DOWELL ADA Wall Mounted Vanity Kit Installation Guide
- September 26, 2024
- DoWell
Table of Contents
DOWELL ADA Wall Mounted Vanity Kit
Installation Guide
Wall Cabinet Installation
Locate at least 2 wall studs.
Use at least 4 wall anchors when installing a 24″ and 30″ cabinet. Use at
least 6 wall anchors when installing a 36″ and 48″ cabinet.
Re-Installation – Tools Required
- Drill
- Measuring tape
- Screwdriver
- Silicone
- Pencil
Hinge/Door Adjustment (If Applicable)
The door alignment was set in the factory, but it could have shifted during
transit. If adjustment is needed, follow the instructions provided in the
chart below.
Specifications
Cabinet Size | Wall Anchors Required |
---|---|
24″ | 4 |
30″ | 4 |
36″ | 6 |
48″ | 6 |
FAQ
-
Q: How many wall anchors are needed for a 24″ cabinet?
A: At least 4 wall anchors are needed for a 24″ cabinet. -
Q: What tools are required for re-installation?
A: You will need a drill, measuring tape, screwdriver, silicone, and a pencil. -
Q: What should I do if the door alignment is off?
A: Follow the instructions provided in the hinge/door adjustment section to realign the doors.
safety
WALL CABINET INSTALLATION
- STEP 1:SELECT HARDWARE THAT IS BEST SUITED FOR YOUR WALL TYPE
IMPORTANT:USE “PAN HEAD” OR “ROUND HEAD” SCREWS WITH SEAT WASHERS.SEAT SCREWS TIGHTLY AGAINST BACK RAIL OR PANEL WITHOUT DRIVING INTO BACK RAIL OR PANEL MATERIAL.
TOOLS REQUIRED
WARNING : THE INSTALLATION METHOD OF FLOATING VANITY HAS A BIG RELATION WITH THE WALL STRUCTURE.
ADJUSTMENT (IF APPLICABLE)
The door alignment was set in the factory, but it could have shifted during
transit. If adjustment is needed, follow the instructions provided in chart
below.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>