Kinse Solar 202407 Solar PV Flexible Modules User Manual

September 14, 2024
Kinse Solar

Kinse Solar 202407 Solar PV Flexible Modules

Specifications

  • Product: Kinse Solar PV Flexible Modules
  • Compliance: IEC 61215 and IEC 61730 standards, Class A rating
  • Application: Systems larger than 50V or 235W DC

Product Usage Instructions

The nameplate on the module provides important details such as product type, dimensions, maximum power, operating current, operating voltage, open circuit voltage, short circuit current, certification marks, and maximum system voltage under standard test conditions.

  • Ensure compliance with local regulations and national/international electrical standards during installation.
  • Avoid installation in adverse weather conditions like rain, snow, or strong winds to prevent safety risks such as water immersion into connectors.
  • Do not open the original package until ready for installation.
  • Use proper lifting techniques during transportation to prevent damage.
  • Maintain good packaging to prevent moisture and breakage.
  • Store in a well-ventilated, rainproof, and dry location.
  • Verify packaging is intact before unpacking.
  • If modules are damaged, contact the company for complaint procedures.
  • Follow the unpacking procedure provided in the manual.
  • Do not modify the modules in any way that may affect performance or safety.

FAQ

  • Q: Can the modules be installed in rainy conditions?
  • A: No, it is advised not to install the modules in rainy conditions to avoid potential safety risks.
  • Q: What standards are the Kinse flexible modules compliant with?
  • A: The modules are compliant with IEC 61215 and IEC 61730 standards with a Class A rating.

KINSE SOLAR

  • For professional use only version:202407

Introduction

  • Thank you for choosing Kinse Solar as your PV module provider.
  • This manual contains important information about the safety, installation, and maintenance of the modules.
  • This manual does not have any warranty significance.
  • It does not stipulate a compensation scheme for any loss, damage, or other expenses caused by or generated during module installation, operation, or maintenance.
  • Kinse Solar PV Modules shall not be liable for any infringement of patent rights or rights of third parties caused by the use of modules.
  • Kinse Solar reserves the right to change the product specification and this manual without prior notice.
  • The installation personnel must read and understand this guide before installation.
  • The installation personnel must follow all safety precautions, local requirements, and laws or regulations of authorized authorities described in this guide.
  • Kinse Solar shall not be responsible for injuries, losses, or expenses arising from non-compliance with this manual, from or in connection with the products of other manufacturers.
  • Please provide this manual to PV system owners for their reference and inform them of all safety, operation, and maintenance requirements and recommendations.
  • The installation manual is available in different languages. In case of any conflict, the Chinese version prevails.

Laws and Regulations

  • The mechanical and electrical installation of PV systems should be performed under all applicable codes, including electrical codes, building codes, and electric utility interconnect requirements.
  • That regulation may vary for mounting location and requirements may also vary with system voltage, and DC or AC application.
  • Contact local authorities for detailed governing regulations, and make a point of getting confirmation and relevant permission.

Module Information

Module Section Structure Diagram

Nameplate Information

  • The nameplate describes the product type, dimension, maximum power, optimum operating current, optimum operating voltage, open circuit voltage, short circuit current, certification mark maximum system voltage, etc. under standard test conditions.

Safety

  • Kinse’s flexible modules are compliant with IEC 61215 and IEC 61730 standards and the application rating is class A.
  • The modules can be used for systems that may be exposed to the public and are larger than 50V or 235W DC.
  • The modules passed the two parts of IEC 61730-1 and IEC 61730-2 and met the safety Class Ⅱ requirements.
  • All installation work must comply with local and local regulations and corresponding national or international electrical standards.
  • Do not install in rainy days, strong winds, rain, or snow.
  • To avoid potential safety risks, such as water immersion into the connector, etc.

Transportation & Storage Safety 

  • Do not open the original package during transportation and storage until they are ready to be installed;
  • Use lifting to uploading and downloading for package, refer to standard operation to prevent fail and other risks;
  • Use sensible lifting tools and allow a maximum of 1 pallet to be lifted at a time and a maximum of 2 layers to be stacked.
  • Keep good packaging, Prevents moisture and breakage. Keep in a well-ventilated, rainproof and dry place anytime;
  • The unloading ground must be smooth and free from inclination;
  • Note same power level products in same area when unloading, keep around 30cm distance between two stacks.

Packing & Operation Safety
Verify no packaging is damaged before unpacking. If the modules are damaged, contact the company from which you purchased the modules so that you can obtain the information to raise a complaint for defective modules.

  • Unpacking procedure, first save the side documents effectively, then cut the cable ties, remove the top cover and long cardboard
  • When unpacking, if lifting is required, do not cut the cable ties that are separately packed for the upper and lower pallets, so that the crane can lift the upper and lower pallets separately.
  • Module stacking ground should be flat, to prevent breakage due to hard objects scratching;
  • Ensure surface is clean, use soft cloth to wipe if dirty before installation;
  • Do not exceed 6pcs modules for a single handling and stacking, refer to the below photo;
  • Do not hand grasp junction box or picked up the wire to move modules;
  • Do not stand, climb, walk or jump on modules;
  • Do not use rope to carry the module as a transfer method;
  • Do not touch with hard objects, sharp objects contact, impact, pressure;
  • Do not paint on the surface, add label or tear down label or nameplate;
  • Do not install the scratches, damaged or other faulty module;
  • Do not drilling extra hole on panels within installation process, unless confirmed accepted by Kinse professionals in advance.
  • Do not disassemble or modify the modules in any way that may affect the performance and safety of the modules or even cause irreparable damage and void applicable warranty;
  • In all cases the installation manual must be followed.

Disassembly and handling diagram

Electrical Safety
The module will generate direct current in the light environment when there is no connected or external circuit. So it will cause shock or burns when the non-protected touch the modules, 30V or higher DC voltage can be fatal.

  • Use insulation tools and wear rubber gloves to operating modules in sunshine;

  • Note no on/off switch on module, stop work only carry out to moving modules away sunlight area or shielding modules surface with cloth, cardboard, opaque material, or reverse module on a smooth, flat surface;

  • Note the wrong connection may happen in arcs and electrical shock;

  • Note to keep connectors dry and clean, ensure it in proper working condition;

  • Note the snow and water will reflect light and then increase light intensity to improve current and output power.

  • Note the voltage and power of the modules also increase at low temperatures.

  • Do not disconnect electrical connections under load to avoid arcs and electrical shock;

  • Do not insert any objects into the connector, or make wrong electrical connections;

  • Do not touch the fall off junction box or other damaged module unless it disconnected in advance and you are wearing proper PPE;

  • Do not touch damp modules under power running condition. According with this manual requirement for modules cleaning guide when need clean up.

  • Do not touch damp connector without wearing PPE or rubber glove.

  • Consult your local authority laws and regulations before installation work,comply with the building fire protection requirements. Pay attention the modules are generating equipment and may affect the fire safety of the building.

  • Note the wrong installation method or faulty modules may produce electric arcs which have potential fire risk accidents.

  • Do not install in the vicinity of flammable liquids, gases, or dangerous materials. If exposed flammable gas occurs in the vicinity of the modules after installation, please stop using the modules;

  • In the event of a fire, modules may continue to generate dangerous DC voltage even if they are disconnected from the inverter, partially module damaged or full damaged, broken system cables or even destroyed;

  • In case of fire, the firemen should be informed of the special danger of the modules and should stay away from the photovoltaic system during and after the fire until appropriate measures are taken to ensure the safety of the photovoltaic system.

Installation

Installation Conditions
Classic flexible PV modules installed in a suitable building or other suitable installation locations (e.g.floor, roof). Preferably face south when installed in the Northern Hemisphere and north when installed in the Southern Hemisphere.

  • Note the installation site or surface no aging, damage, dirt, rust, and the connection is firmly fixed. Need repair, replace, cleanup, and rectify the installation conditions if can’t meet installation to ensure long-term effectively.
  • Note the installation area no shelter, such as trees, poles, billboards, etc., the module power will significantly reduce and impact system performance once the surface are blocked;
  • Note to install the lightning protection device to prevent damage on where have higher frequency of the lightning activity;
  • Note to keep a certain height or angle condition to prevent long-term damage in rainy days. At the same time, the dip angle can wash the surface in rainy days to reducing the frequency of maintenance and cleaning;
  • Installed in operating temperature ranges from -40 ° C to 85 ° C environment;
  • If install in a special environment, consult the technical support personnel in advance (for example, the altitude is higher than 2000 m). If you do not comply with the above precautions, the warranty will be invalid.
  • Do not install in places with strong corrosive substances such as active chemical vapors, acid rain, sea water or other corrosive substances;
  • Do not near an open flame or flammable object;
  • Do not install in the long-term socking in water or immersion in water (pure water or salt water) environment (such as fountains, spray, etc.);
  • Do not install in frequent hail, year-round snow, perennial wind sand, smoke, air pollution, soot and so on, security or performance will affect. If installation is required, the installation plan should be evaluated by the Sunport technician.
  • Do not mirror or magnifying glass focusing light directly into the surface;
  • Do not install modules in windy, rainy, snowy weather to prevent accidents;

Installation Methods
Flexible PV modules can be installed in different ways according to different installation environments, including direct adhesive installation, support and fixture auxiliary installation, removable fixture installation, and replacement module installation.

  • Flat roof, curved surface or trapezoidal color steel tile can be directly used adhesive installation method;
  • For uneven installation scenarios, such as Angular or vertical edge-locked color steel tile additional support system is required for installation;
  • The customized module installation method is subject to the technical evaluation method.

Common installation tools for flexible modules

  • Guide rail or aluminum strip width is recommended 20 ~ 50mm, thickness is recommended 1 ~ 2mm, the material is recommended aluminum alloy 6063 or equivalent material high corrosion resistance, not easy to deformation.
  • PVC /TPO/ asphalt/concrete/color steel tile and other metal surfaces are recommended to use Tianshan 1527, Huitian 906Z, or other Kinse-approved structural adhesives.

Supporting bracket installation diagram

Double-sided tape recommended 3M-2204(Apply for Wanbaoli surface as pre- installation); High viscosity waterproof coating is recommended by Manbalit T401/T8000 or Tianshan P10 Color steel tile and other metal surface recommended structural adhesive for Tianshan-1527 or approved structural adhesive.

The following are the points for attention when making structural glue:
After cleaning the construction surface, the surface can be glued without water stains;

  • Recommended that the spacing between two modules be 10~20mm to avoid deformation extrusion in long-term use;
  • Glue along the center of the crest, glue width of 6 ~ 10mm, about 3 ~ 5mm high;
  • Smear must be uniform, continuous, before pasting is not allowed to scrape the rubber strip, to rely on extrusion to make the glue spread;
  • Glue and assembly time should be controlled in the shortest time (not more than 5 minutes);
  • Structural adhesive in 48 hours, the colloid will be cured 2~3mm depth, not fully cured before do not force;
  • PV module have transverse direction installation: The length of the structural glue is about 1030mm, the reference for the distance between the two structural adhesives is 460+/-10mm can’t less 5 sets o f detachable rails;
  • PV module have longitudinal direction installation: The length of the structural adhesive is about 1830mm, and the reference for the distance between the two structural adhesives is 345+/-10mm can’t less 4 sets of detach able rails .
  • After installation, press the surface f the module with a wooden strip or a hand-held roller to make the adhesive and the module tightly bonded.

Structural adhesive installation diagram

  • Layout design should avoid the color steel tile joint, bracket and bracket joint easily produce relative displacement area leading to fold or tear damage;

  • Two adjacent flexible modules keep a distance of 10mm to 30mm to avoid deformation effects;

  • Proper operation and maintenance channels should be set aside around modules. Do not step on modules.

  • Recommended to test the pullout force of the gluing effect to ensure the effective binding force of installation.

  • If the overhang height at both ends of the module is too long, use the aluminum square strip to flatten the overhang height. The height of the aluminum strip is consistent with the height of the wave crest, and the width of the module beyond the aluminum strip is less than 50mm;

For the installation methods not mentioned above, please consult a technical engineer, otherwise the loss caused by improper installation methods will not be borne.

Plane, Curved Surface, Trapezoidal Color Steel Tile Installation

Flat roof, curved surface, or trapezoidal color steel tile can be installed by direct adhesive.

Flat and curved roof including but not limited to PVC/TPO/ asphalt waterproof coil, metal curved surface, and color steel tile or flat roof;
During installation, refer to the requirements of the installation design scheme to evaluate whether the PVC/ asphalt material needs to be undercoated first. For TPO/ concrete roofing there are possible weathering and aging problems, direct installation will affect the bonding degree of modules and other problems, the roof must be treated first. For details, see the following steps:

  1. Polish the roof to remove the powdery layer;
  2. Repair the water leakage point with waterproof glue;
  3. The module installation position should be brushed with high-stick waterproof paint;
  4. After the coating is cured, ensure no gap, no water leakage, then install the module.

After installation, the integrated waterproof roof will ensure additional waterproof performance.

Plane Direct Gluing Installation

  1. Clean up the roof and the back of the module, no particles, dust, or residues on the surface;
  2. Stick a double-side tape on the back, the distance between the double-side tape to edge around 50mm( apply for curved surface , arch surface pre-installation);
  3. Make structural glue on the back of the module, the glue width is 6 ~ 10mm, the height is 3 ~ 5mm, should be installed within 5 minutes after gluing to prevent the silicone solidification to affect the bonding Performance;
  4. Two people together to lift the module on face up gently on the faulty module surface;
  5. Use press tools to slightly squeeze and fix, press tools or rollers are recommended;
  6. Be installed at least 4 hours before electrical connection, choose operated time on the morning and evening when the light is weak.

Flat direct adhesive installation scheme reference

Vertical edge-locking and angles metal roofs

  • Metal roofing, the most typical and common is the color steel tile vertical locking edge type, angle type roof

Auxiliary fixture and bracket installation

the aluminum bar is installed in the trough position of the colored steel tile, the aluminum bar and the colored steel tile are fixed with structural adhesive, the surface of the aluminum bar is flush with the surface of the colored steel tile, the structural adhesive is placed on the aluminum bar, and the modules are installed. This scheme can be used alone or in conjunction with the crest guide scheme.

  1. Use of vertical locking or special angular fixture, to connect the fixture and color steel;
  2. Connect the guide rail to the fixture and tighten it, then connect the corner components to the f.ix ture Note: The fixture should be drawn and tested on-site to ensure its firmness;
  3. Clean the surface of the guide rail, and then apply structural glue on the back of the guide rail contact module;
  4. Put the modules on, and press the gluing position with a press tool or roller in sequence to ensure good contact between the structural adhesive and the modules and guide rail. The height of the fixture is 20 ~ 50mm.

Detachable Bracket Installation

  • The detachable aluminum bracket (below left picture) is composed of left and right rails, fixed by bolts.
  • The left and right guide rails are glued to the back of the photovoltaic module and the mounting surface with structural adhesive, and the detachable bracket facilitates the flexible replacement of the photovoltaic module or the mounting surface.
  • For details pls refer to b.

Module Removal, Replacement, and Installation
Suitable for replacement and installation of faulty PV modules. This section describes how to perform operations when some modules fail to work properly or need to be transferred for update.

Apply to replace a new module when some modules do not work properly due to certain reasons.

The installation method of gluing new modules directly on defective ones.

  1. Should to be power of the series circuit of the module to be replaced in advance (important);
  2. Remove the junction box on the front of the abnormal module with a tool to ensure that the front of the abnormal module is smooth;
  3. Clean up the surface by soft cloth and dry it;
  4. Refer to the 5.2.1 installation step for adding glue on the opposite of the new flexible module;
  5. Two people lift the module together and put on faulty module, then use the roller brush to gently press the glue position to finish the installation.
  6. After 24 hours, check sticky and connect the circuit.

Remove the defective module carrier support, and then change the module installation method (optional)

  1. Confirm the number of modules to be replaced and remarked on surface, prepare the new modules quantity, aluminum strip or guide rails and tools;
  2. Disconnect power to modules in the field and loosen the connectors of the modules to be replaced to confirm safe operation
  3. Loosen the bolts at both ends with tools, and separate the auxiliary aluminum profiles and modules to be replaced from the connecting fixture;
  4. Two people use steel wire or other tools at the same time to cut the adhesive of the bad module and remove the bad module after cleaning the glue on the glue base material;
  5. Refer to 5.2.1 Aluminum profile to install the new module directly glue, and then carry the carrier support to the original position with bolts for connection;6. After 24 hours later, ensure sticky then install circuit.

Curved surface, plane, trapezoidal color steel tile installation scheme

Electrical Installation

  • Electrical parameters such as the Isc, Voc, and Pmax nominal values have deviated from the standard test conditions.
  • Standard test conditions: irradiance 1000W/m², battery temperature 25℃, atmospheric quality AM1.5.
  • When irradiance plus normal conditions, the current and voltage values generated may be higher than those obtained under standard test conditions.
  • Therefore, when determining the controller model associated with the module-rated voltage, wire-rated current, fuse type, and module power output, based on the highest ambient temperature at the installation site, combined with the temperature coefficient of the current in the technical manual, the short-circuit current is multiplied by the coefficient of 1.25 to calculate the short-circuit current.
  • On the basis of the installation lowest temperature which combining the technical manuals to calculate the open circuit voltage.
  • The voltages are added up when the modules is in series; current are added up when modules are connected in parallel.
  • Different electrical characteristics of PV modules cannot series.
  • It may cause electrical connections mis-match. should be carried out according to the manufacturer’s installation manual.

Connection Type

The maximum number of modules that can be connected in a series string must be calculated according to applicable regulations in such a way that the specified maximum system voltage (According to IEC61730 tests and appraisal, the maximum system voltage is 1000Vdc or 1500Vdc depending on the series and model.) of the modules and all other electrical DC modules will not be exceeded in open circuit operation at the lowest temperature expected at the PV system location. Variation of open-circuit voltage with temperature can be calculated based on the following formula: Voc(T)=Voc(25)×[1-β×(25-T)]. Voc(25) is open-circuit voltage at a standard temperature of 25°C. T is the lowest expected ambient temperature at the system location. Β (%/℃) is the temperature coefficient of the selected module Voc (Refer to the corresponding datasheet).

  • An appropriately rated over-current protection device must be used when the reverse current could exceed the value of the maximum fuse rating of the modules. An over-current protection device is required for each series string if more than two series strings are connected in parallel;
  • In the design of the modules, field connections use sealed IP68 junction boxes to provide environmental protection for the wires and their corresponding connections and accessible protection for uninsulated live parts;
  • The junction box is provided with a connected cable and IP68 connector, which is used for series between modules; Each module has two wires (a positive electrode and a negative electrode) separately connected to the junction box.
  • The two modules can be connected in series by inserting the positive interface at the other end of the wire of one module into the jack of the negative wire of the adjacent module.
  • The connection is successful when the clicking sound is heard.

Cable

  • Field connection modules with cable must meet the maximum short-circuit current, use photovoltaic (pv) systems special light resistant cable.
  • Recommended to fixed cable by the binding wire resistance to light and line card to fixed on the bracket;
  • Avoid cable or modules by mechanical forces crushed;
  • The cable must not be immersed in water for long periods of time.

Connector fabrication and precautions

Connectors

  • Ensure connector is dry and clean to avoid immersion in water before installation;
  • Avoid connectors falling on the ground or roof;
  • A faulty connection may produce electric arcs and shocks;
  • Ensure check all electrical connections for reliability;
  • Ensure that all locking connectors are fully locked.

Bypass Diode

  • The junction box of modules contains a bypass diode connected in parallel to a cell string inside the module;
  • When hot spots occur in parts of the module, the diode will work, so that the main current will not flow through the hot spot cell, thus limiting the module heat and performance loss;

Note that the bypass diode is not an overcurrent protection device;

CONTACT

  • Maanshan Kinse Energy Technology Co., Ltd
  • Add: No.9, Tagang Industrial Park, Tongzha Town, Hanshan County, Ma’anshan City Email:anpei@kinse-solar.com
  • Phone Number: 86-0555-2581308

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals