ERGOVENT 1000-75 SINGLE Built in Gypsum Diffuser Instruction Manual
- July 9, 2024
- ERGOVENT
Table of Contents
LINEO PRO-1000/75 SINGLE-PROFILE
DIFFUSER INSTALLATION MANUAL
1000-75 SINGLE Built in Gypsum Diffuser
|
---|---
Read carefully and follow the finishing recommendations set out in the
installation instructions to prevent cracks in the putty joints.
Avoid installing ceiling diffusers above permanent seating areas. Since the
air flow is directed directly downwards, you can feel the air current. The
recommendation applies only to supply air diffusers.
When carrying out installation work, wear appropriate protective equipment:
helmet, goggles and gloves.
The duct connection fittings are screwed into the connection box, or the
covers are fixed by rotating them at an angle of 45 degrees (Fig. 1.5). It is
necessary to rotate firmly up to the point of full flxation!
If you have purchased a diffuser with an airflow balancing damper, it is
adjustable with two hex keys (Fig. 1.18).
When carrying out finishing works, we recommend following Knauf finishing
technology.
Before applying putty, remove dust from the surfaces and gaps.
Prime the surfaces with Ceresit CT-17 or Knauf “Tiefgrund” primer.
We recommend using Knauf “Fugenfuler” or “Uniflott” putty to fill gaps.
In order to prevent cracks in the joint, we recommend reinforcing the entire
diffuser surface with thin glass fabric (Fig. 1.12).
Before painting, prime surfaces covered with putty by using a deep primer, and
in humid premises, use a moisture-resistant primer.
In humid premises, use a moisture-resistant ceiling paint specifically
designed for such premises.
INSTALLATION
VERTICAL INSTALLATION METHOD
LINEO PRO-1050/75 PROFILE-PUZZLE
|
---|---
DIFFUSER INSTALLATION
MANUAL
Read carefully and follow the finishing recommendations set out in the
installation instructions to prevent cracks in the putty joints.
Avoid installing ceiling diffusers above permanent seating areas. Since the
air flow is directed directly downwards, you can feel the air current. The
recommendation applies only to supply air diffusers.
When carrying out installation work, wear appropriate protective equipment:
helmet, goggles and gloves.
The duct connection fittings are screwed into the connection box, or the
covers are fixed by rotating them at an angle of 45 degrees (Fig. 1.10). It is
necessary to rotate firmly up to the point of full flxation!
If you have purchased a diffuser with an airflow balancing damper, it is
adjustable with two hex keys (Fig. 1.19).
When carrying out finishing works, we recommend following Knauf flnishing
technology.
Before applying putty, remove dust from the surfaces and gaps.
Prime the surfaces with Ceresit CT-17 or Knauf “Tiefgrund” primer.
We recommend using Knauf “Fugenfuler” or “Uniflott” putty to fill gaps.
In order to prevent cracks in the joint, we recommend reinforcing the entire
diffuser surface with thin glass fabric (Fig. 1.16).
Before painting, prime surfaces covered with putty by using a deep primer, and
in humid premises, use a moisture-resistant primer.
In humid premises, use a moisture-resistant ceiling paint specifically
designed for such premises.
INSTALLATION
VERTICAL INSTALLATION METHOD LINEO PRO-1000/75 SINGLE
|
---|---
DIFFUSER INSTALLATION
MANUAL
Read carefully and follow the finishing recommendations set out in the
installation instructions to prevent cracks in the putty joints.
Avoid installing ceiling diffusers above permanent seating areas. Since the
air flow is directed directly downwards, you can feel the air current. The
recommendation applies only to supply air diffusers.
When carrying out installation work, wear appropriate protective equipment:
helmet, goggles and gloves.
The duct connection fittings are screwed into the connection box, or the
covers are fixed by rotating them at an angle of 45 degrees (Fig. 1.10). It is
necessary to rotate firmly up to the point of full flxation!
If you have purchased a diffuser with an airflow balancing damper, it is
adjustable with two hex keys (Fig. 1.19).
When carrying out finishing works, we recommend following Knauf flnishing
technology.
Before applying putty, remove dust from the surfaces and gaps.
Prime the surfaces with Ceresit CT-17 or Knauf “Tiefgrund” primer.
We recommend using Knauf “Fugenfuler” or “Uniflott” putty to fill gaps.
In order to prevent cracks in the joint, we recommend reinforcing the entire
diffuser surface with thin glass fabric (Fig. 1.16).
Before painting, prime surfaces covered with putty by using a deep primer, and
in humid premises, use a moisture-resistant primer.
In humid premises, use a moisture-resistant ceiling paint specifically
designed for such premises.
INSTALLATION
FINISHING INSTRUCTIONS
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>