ERGOVENT PRO-1000 Lineo Pro Instructions

August 14, 2024
ERGOVENT

ERGOVENT PRO-1000 Lineo Pro

Specifications:

  • Model: LINEO PRO-1000/75 SINGLE-PROFILE DIFFUSER
  • Installation Manual Languages: EN, NL, IT, FR, PL, DK, LT, EE, UA, RO, NO, FI, LV, SI, DE, GR, RU
  • Maximum Installation Depth: 25mm

Product Usage Instructions

Installation:

  1. Follow the installation manual provided in the respective language.
  2. Ensure the diffuser is securely installed using the vertical installation method.
  3. Check for proper airflow balance after installation.

Usage:

  1. Once installed, adjust the diffuser settings as needed for optimal airflow.
  2. Refer to the manufacturer’s website www.ergovent.com for additional information or support.

FAQ

  • Q: What should I do if the diffuser is not providing adequate airflow?
    • A: Check if the diffuser is installed correctly using the vertical installation method. Ensure there are no obstructions blocking airflow.
  • Q: Can I adjust the airflow direction of the diffuser?
    • A: Yes, you can adjust the airflow direction by following the instructions provided in the installation manual.

Product Overview

INSTALLATION

  • Read carefully and follow the finishing recommendations set out in the installation instructions to prevent cracks in the putty joints.
  • Avoid installing ceiling diffusers above permanent seating areas. Since the airflow is directed directly downwards, you can feel the air current. The recommendation applies only to supply air diffusers.
  • When carrying out installation work, wear appropriate protective equipment: helmet, goggles, and gloves. The duct connection fittings are screwed into the connection box, or the covers are fixed by rotating them at an angle of 45 degrees (Fig. 1.5). It is necessary to rotate firmly up to the point of full fixation!
  • If you have purchased a diffuser with an airflow balancing damper, it is adjustable with two hex keys (Fig. 1.18).
  • When carrying out finishing works, we recommend following Knauf finishing technology. & Before applying putty, remove dust from the surfaces and gaps. Prime the surfaces with Ceresit CT-17 or Knauf “Tiefgrund” primer.
  • We recommend using Knauf’s “Fugenfuler” or “Uniflott” putty to fill gaps.
  • In order to prevent cracks in the joint, we recommend reinforcing the entire diffuser surface with thin glass fabric (Fig. 1.12).
  • Before painting, prime surfaces covered with putty by using a deep primer, and in humid premises, use a moisture-resistant primer.
  • In humid premises, use a moisture-resistant ceiling paint specifically designed for such premises.

INSTALLATION

VERTICAL INSTALLATION METHOD

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals