PGPT25S Mastrant Guying Kit Instructions
- August 14, 2024
- Mastrant
Table of Contents
- PGPT25S Mastrant Guying Kit
- Product Specifications
- Product Usage Instructions
- Frequently Asked Questions
- Guying packs – tips and instructions
- Using the cleat tensioner
- Installing locking clip after all guy ropes have been tensioned
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
PGPT25S Mastrant Guying Kit
Product Specifications
- Product Name: Guying Pack
- Material: Suitable for guying telescopic masts in 3 directions
- Types Available: PGPT25S, PGPT34S, PGPT50S, PGPT25H, PGPT34H
- Number of Guying Levels: 2 (for 25 ft.), 3 (for 34 ft.), 4 (for 50 ft.), 2 (for 25 ft. Heavy), 3 (for 34 ft. Heavy)
- Components: Rope clips, Tensioners, Links, Rope lengths
Product Usage Instructions
Guying Kit Overview
The guying pack is designed for specific mast types. Ensure the kit matches the mast type you have.
Setting Up Guying System
- Refer to the recommended distances and individual rope lengths for attaching guy rings on mast segments.
- Place guy rings in order from the bottom as specified in the manual.
Attaching Ropes
Attach the ropes to the guy rings on the mast segments as per the recommended lengths.
Using Cleat Tensioner
Utilize the cleat tensioner to adjust the tension of the guy ropes for stability.
Finalizing Installation
Install locking clips after ensuring all guy ropes are properly tensioned as per the guidelines.
Additional Resources
For more detailed instructions, refer to the PDF manual available at: https://www.mastrant.com/PGPT
Frequently Asked Questions
Q: Can this guying pack be used for masts of other heights not listed?
A: It is recommended to use the guying pack for the specific mast heights mentioned in the manual for optimal performance and safety.
Q: How many tensioners and links are included in each kit?
A: The number of tensioners and links included varies based on the kit type. Refer to the manual or packaging for specific quantities.
Guying packs – tips and instructions
The guying pack contains material suitable for guying telescopic masts in 3 directions. Please refer to the packaging for the specific type of mast for which it is intended. Overview of the individual kits:
ID| For Mast| Guying Levels| Rope clips| Tensioners| Links|
Rope ft.
---|---|---|---|---|---|---
ID ADC03| ID CL276| ID ACC06| M-P 3+
PGPT25S| 25 ft.| 2| 12| 6| 6| 165
PGPT34S| 34 ft.| 3| 18| 9| 9| 330
PGPT50S| 50 ft.| 4| 24| 12| 12| 660
PGPT25H| 25 ft. Heavy| 2| 12| 6| 6| 165
PGPT34H| 34 ft. Heavy| 3| 18| 9| 9| 330
Recommended distances, individual rope lengths (with a margin of about 2 ft. on each guy line), and segment numbers for placement of guy rings:
Mast
| Dist. [ft.]
all
| Rope length [ft.]| Guy rings on mast segments in order from the
bottom:
---|---|---|---
Lev. top| Lev. -1| Lev. -2| Lev. -3
25 ft.| 20| 29| 23| | | 3, 5
34 ft.| 28| 43| 36| 32| | 3, 5, 7
50 ft.| 44| 65| 57| 52| 47| 3, 6, 8, 10
Attaching the rope to the guy ring
Using the cleat tensioner
Installing locking clip after all guy ropes have been tensioned
This manual (latest version) can be found in PDF form here: https://www.mastrant.com/PGPT
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>