VEVOR 20 Feet Tunnel Greenhouse Instruction Manual
- August 6, 2024
- VEVOR
Table of Contents
VEVOR 20 Feet Tunnel Greenhouse
6X3X2 ASSEMBLY INSTRUCTIONS
Base layout
Assemble for 2 sets floor tubes No3+No4+No3 use the shorter bolts, and the horizontal frame No4+No3+No3+No3+No3+No3together
Installation Instruction
Loosely assemble complete frame, before tightening all bolts in final position.
Tied the string in the back of the cover to the frame.
Use the ropes and stakes for four cormers of the greenhouse, to reinforce the
stability of it.
WARNING : Covering the roof carefully, makes all places in right position
as possible as not make the frame structure of the greenhouse out of shape.
DO NOT USE IN BAD WEATHER CONDITIONS , such as rainstorms, hailstone,
heavy snow and heavy wind.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>