Blue-White CFS Series CHEM-FEED Municipal Skid System Instruction Manual
- August 13, 2024
- Blue-White
Table of Contents
- Introduction
- Features
- Specifications
- Dimensions
- Mounting Pump to the Chem-Feed® System – Single and Dual System
- Component Identification and Typical Operation – Single Pump Skid
- Component Identification and Typical Operation – Dual Pump Skid
- Mounting the Chem-Feed® System – Single and Dual System
- Chem-Feed® Skid System Matrix Simplex
- LIMITED WARRANTY
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
Operating Manual
CHEM-FEED® Municipal Skid Systems
Series CFS
Introduction
Congratulations on purchasing the Chem-Feed® Engineered Skid System. The
system is designed with the necessary components to safely inject liquid
chemical into a system.
Your Chem-Feed® Engineered Skid System is pre-configured based on your
selections via the matrix or when designed with our engineering staff.
Please Note: Your new Chem-Feed® System
has been pressure tested at the factory with clean water for a minimum of four
hours before shipping. You may notice trace amounts of clean water in the
system. This is part of our stringent quality assurance program at Blue-White
Industries.
Features
Chem-Feed® Engineered Skid Systems were designed and engineered using solid modeling tools for superior piping installation and easy component maintenance. Custom engineered universal mounting blocks and pre-machined mounting slots provide for easy component servicing and replacement. Each factory built and tested system includes the following standard components:
-
Pressure Relief Valve – Protects the system from over-pressurization, 5-100 psi setting range, 150 psi maximum system pressure. Ships on all systems.
-
Check Valve – Protects the user from back-flow during pump maintenance. Ships on all systems.
-
Flow Verification Sensor – S6A accurately verifies chemical feed. Exclusive to Blue-White®.
-
Inlet Y Strainer – Protects system components from damage cause by dirt or debris.
-
Calibration Cylinder – Confirm pump output under system conditions. Specify cylinder volumes from 1.6 GPH to 32 GPH.
-
Pulsation Dampener – Protect the system components from pulsation. Recommended for diaphragm pump systems.
Not recommended for peristaltic pump systems. -
Pressure Gage with Guard – Isolate and protect the system pressure gage. Specify pressure ranges from 0-100psi, or 0-200 psi.
-
Mounting Pads – Stainless Steel mounting pads to secure Chem-Feed® System to a solid surface. Designed for floor mount or wall mount.
-
Corrosion Resistant – Chem-Feed® frame constructed of chemically resistant polyester powder coated 6061 T6 aluminum. Welded joint construction.
Specifications
Items listed below are standard available items and ship with most
configurations. Your system may be customized with components not listed
below.
Skid
Chemically resistant polyester powder coated 6061 T6 aluminum. Welded joint
construction.
Pump (sold separately)
FLEXFLO model M1, M2, M3 or M4 peristaltic pumps or CHEM-FEED model Md1, MD3,
MC-2, or MC-3 diaphragm pump.
Piping
PVC Schedule 80 (optional CPVC).
Tubing (T)
Reinforced braided PVC, 200 Psi max, certified NSF 1 / NSF 61. The pump inlet
and outlet flexible tubing connections are terminated to half unions and
secured to the barbed fitting with stainless steel clamps. The calibration
cylinder fill
Tubing clamps
300 series SS band, 400 series SS screw
Unions (U)
PVC body, schedule 80, FKM seals
Ball valves (V)
Vented ball type, True unions, PVC body, PTFE shaft bearings and seats,
FKM seals
Pressure Relief Valve (PRV)
PVC body, PTFE primary diaphragm seal. Non-wetted components: FKM secondary
seal, zinc plated steel spring, stainless steel external hardware, HDPE
pressure adjusting screw and locknut. Infinite adjustment from 5100 psi.
Maximum inlet pressure 150 psi.
Calibration Cylinder (CC)
PVC body, PVC end caps, 1/4” ID tubing outlet vent.
Available volumes: 1.6 GPH (100ml), 4 GPH (250ml), 8 GPH (500ml), 16 GPH
(1000ml), 32 GPH (2000ml).
Pulsation Dampener (PD)
CPVC body,10 cubic inch volume, FKM bladder (optional EPDM bladder)
Gauge w/guard (G)
Gauge: liquid filled stainless steel with blowout plug, bottom mount, 1/4” NPT
theads. Available pressure ranges: 0-30 psi, 0-100, psi, 0-200 psi. Guard: PVC
body, FKM diaphragm seal, temperature compensated oil filled.
Check Valve (CV)
PVC body, FKM diaphragm (optional EPDM). Cracking pressure: 1.0-1.5 psi.
Maximum working pressure: inlet = 150 psi, back = 100 psi.
Flow Indicator (F)
Machined cast acrylic, PVC connections, ceramic ball, polypropylene ball stop,
PVC half unions, FKM seals (optional EPDM).
Y Strainer (S)
PVC body, FKM seals (optional EPDM).
Universal mounting blocks
PVC
Pump extended mounting brackets
316 Stainless Steel
Skid mounting foot pads
316 Stainless Steel
Mounting hardware
18-8 Stainless Steel
Drip Tray
Polypropylene
Maximum working pressure
150 psig (10.3 bar)
Operating Temperature
14 F to 115 F (-10 C to 46 C) O O O O
Drip Tray
16” x 21” x 3” – 4 gallons total containment
Approximate Shipping Weight
Single Pump System: 50 lb. (22.7 Kg)
Dual Pump System: 60 lb. (27.2 Kg)
Dimensions
Your Chem-Feed System may be designed differently from drawings below.
However, the dimensions shown below remain the same no matter your
configuration.
Single Pump System:
Mounting Pump to the Chem-Feed® System – Single and Dual System
Component Identification and Typical Operation – Single Pump Skid
6.1 How To Operate the Chem-Feed® Skid System – Single Pump Skid
Connections:
Connect chemical solution into either Inlet 1 or inlet 2. (V-1 or V-2)
Connect chemical treated system to outlet. (V-7)
Connect safety vent adapter with 1/4” ID tube from top of calibration cylinder
to chemical supply tank.
To Pump chemical solution into system.
Open ball valve V-1 or V-2, depending on your inlet side.
Close ball valve V-3.
Open ball valve V-4.
Close ball valve V-6.
Open ball valve V-7 to inject chemical solution into your system.
Start pump.
To calibrate pump / system.
Open ball valve V-1 or V-2, depending on your inlet side.
Close ball valve V-3.
Open ball valve V-4.
Close ball valve V-7.
Open ball valve V-6.
Start pump and run until calibration cylinder is filled to top calibration
line. Do not leave pump unattended during this operation.
Stop pump once calibration cylinder is filled.
Close ball valves V-1 and V-2.
Close ball valve V-6.
Open ball valve V-3.
Open ball valve V-4.
Open ball valve V-7 to inject chemical solution into your system.
Note the chemical solution level in the calibration cylinder.
To calibrate pump at maximum speed into your system, Press the prime button on
pump. The prime mode runs the pump at maximum speed for 60 seconds (1 minute)
on all Blue-White® ProSeries(r) pumps.
To calibrate pump at your desired feed rate, you must pre-program your pump
speed before running this routine. Please refer to the instruction manual for
your pump to adjust feed rate and additional calibration instructions.
Component Identification and Typical Operation – Dual Pump Skid
7.1 How To Operate the Chem-Feed® Skid System – Dual Pump Skid
Connections:
Connect chemical solution into either Inlet 1 or inlet 2. (V-1 or V-2)
Connect chemical treated system to outlet. (V-8)
Connect safety vent adapter with 1/4” ID (3/8” OD) tube from top of
calibration cylinder to chemical supply tank.
To Pump chemical solution into system.
Open ball valve V-1 or V-2, depending on your inlet side.
Close ball valve V-3.
Open ball valve V-4 and / or V5. Depending on your system design.
Close ball valve V-7.
Open ball valve V-8 to inject chemical solution into your system.
Start pump(s).
To calibrate pump(s) / system.
Open ball valve V-1 or V-2, depending on your inlet side.
Close ball valve V-3.
Open ball valve V-4 or V5, depending on which pump you’re calibrating.
Close ball valve V-8.
Open ball valve V-7. This open valve will direct chemical into calibration
cylinder.
Start pump and run until calibration cylinder is filled to top calibration
line. Do not leave pump unattended during this operation!
Stop pump once calibration cylinder is filled.
Close ball valves V-1 and V-2.
Close ball valve V-7.
Open ball valve V-3.
Open ball valve V-4 or V5, depending on which pump you’re calibrating.
Open ball valve V-8 to inject chemical solution into your system.
Note the chemical solution level in the calibration cylinder.
To calibrate pump at maximum speed into your system, Press the prime button on
pump. The prime mode runs the pump at maximum speed for 60 seconds (1 minute)
on all Blue-White® ProSeries(r) pumps.
To calibrate pump at your desired feed rate, you must pre-program your pump
speed before running this routine.
Please refer to the instruction manual for your pump to adjust feed rate and
additional calibration instructions.
Mounting the Chem-Feed® System – Single and Dual System
FLOOR MOUNT
The Skid system is shipped with the mounting brackets ready for floor
mounting. Mount the skid system to the floor using eight 1/4-20 Bolts (see
fig.1) through the mounting brackets.
WALL MOUNT
Remove the mounting brackets using a 1/4” wrench or socket. Install those same
mounting brackets in the vertical position on the sides of the skid system
(see fig.2). Mount the skid system to the wall using eight 1/4-20 Bolts
through the mounting brackets.
Chem-Feed® Skid System Matrix Simplex
Model Number Matrix
CHEM-FEED® Engineered Skid System – Municipal
NOTE: All skid systems ship with the following in/out union connections:
1%” PVC female NPT, %” PVC slip glue. Pump sold separately.
When ordering pumps for skids, pump head orientation is standard LEFT facing
only.
LIMITED WARRANTY
Your new Chem-Feed Engineered Skid System is a quality product and is warranted for 24 months from date of purchase (proof of purchase is required). The system will be repaired or replaced at our discretion. The metering pump may have its own warranty and is not covered under this warranty.
WHAT IS NOT COVERED
- The metering pump is covered under a separate warranty.
- Removal, re-installation, and any related labor charges.
- Freight to the factory, or ProSeries service center.
- Systems that have been tampered with, or in pieces.
- Damage to the System that results from misuse, carelessness such as chemical spills, abuse, lack of maintenance, unsuitable materials of construction, or alteration which is out of our control.
- Systems damaged by acts of nature.
Blue-White Industries does not assume responsibility for any loss, damage, or
expense directly or indirectly related to or arising out of the use of its
products. Failure must have occurred due to defect in material or workmanship
and not as a result of operation of the product other than in normal operation
as defined in the system manual. System components not manufactured by Blue-
White are warrantied by their respective manufacturers. Manufacturer makes no
warranty of fitness or merchantability. Purchaser assumes all liability in
determining the acceptability of the system in their specific application.
Warranty status is determined by the system serial label and the sales invoice
or receipt. The serial label must be on the system and legible. The warranty
status of the system will be verified by Blue-White or a factory authorized
service center.
OTHER IMPORTANT WARRANTY INFORMATION
Blue-White engineered skid systems are factory tested with water only for
pressure and performance. Installers and operators of these systems must be
well informed and aware of the precautions to be taken when injecting various
chemicals – especially those considered hazardous or dangerous. Eye protection
must be worn when working around this product. Should it become necessary to
return the system or system components for repair or service, you must attach
information regarding the chemical used as some residue may be present within
the unit which could be a hazard to service personnel. Blue-White Industries
will not be liable for any damage that may result by the use of chemicals with
their system and its components.
PROCEDURE FOR IN WARRANTY REPAIR
Contact the factory to obtain a RMA (Return Material Authorization) number.
Carefully pack the system or component to be repaired. Please enclose a brief
description of the problem as well as the original invoice or sales receipt,
or copy showing the date of purchase. Prepay all shipping costs. COD shipments
will not be accepted. Warranty service must be performed by the factory or an
authorized ProSeries service center. Damage caused by improper packaging is
the responsibility of the sender. When In-Warranty repair or replacement is
completed, the factory pays for return shipping to the dealer or customer.
Users of electrical and electronic equipment (EEE) with the WEEE marking per
Annex IV of the WEEE Directive must not dispose of end of life EEE as unsorted
municipal waste, but use the collection framework available to them for the
return, recycle, recovery of WEEE and minimize any potential effects of EEE on
the environment and human health due to the presence of hazardous substances.
The WEEE marking applies only to countries within the European Union (EU) and
Norway. Appliances are labeled in accordance with European Directive
2002/96/EC.
Contact your local waste recovery agency for a Designated Collection Facility
in your area.
5300 Business Drive, Huntington Beach, CA 92649 USA
Phone: 714-893-8529
FAX: 714-894-9492
E mail: sales@blue-white.com or techsupport
@blue-white.com
URL: www.blue-white.com
P.N. 80000-596 Rev 11 20240109
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>