SUNGROW SH8.0RS, SH10RS 8kW Single Phase Hybrid Storage Inverter Installation Guide

August 6, 2024
SUNGROW

SUNGROW-logo

SUNGROW SH8.0RS, SH10RS 8kW Single Phase Hybrid Storage Inverter

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-Inverter-product-
image

WWW.SUNGROWPOWER.COM

Backup Wiring Diagram (For AU / NZ/ SA)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-64

Note1: If the battery is integrated with a readily accessible internal DC breaker, no additional DC breaker is required.

  • The recommended values in the table are for reference only. The actual values must comply with local standard and actual conditions.
  • The rated current of breaker 2  is suggested to lower than that of breaker 5 .
  • If the rated current of on-site power cables are lower than those recommended above, the breakers specification should be considered to match the power cables in first priority.
  • The AC port takes power from the grid and is set according to the grid circuit breaker.

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(1\)

Backup Wiring Diagram (For Other Countries)

Model 1 2 3 4 5 6 7 8
SH8.0-10RS 63A/600V
DC breaker* ,;63A/230V/400V TypeC AC breaker 63A/230V/400V TypeC AC breaker
Depends on loads Depends on household loads and inverter capacity (Optional)

30mARCD
(Recommended)| 300mARCD
(Recommended)

Note1: * If the battery is integrated with a readily accessible internal DC breaker, no additional DC breaker is required.

  • The recommended values in the table are for reference only. The actual values must comply with local standard and actual conditions.
  • The rated current of breaker 2 is suggested to lower than that of breaker 5 ·
  • If the rated current of on-site power cables are lower than those recommended above, the breakers specification should be considered to match the power cables in first priority.
  • The AC port takes power from the grid and is set according to the grid circuit breaker.

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(2\)

Backup Wiring Diagram (For TT system)

Model 1 2 3 4 5 6 7 8
SH8.0-1ORS 63A/600V
DC breaker* 563A/230V/400V
TypeC AC breaker 63A/230V/400V
TypeC AC breaker Depends
on loads Depends on household loads and inverter capacity (Optional} 30mARCD
(Recommended} 300mA RCD

(Recommended}

Note1: * If the battery is integrated with a readily accessible internal DC breaker, no additional DC breaker is required.

  • The recommended values in the table are for reference only. The actual values must comply with local standard and actual conditions.
  • The rated current of breaker 2 is suggested to lower than that of breaker 5 ·
  • If the rated current of on-site power cables are lower than those recommended above, the breakers specification should be considered to match the power cables in first priority.
  • The AC port takes power from the grid and is set according to the grid circuit breaker.

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(3\)

Whole Home Backup (For AU / NZ / SA)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-65

Note1: * If the battery is integrated with a readily accessible internal DC breaker, no additional DC breaker is required.
Note2: The recommended values in the table are for reference only. The actual values must comply with local standard and actual conditions.

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(4\)

Scope of Delivery

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(5\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(6\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(7\)

• The images shown here are for reference. The actual product and quantity are based on delivery.
•• Types of equipment to be applied vary in different regions. Please consult local customer service for equipment type selection.
••• These accessories are included in the scope of delivery only in Australia currently.

Mounting location

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(8\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(9\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(10\)

Installation tools

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(11\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(12\)

Mounting

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(14\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(15\)

Use appropriate mounting hardware for wall type.

PE

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(16\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(17\)

The cable specification must comply with local regulations (if available). Otherwise, keep it consistent with the PE wire in the AC cable.

AC

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(18\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(19\)

  • If local standard have other requirements for cables, set the cable specification according to the local standard.

DC

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(20\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(21\)

Backup

The PE wire of Backup tenninal is not required for Australia , New Zealand and South Aflica .

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(22\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(23\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(24\)

Battery (Power)-Connector

Refer to the instructions supplied by the battery manufacturer for the connections on the battery side and configuration.

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(25\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(26\)

WiNet-S2/EyeM4

  • Installation with WLAN communication

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(27\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(28\)

  • Installation with Ethernet communication

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(29\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(30\)

COM (Meter, RS485, CAN, ORM)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(31\)

Label Description
Meter (A2, B2) For Smart Energy Meter
BAT-CAN (H, L) For Li-ion battery communication via CAN protocol. Detail

battery information refer to inverter user manual.
RS485 (A1, B1)| For inverter daisy chain (Reserved)
For Li-ion battery communication via RS485 protocol. Detail information refer to inverter user manual.
RSD (RSD-1, RSD-2)| Reserved (Detail availability contact SUNGROW)
RS485_2 (A3, B3)| For EV Charger communication via RS485 protocol.
Enable (EN_H, EN_G)| Enable the battery with a voltage of 12V.
Detail power specification refer to inverter user manual.
ORM (D1/5, D2/6, D3/7, D4/8, R, C)| For external Demand Response Enabling Device (“AU”/”NZ”)
For Ripple Control Receiver
DO (COM1, COM2, N01, N02)| Reserved (Detail availability contact SUNGROW)
BAT-CAN (H, L)| For Li-ion battery communication via CAN protocol.
Detail battery information refer to inverter user manual.

