ARP 107-1002 Mitsubishi 4G63 Cam Sprocket Bolt Installation Guide

June 3, 2024
ARP

107-1002 Mitsubishi 4G63 Cam Sprocket Bolt
Installation Guide

107-1002 Mitsubishi 4G63 Cam Sprocket Bolt

Application: MITSUBISHI 4G63 CAM SPROCKET BOLT

Installation Procedure

  1. Clean and inspect all hardware prior to installation. Look for obvious defects or shipping damages. Please call 805-339-2200 with any questions or issues.
  2. To ensure proper engagement and accurate torque readings, clean the female threads.
  3. Lubricate the bolt threads and underside of the bolt head with ARP Ultra-Torque Fastener Assembly Lubricant. 4. While keeping the camshaft from rotating, torque the bolts to:

65 ft-lbs

If you have any questions or need additional information please contact us at 805-339-2200 or by FAX at 805-650-0742

Automotive Racing Products
1863 Eastman Ave. Ventura, Ca 93003
www.arp-bolts.com

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals