zigbee PC341-W-TY Multi-Circuit Power Meter User Guide
- July 31, 2024
- zigbee
Table of Contents
- zigbee PC341-W-TY Multi-Circuit Power Meter
- Product Information
- Technical Specifications
- Get to know your device
- LED indicator
- Installaion
- Connect the power
- Clamp Sub CTs around the circuit
- Wiring reference
- Configure Network
- Mounting
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
zigbee PC341-W-TY Multi-Circuit Power Meter
Product Information
Welcome
The Power Meter helps you monitor the amount of electricity consumed and
produced in your facility by connecting the clamp onto the power cable. This
guide will provide you with an overview of the product and help you get
through the initial setup to installation.
Get to know your device
The ports on the main unit include 3.5mm L1/A, L2/B, and L3/C audio ports
for the Main CTs, 2.5mm audio ports for the Sub CTs, and a power input port at
the bottom of the main unit. The LED indicator on the main unit provides
status information.
Installation
Important safety information: Turn off the main breaker in your
electric panel to shut off all power in your home.
Find a suitable spot for the Power Meter, either inside or outside the
electrical panel, and install the External Antenna to ensure signal reception.
Clamp the Main CTs around the service mains with caution as they are always
live.
Installation Steps:
- Turn off power: Turn off the main breaker in your electric panel.
- Find a spot for Power Meter: Choose a location that suits your needs.
- Inside electrical panel
- On the wall
- Install the antenna: Place the External Antenna outside the electrical panel.
- Clamp Main CTs around service mains:
- Open the clasps on the Main CTs to identify the direction of CT.
- Clamp one Main CT on each main service line with the arrow pointing towards the breakers.
Warning: The service mains are always live!
-
Frequently Asked Questions (FAQ)
Q: What do the LED indicators on the Power Meter signify?
A: The LED status indicates different states of the Power Meter:- Green LED blinking: Wait for pairing
- Green LED solid on: Device has connected to cloud
- Red LED solid on: Device is connected to the router but failed to connect to the cloud
- Red LED blinking: Wi-Fi has been configured but failed to connect to the router
Safety Handling
WARNING: Failure to follow these safety notices could result in fire,
electric shock, other injuries, or damage to the Power Meter and other
property. Read all the safety notices below before using the Power Meter.
- Avoid high humidity or extreme temperatures.
- Avoid long exposure to direct sunlight or strong ultraviolet light.
- Do not drop or expose the unit to intense vibration.
- Do not disassemble or try to repair the unit on your own.
- Do not expose the unit or its accessories to flammable liquids, gases or other explosives.
Technical Specifications
Wireless Connectivity
Wi- Fi|
- 802.11 b/g/n @ 2.4GHz
RF Characteristics|
- Operating frequency: 2.4GHz
- External magnetic antenna
Physical Specifications
Operating Voltage|
- 90~380 Vac 50/60 Hz
**Supported Systems**|
- Single-Phase up to 380VAC line- neutral
- Split-Phase 120/240VAC
- Three-Phase up to 480Y/277VAC (No Delta/wye/Y/Star Connection)
Calibrated Metering Accuracy|
- ±2%
Reporting Cycle|
- Every 15 seconds
Operating environment|
- Temperature: -20 ℃~ +55 ℃
- Humidity: ≤ 90% non-condensing
Dimension|
- 111.3(L) x 81.2(W) x 41.4(H) mm
Welcome
Power Meter helps you monitor the amount of electricity Consumed and Produced
in your facility by connecting the clamp on to the power cable.
This guide will provide you with an overview of the product and help you get
through the initial setup to installation.
Features:
- Tuya compliant. Support automation with other Tuya device
- Single, Split-Phase 120/240VAC, 3-Phase/4-wire 480Y/277VAC electricity system compatible
- Remotely monitor whole home Energy and up to 2 individual circuits with 50A Sub CT, like Solar, lighting, receptacles
- Bi-Directional measurement
- Real-time Voltage, Current, PowerFactor, ActivePower, Frequency measurement
- Historical data of Energy Consumed and Energy Production
Get to know your device
All of the ports are labeled on the back of the main unit.
-
The 3.5mm L1/A, L2/B, and L3/C audio ports on the top of the main unit are the inputs for the Main CTs.
-
The 2.5mm audio ports on the sides of the main unit are the inputs for the Sub CTs
-
The port at the bottom of the main unit are the inputs for power cable
Reset Button
- Reset. Press and hold the reset button for 5 seconds until the LED indicator flashes red 3 times quickly to restore the Power Meter to default factory settings (energy data will not be cleared).
If you want to clear the energy data, please delete the device and wipe data on the app and then add it again.
LED indicator
The LED status gives the following information of the Power Meter:
LED Status | What it means |
---|---|
Green LED blinking | Wait for pairing |
Green LED solid on | Device has connected to cloud. |
Red LED solid on | Device is connected to the router, but |
failed to connect to the cloud.
Red LED blinking| Wi-Fi has been configured, but failed to
connect to the router.
Installaion
Important safety information!
- The Power Meter must be installed and serviced only by a qualified electrical personnel.
- Do not touch the terminals of the device during testing.
- Turn off the power before connecting or disconnecting it to an auxiliary device.
- Double check the power is off with a properly rated voltage sensing device.
- Failure to follow these instructions will result in death or serious injury.
Turn off power
You need to turn off the main breaker in your electric panel to shut off all
of the power in your home (However, the service mains are always live!). Then
remove screws securing the cover to the panel to access the circuit breakers.
Find a spot for Power Meter
Find a spot that works for you. You can fit it within your electrical panel or
you can use the mounting bracket to fix it on the wall outside the electrical
panel if there is no room for your electrical panel.
Install the antenna
Locate the External Antenna outside the electrical panel to ensure that that
the Power Meter signal is not blocked by metal (The base of the antenna has a
magnetic and can be adsorbed on iron materials). After that, screw the
External Antenna to the Antenna connector.
If you install the Power Meter into the electrical panel, you can use a
screwdriver to punch out a knockout cover in the electrical panel. Then feed
the External Antenna cable through the hole.
Clamp Main CTs around service mains
- Open the clasps on the Main CTs(3.5mm audio plug) to see the arrow (P1→P2) or (K→L) or you can find it on the sticker on the outside of the clamp. This is the direction of CT.
- Clamp one Main CT on each main service lines. Make sure the arrow on the CT must point towards the breakers! Your system may have 1, 2, or 3 main service lines, and a corresponding number of Main CTs are required.
- If you have Line/Service-side tap solar, Main CT must be clamped between the electricity meter and incoming feeds from inverter.
- Insert each 3.5mm audio plug of Main CT into the corresponding audio jack on the top of the Power Meter:
- The CT measuring the L1/A line should plug into the audio jack labeled L1/A.
- The CT measuring the L2/B line should plug into the audio jack labeled L2/B.
- The CT measuring the L3/C line should plug into the audio jack labeled L3/C.
Please refer to the picture below for the number and location of Main CTs in different systems:
Connect the power
- Connect the power cable into the bottom of the main unit until it clicks into place securely.
- Secure N wire from the power cable to the neutral bus bar and L1 wire to the L1/A breaker pole.
If your system is 3-Phase, secure the L2, L3 wire corresponding to L2/B, L3/C breaker pole.
If your system is Split-Phase, only secure the L2 wire to L2/B breaker pole. L3 wire need to connect to the neutral bus bar.
If your system is Single Phase, the L2 and L3 wire need to connect to the neutral bus bar.
Clamp Sub CTs around the circuit
If you don’t have Sub CTs(2.5mm audio plug), skip this step.
- Open the clasps on the Sub CTs to see the arrow (P1→P2) or (K→L) or you can find it on the sticker on the outside of the clamp. This is the direction of CT.
- Clamp each Sub CTs around the circuit you wish to monitor. Make sure the arrow on the CT must point towards the load or Inverter! Note: If the circuit you are monitoring can generate energy such as Inverter, etc., after all the wiring is completed, please manually set the phase of the circuit in the app settings, otherwise the power measurement will be incorrect.
- Insert each 2.5mm audio plug of Sub CT into the audio jack on the side of the Power Meter. Remember the number of the audio jack connected to the circuit you are measuring, and you may need to match it on your app.
Wiring reference
Most in European 3-phase homes and US Commercial systems
Most in US homes with Load Monitoring
Most in US homes with Solar Monitoring
Most in European 1-phase homes
Configure Network
Download App
Please download the application: Smart Life from App Store or App Market. Also
you can scan below QR code to download and install.
Method 1:
- Open Smart Life app and click the ‘Scan’ button in the upper right corner of the App Home page.
- Scan the following QR code to configure the network.
Method 2:
- Power on the power clamp.
- Make sure the LED indicator is flashing green. If not, please reset it.
- Open Smart Life app and turn on Bluetooth on your phone.
- Open the app and the scanned devices will pop up automatically.
- If no prompt box pops up automatically, please click the ‘+’ on the top right of the home page to add the device. It will search nearby devices.
- After clicking ‘Add’, enter your home Wi-Fi account and password (Cannot support 5GHz Wi-Fi!) and wait for it to be added.
Mounting
The mounting bracket supports rail installation, you can click the three hooks on mounting bracket to the Din-Rail.
Locate the hooks of the mounting bracket and line up the hooks with the mounting holes on the Power Meter. Fit the hooks into the mounting holes as the picture below. Installation is now completed.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>