PYTES 1U HUB Battery Management System User Manual
- July 9, 2024
- Pytes
Table of Contents
PYTES 1U HUB Battery Management System
Specifications
- Nominal Operating Voltage
- Communication Consumption
- Power Protection Rate
- Dimensions (WDH)
- Weight
- Operating Temperature
Rack Installation
- Place the 1uHub on the rack guide rail and push it as far as it will go.
- Fix the 1uHub to the rack using the provided screws and screw nuts.
Cable Connection
- Connect Port 0 to Link Port 0 on 1uHub with the 220mm Communication Cable.
- Connect the batteries into a group/Cluster. Link one battery Port 0 to the other battery Port 1 one by one. Leave the Port 0 of the master battery empty.
FAQ
Q: Can I use batteries from other brands with the 1uHub?
A: No, the 1uHub is only compatible with batteries from PYTES.
Introduction
YTES 1uHub is to achieve the function of parallel communication between
multiple clusters of batteries and inverter.
It matches with batteries from PYTES, not with batteries of other brands.
Panel Schematic
No. | Name | Label | Function |
---|---|---|---|
1 | Power Button | Power ON/OFF | Turn on/off 1uHub |
2 | DIP Switch | Add | Communication protocal address with PCS. 4 DIPs |
3 | RS232 Port | Console | Local Communication to PC, RS232 Protocal. RJ45 Port |
4 | CAN Port | CAN | Output Battery information. CAN Protocal. RJ45 Port |
5 | RS485 Port | RS485 | Output Battery information. RS485 Protocal. RJ45 Port |
6 | Cascade Communication Port | Link Port 0 | Link Port 0: to Connect to Port 0 |
of Interface Link Port 1: Reserved
7| Link Port 1
8| 48V DC IN| Power| XT60 Port
9
|
Interface
|
Port0 ~ Port9
| RJ45 Port
Port0: Reserved to Connect to Link Port 0
Port1~Port9: Communication with the Master Battery of each Clusters.
10| Indicator Lights| RUN/Alarm| Green indicator: it will flash when power on Red indicator: it will be on when system alarm
Technical Specs
Nominated Operation Voltage | 48Vdc |
---|---|
Communication | CAN/RS485/RS232 |
Consumption Power | 2W |
Protection Rate | IP20 |
Dimensions(WDH) | 48225045mm / 199.841.77″ |
Weight | 2.2kg / 4.85lbs |
Operation Temperature | -20°C~60°C / -4°F~140°F |
Front View
Packing List
No. | Item | Quantitty | Remarks |
---|---|---|---|
1 | 1uHub | 1pc | |
2 | Screws | 4pcs | fix 1uHub to Rack |
3 | Screw Nuts | 4pcs | fix 1uHub to Rack |
4 | Power Cable | 1pc | XT60/M6 Lug |
5 | 220mm Communication Cable | 1pc | CAT6. Connect Port 0 to Link Port 0 |
6 | 1500mm Communication Cabl | e1pc | CAT6. Pin 3-4,4-5, Hub to Inverter |
7 | RJ45 Connector | 2pcs | Spare pieces |
8 | User Manual | 1pc |
Installation
Before installation, check whether all the items are complete according to Packing List. Make sure that the inverter, battery and HUB are powered off.
Rack installation
Place the 1uHub on the rack guide rail and push the 1uHub as far as it will
go.
Fix the 1uHub to rack by 4 screws and screws nuts provided in the package.
Cable Connection
-
Connect Port 0 to Link Port 0 on 1uHub with the 220mm Communication Cable.
-
Connect the batteries into a group/Cluster *.
Link one battery Port 0 to the other battery Port 1 one by one. Leave the Port 0 of master battery empty. -
Define battery groups sequence by setting DIP switch of each master battery.
-
Black Bar indicates the DIP position
If the DIP switch of your battery is 4-digit, please only set the first 4 DIPs and the firmware upgrade needs to be performed- Connect Master Batteries from each group to 1uHub with standard pin communication cables. The cable goes from CAN port of each master battery to Port 1~Port 9 on 1uHub.
- According to inverter brand, connect inverter to 1uHub, CAN or RS485 port with custom pin communication cable.
a 3-4/4-5 cable is included in 1uHub package. 1uHub to Inverter Communication Pin Numbers. - Set DIP Switche on 1uHub according to inverter brand.* Black Bar indicates the DIP position
- Connect 1uHub power cable XT60 to DC input, the other end to main power with a 48V transformer. 1uHub can also be powered by your battery by connecting the power cable to battery external interface.
Operation
Switch on the batteries, 1uHub and inverter.
The green indicator light will be on, which indicates it is running normally.
Warranty Card
Name|
---|---
Installation Date|
**** Installation Address|
Battery Model|
Inverter Model|
Email|
Shanghai PYTES Energy Co., Ltd.
Address: No. 3492 Jinqian Road, Fengxian DST, Shanghai China 201406 Tel: +86
21 57475852
Website: www.pytesgroup.com
Email: ess_support@pytesgroup.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>