VEVOR 20 Feet Tunnel Greenhouse Instruction Manual

August 6, 2024
VEVOR

VEVOR 20 Feet Tunnel Greenhouse

6X3X2 ASSEMBLY INSTRUCTIONS

Base layout

Assemble for 2 sets floor tubes No3+No4+No3 use the shorter bolts, and the horizontal frame No4+No3+No3+No3+No3+No3together

Installation Instruction

Loosely assemble complete frame, before tightening all bolts in final position.

Tied the string in the back of the cover to the frame.
Use the ropes and stakes for four cormers of the greenhouse, to reinforce the stability of it.

WARNING : Covering the roof carefully, makes all places in right position as possible as not make the frame structure of the greenhouse out of shape.
DO NOT USE IN BAD WEATHER CONDITIONS , such as rainstorms, hailstone, heavy snow and heavy wind.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals