (CV), Variable Volume (VAV), Recirculating (RECIRC). Scan IOM QR code on document for further explanation of airflow configurations, if needed.
    a. Navigate to the CTRL VARIABLES > ADVANCED> LOGIN and enter password 1000. After pressing enter, this will return you to the Advanced menu.
    b. Scroll down to the MANUAL OVERRIDES and press enter. Check enable overrides box. Scroll down to supply fan and change to manual 100%, press enter.
    c. Check motor amp draw and compare to motor nameplate FLA ­ reduce fan speed if amp draw is greater than FLA.

  3. Check burner pressure differential (Fig. 1)
    a. Connect manometer to outer sensing probes (Fig. 1)
    b. See Fig 2 for acceptable pressure differential for each gas type and unit configuration
    c. Adjustment (if needed) – Test and balance should be completed prior to unit startup. If T&B has not been completed, fan speed should be adjusted to achieve desired pressure differential. To increase pressure differential, increase fan speed. To decrease differential, decrease fan speed. If pressure differential can’t be achieved through fan speed adjustment, reference IOM for further setup instructions. (Scan QR code on top).

Pressure Differential

| NG| LP
Constant Volume| .6 – .7| .8 – .9
Variable Volume| .5 – .8| .7- 1.0
Recirculation| .5 – .8| .7 – 1.0

Fig. 2 (Values shown as in. wg)

  1. Verify Inlet gas pressure
    a. Inlet gas pressure needs to be equal to or greater than the “minimum for maximum output”, but not to exceed the “maximum gas pressure” listed on the unit gas pressure label.

  2. Perform Heating Start-up
    a. To enable the heating, navigate to the Ctrl Variables > Advanced > Manual Overrides > DG Burner and set override to manual and command to on to enable heating. b. LP only: Connect digital manometer to pilot test port. Zero manometer with fan energized. Adjust pilot pressure to .5 in. wg.
    c. Check pilot flame signal by closing main hand valve. Set meter to µA DC scale and locate flame signal terminals on Baso ignition control. (Fig 3) Recommended flame sense current of .1 ­ 1.0 µA DC

  3. High/Low Fire Set-up
    a. Locate gas label on exterior of unit and determine design temp rise.
    b. High Fire – Increase DG Burner demand to 100%. Use outside air and supply air temperatures shown on override menu to determine temperature rise (Temp Rise = Supply Air ­ Outside Air). Adjust gas valve to achieve design temperature rise (Fig 4).
    c. Minimum Fire ­ Set DG Burner demand to 0%. View burner flame through factory sight glass. Adjust minimum firing rate (Fig 4) to achieve desired minimum temperature rise while maintaining a small ribbon of continuous blue flame across the burner. Typical setting = ¼ – ½ turn open.
    d. Cycle the call for heat to make sure the burner can light at this low fire setting.

  4. Cycle unit power off and back on to remove any overrides.

24 Baso Pilot with Micro Quick Start Guide, Rev. 1, September 2022

Installation, Operation and Maintenance Manual.| Direct Gas-Fired Start-Up Video
---|---
https://accurex-cms-prod.azureedge.net/accurex-cms-prod/docs/default- source/ioms/482887_xdg_xdgx_iom.pdf?sfvrsn=f0e70e2e_27| https://www.youtube.com/watch?v=sZSJyuNsRhA

ACCUREX logo

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals