SWEBAD VASTERVIK 150 Massage Bathtub Owner’s Manual
- June 3, 2024
- SWEBAD
Table of Contents
SWEBAD VASTERVIK 150 Massage Bathtub
INSTALLATIONS GUIDE
- Length of the power cable min.
- The thickness of the cable and the number of cores depends on the performance of the device and should meet the local requirements. Connections must be made by an authorized electrician.
- Closable cold and hot water input G ½.
- Sewage opening D = 50 mm
ELECTRIC SPECIFICATION
All electrical connections related to the installation of the product must be
executed by a certified professional electrician. At connecting, all local
regulations must be observed as well as the permissible load on one phase. To
achieve local auxiliary equipotential bonding, make sure you connect all
conductive objects in the same room with the earthing terminal of the
product’s aluminum frame: The cross-section of the copper earth continuity
connector must be a minimum of 2.5 sq mm. The power circuit of the product
must be protected with a residual current circuit breaker with a 30mA
threshold and a circuit breaker the operating current of which is leveled with
the consumed current of the product. The product is connected to the
electrical power line as a stationary device, with no plug connector. The
length of the power line should allow moving the product away from walls if
necessary. Options for connecting to the power network according to local
opportunities are given on the diagrams below.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>