  • Take Smart Energy Meter connection as an example.

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(32\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(33\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(34\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(35\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(36\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(37\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(38\)

COM ( ORM)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(39\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(40\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(42\)

Battery (Communication)

For the communication of battery that does not need to be enabled

Method 1

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(43\)

Method 2

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(44\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(46\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(47\)

Protective Cover Installation (Optional)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(48\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(49\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(50\)

Power on

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(51\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(52\)

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(53\)

LED panel

SUNGROW-SH80RS,-SH10RS-8kW-Single-Phase-Hybrid-Storage-
Inverter-\(54\)

  • In normal state, the E-day, Pac and SOC information will be displayed alternately. Also you can touch the LED indicator to switch the information.
  • In error state, touch the LED indicator to view multiple error codes.
  • If there is no operation for 5 minutes, the display screen will be off. Touch the LED indicator to activate it.

LED 1nd1cator

LED indicator LED state Definition
ON The inverter is operating normally.
Twinkling The inverter is at standby or startup state ((not feeding power

into the grid).
| ON| A system fault has occurred.
| OFF| Both the AC and DC sides are powered down.

  1. Contents may be periodically updated or revised due to product development. The information in this guide is subject to change without notice. In no case shall this guide substitute for the user manual or related notes on the device.
  2. Make sure to read over, fully understand and strictly follow the detailed instructions of the user manual and other related regulations before installing the equipment. The user manual can be downloaded by visiting the website at http://support.sungrowpower.com/; or it can be obtained by scanning the QR code on the side of the equipment or the back cover of this guide.
  3. All operations can be performed only by qualified personnel, that must be trained for installation and commissioning of electrical system, as well as dealing with hazards, have knowledge of the manual and of the local regulations and directives.
  4. Before installation, check that the package contents are intact and complete compared to the packing list. Contact SUNGROW or the distributor in case of any damaged or missing components.
  5. The cable used must be intact and well insulated. Operation personnel must wear proper personal protective equipment (PPE) all the time.
  6. Any violation could result in personal death or injury or device damage, and will void the warranty.

Safety

The inverter has been designed and tested strictly according to international safety regulations. Read all safety instructions carefully prior to any work and observe them at all times when working on or with the inverter. Incorrect operation or work may cause:

  • injury or death to the operator or a third party;
  • damage to the inverter or other properties.

Please follow the safety instructions related to the PV strings and the utility grid.

DANGER
Lethal voltage!

  • PV strings will produce electrical power when exposed to sunlight and can cause a lethal voltage and an electric shock.
  • Only qualified personnel can perform the wiring of the PV panels.

NOTICE
Danger to life from electric shock due to lethal voltage!

  • All electrical connections must be in accordance with local and national standards.
  • Only with the permission of the local utility grid company, the inverter can be connected to the utility grid.

Inverter
The warning label on the inverter body are as follows.
Disconnect the inverter from all the external power sources before maintenance!

Do not touch live parts for 10 minutes after disconnection from the power sources.
Burn danger due to hot surface that may exceed 60 °C.
Danger to life due to high voltages!
Only qualified personnel can open and maintain the inverter.
Read the user manual before maintenance!

DANGER
Danger to life from electric shocks due to live voltage

  • Do not open the enclosure at any time. Unauthorized opening will void warranty and warranty claims and in most cases terminate the operating license.
  • When the enclosure lid is removed, live components can be touched which can result in death or serious injury due to electric shock.

Lethal danger from electric shock due to possibly damaged inverter

  • Only operate the inverter when it is technically faultless and in a safe state.
  • Operating a damaged inverter can lead to hazardous situations that can result in death or serious injuries due to electric shock.

WARNING
Risk of inverter damage or personal injury

  • Do not pull out the PV connectors and AC connector when the inverter is running. Disconnect the AC circuit breaker and set the DC load-break switch of the inverter to OF F. Wait 10 minutes for the internal capacitors to discharge. Verify that there is no voltage or current before pulling any connector.

WARNING
All the warning labels and nameplate on the inverter body:

  • must be clearly visible; and
  • must not be removed, covered or pasted.

CAUTION
Risk of burns due to hot components!

  • Do not touch any hot parts (such as the heat sink) during operation. Only the DC switch can safely be touched at any time.

NOTICE
Only qualified personnel can perform the country setting.

Unauthorized alteration may cause:

  • A breach of the type-certificate marking.

Risk of inverter damage due to electrostatic discharge (ESD)!
By touching the electronic components, you may damage the inverter. For inverter handling, be sure to:

  • avoid any unnecessary touching; and
  • wear a grounding wristband before touching any connectors.

Battery
DANGER
Batteries deliver electrical power, resulting in burns or a fire hazard when they are short circuited, or wrongly installed.
Lethal voltages are present in the battery terminals and cables in the inverter. Severe injuries or death may occur if the cables and terminals in the inverter are touched.

NOTICE
Improper settings or maintenance can permanently damage the battery. Incorrect inverter parameters will lead to the premature aging of battery.

More information in the QR code or at http://support.sungrowpower.com/
Sungrow Power Supply Co., ltd.
www.sungrowpower.com

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals